- Interstate 295 (District of Columbia)
Infobox road
route=295
type=I
length_mi=8.05
length_round=2
length_ref= [ [http://www.fhwa.dot.gov/reports/routefinder/table2.htm Route Log - Auxiliary Routes of the Eisenhower National System Of Interstate and Defense Highways - Table 2] ]
year_established=
direction_a=South
terminus_a=
junction=jct|state=DC|DC|295 inAnacostia, DC
direction_b=North
terminus_b=Jct|state=DC|I|695 inWashington, DC
browse=md browse|previous_type=MD|previous_route=292|route=MD|next_type=MD|next_route=295Interstate 295 (I-295) in the
U.S. state ofMaryland and inWashington, D.C. is a convert|8.05|mi|km|sing=on spur route connecting I-95/I-495 andMaryland Route 210 (Indian Head Highway) on thePotomac River (just outside the District's boundary with Maryland) to Interstate 695 in downtown Washington.Route description
Although I-295 technically begins at the Capital Beltway (I-95/I-495), a pair of mainline ramps connects the southern terminus of the route to the nearby MD 210. Continuing north from this interchange, I-295 enters the
District of Columbia ; the route is only convert|0.8|mi|km long in Maryland. The highway is known throughout as the Anacostia Freeway.Passing to the west and north of
Oxon Hill Farm , the route parallels thePotomac River , running through the Southeast quadrant of D.C. It passes close toShepard Parkway and forms the eastern boundary ofBolling Air Force Base and theAnacostia Naval Station . Near the southern end ofAnacostia Park the route turns east and begins to parallel theAnacostia River , interchanging with South Capitol Street near the latter's crossing of the river.Within the park, I-295 encounters the southern end of the
11th Street Bridges and exits from itself onto the bridges; the mainline freeway through the interchange assumes the identity ofD.C. Route 295 . The route continues to Baltimore, though it changes identities several times: I-295, DC 295, MD 201, theBaltimore-Washington Parkway (an unnumbered federally ownedexpressway operated by theNational Park Service ), and MD 295.I-295 the crosses the
Anacostia River and interchanges with I-695, an unfinished connector highway known as the Southeast Freeway. Within this interchange, it is unclear if I-295 comes to an end or if it turns west along the Southeast Freeway to terminate at I-395 within the District.History
The Anacostia Freeway was first conceived by the
National Capital Park and Planning Commission in 1950 as a connector route between theBaltimore-Washington Parkway at Kenilworth Avenue and the Capital Beltway near Oxon Hill. The route would provide access to the Anacostia waterfront, which includedBolling Air Force Base and theAnacostia Naval Station . In 1955, District officials approved the portion of the route between Suitland Parkway and E Capitol Street; the remainder of the route was approved in 1956. The southern portion of the route, from the Beltway to the 11th Street Bridges, was given a financial boost when it was included in theInterstate Highway System . The route was designated I-295 byAASHO in 1958.The first convert|7.8|mi|km of the route opened on
August 7 ,1964 when the connecting segment of the Capital Beltway opened. In 1990, the freeway was extended convert|1.7|mi|km south to connect with MD 210, to remove the significant traffic flow between the two routes from the segment of the Beltway between both interchanges.East Leg
Under the 1971 D.C. freeway plans, I-295 would have turned east at the northern end of the
11th Street Bridges and followed the Southeast Freeway as far asEast Capitol Street , where it would turn north and follow the East Leg of the Inner Loop freeway. The East Leg, six lanes wide, would have curved around the far eastern edge of the downtown area, passing beneath Mt. Olivet Road in a 1/2 mile tunnel, before terminating at I-66 and I-95 north ofUnion Station , providing access to the North Leg Freeway, the North Central Freeway, and theNew York Avenue Industrial Freeway .Future
Two major interchange projects are currently either under study or under construction on I-295.
Woodrow Wilson Bridge project
As part of the larger
Woodrow Wilson Memorial Bridge reconstruction project, the southern terminus of I-295 is being significantly rebuilt. Several new connections are being constructed to link the Beltway, MD 210 and I-295 with the new convert|300|acre|km2|1|sing=onNational Harbor site, being built on the shore of thePotomac River inPrince George's County, Maryland . The interchange is also being rebuilt to accommodate future ramps for proposed HOV lanes on the Beltway. The project is due to be completed in stages from 2008 to 2011.11th Street Bridges project
A major project is currently under study to significantly rebuild the interchange between I-295, DC 295 and the 11th Street Bridges. Due to the cancellation of both the remainder of the Southeast Freeway and the newer
Barney Circle Freeway , there are no through connections between the 11th Street Bridges and DC 295, leading to severe congestion and major traffic routing problems. A proposed project would construct the missing movements at this interchange, allowing direct freeway-grade access to and from DC 295 at the 11th Street Bridges, as well as provide a through grade-separated north-south route within D.C. The project is scheduled to begin construction in 2011.Exit list
References
External links
* [http://www.mdroads.com/routes/is295.html I-295 @ MDRoads.com]
* [http://www.kurumi.com/roads/3di/i295.html#295dc I-295 on Kurumi.com]
* [http://www.dcroads.net/roads/anacostia/ Steve Anderson's DCroads.net: Anacostia Freeway (I-295 and DC 295)]
* [http://www.roadstothefuture.com/DC_Interstate_Fwy.html "Roads to the Future": Washington D.C. Interstates and Freeways]
Wikimedia Foundation. 2010.