Epping Ongar Railway

Epping Ongar Railway

Infobox rail line
name = Epping Ongar Railway
color =

logo_width = 250px


image_width =
caption =
type = Heritage railway
system =
status =
locale = Essex
start =
end =
stations =
routes =
ridership =
open = 2004
close =
owner = Epping Ongar Railway Ltd.
operator =
character =
depot =
stock = British Rail Class 117
linelength =
tracklength =
notrack = Single track throughout
gauge = Standard gauge
el =
speed =
elevation =


map_state = collapsed
The Epping Ongar Railway operates on a preserved railway along the final section of the old Great Eastern Railway and London Underground Central Line branch line between Epping and Ongar, with an intermediate station at North Weald. The line was reopened in late 2004 after 10 years of closure, presently operating a Sunday and Bank Holiday service using a Class 117 diesel multiple unit, running between Ongar and Coopersale. The service is provided by volunteers who maintain the line as well as run the trains. The land and infrastructure is owned by a separate company, Epping Ongar Railway Ltd.

The line is presently closed to facilitate major engineering works, with an expected reopening of Easter 2008.

Early workings

The connection to Ongar was made in 1865 by the Eastern Counties/Great Eastern Railway. The eastern section of the line, between Epping and Ongar, was always single track, with just one passing loop at North Weald station, and approximately 14 trains each day went as far as the rural station, with the rest terminating at Epping or Loughton.

This remained the case until 1949, [cite book | title = Moving people in tomorrow's world | author = Institution of Civil Engineers | year = 1987 | pages = p. 42 | publisher = Thomas Telford | isbn = 0-7277-0391-9] when the London Transport Passenger Board's New Works scheme extended the Central Line to Epping using electric trains (taking over the railway from British Rail). The Epping-Ongar branch lost its through trains to London, and a shuttle service between Epping (to connect with trains to London) and Ongar was implemented; for a short time, one could see the unusual sight of steam trains and London Underground electric multiple units side-by-side at Epping. [cite book | title = The Moving Metropolis: A History of London's Transport Since 1800 | last = Taylor | first = Sheila | coauthors = Green, Oliver | pages = p. 281 | year = 2002 | publisher = Lawrence King | isbn = 1-85669-241-8] The steam shuttle was hired by the London Transport Executive from British Rail, as it was felt there wasn't justification for electrification as far as Ongar unless patronage of the branch rose.

The 1950s saw attempts to improve the service on the branch, and eventually the line was given light electrification in 1957. [Taylor & Green 2002, p. 281.] The low-cost nature of the electrification meant that the branch could only support special two- or three-car trains—the power supply was simply not strong enough to support full-size trains,cite news | title = There's life in the old track yet | work = The Independent (London) | url = http://findarticles.com/p/articles/mi_qn4158/is_19950709/ai_n13993583 | last = Bowen | first = David | date = 1995-07-09 | accessdate = 2007-09-30] nor would the short platforms on the branch line have been long enough to support eight-car trains. Hence, the Epping to Ongar branch was normally operated as an isolated branch of the Central Line. However, for two days every year, through trains were run from London, terminating at North Weald. These trains served the North Weald airshow on the Saturday and Sunday of its opening at the aerodrome almost adjacent to the station. The normal Epping to Ongar shuttle dovetailed with this service passing the terminating train on the adjacent line during its southbound journey. The through train was operated as an extra train on the normal Central Line timetable, but was only 4 cars long.

Cutbacks and closure

From the late 1960s onwards it became ever clearer that the line's patronage wasn't growing as had been expected (mainly due to restriction of development in what was now designated Green Belt land). Even at its peak in 1971, its 650 passengers hardly made the line an economic proposition. London Underground tried to close the entire line in 1980; [cite web | url = http://www.abandonedstations.org.uk/OngarBranchPoster.html | title = Blake Hall poster advertising proposed closure | accessdate = 2008-07-17] instead, a reduced service was implemented, along with Blake Hall tube station being closed on Sundays.

Blake Hall was permanently shut in 1981;cite web | url = http://www.subbrit.org.uk/sb-sites/stations/b/blake_hall/index.shtml | title = Subterranea Britannica: SB-Sites: Blake Hall Station | last = Catford | first = Nick | work = Subterranea Britannica | accessdate = 2007-09-29] it is said that the station, before closure, handled six customers per day. [cite web | title = Epping to Ongar railway line, Essex | url = http://www.urban75.org/london/ongar.html | work = urban75 | accessdate = 2007-09-29] The station building still survives, sans platform, as a private dwelling.

North Weald station's platform one was closed in 1976, then the passing loop/westbound tracks were lifted in 1978.cite web | url = http://www.holdenf5.co.uk/epping-ongar.htm | title = The Railway to Epping & Ongar | author = The Holden F5 Trust | accessdate = 2007-09-29] Until this time, access to the two platforms was controlled from the original Eastern Counties Railway signal box still sited on the southbound platform to this day. Until this occurred, North Weald was the only section of the London Underground network to be signalled using mechanical semaphore signals.Fact|date=March 2007 On September 30 1994, the line, which was making a loss of seven pounds for each passenger journey and was in need of some expensive maintenance work,cite web | url = http://www.cravensheritagetrains.co.uk/history.htm | title = Railways to Epping and Ongar | author = Cravens Heritage Trains | accessdate = 2007-09-30] was finally closed to the public, with the Central Line now terminating at Epping Station. At the time of its closure, it was carrying a mere 80 passengers a day;cite news | last = Martin | first = Andrew | title = London Lives: Twopenny Tube | url = http://findarticles.com/p/articles/mi_qn4159/is_20030330/ai_n12737206 | work = The Independent on Sunday | date = 2003-03-30 | accessdate = 2007-09-30] local lore had it that the line was being kept open in case the Cabinet needed to be evacuated to the nuclear bunker at Doddinghurst. However, the track was left intact along with the stations (albeit in an unmaintained state).

The train that ran the final London Underground service on the line, a three car unit of 1960 stock, has been preserved by Cravens Heritage Trains. [cite web | url = http://www.cravensheritagetrains.co.uk/1960.htm | title = Cravens Heritage Trains: 1960 Train Stock | author = Cravens Heritage Trains | accessdate = 2007-09-30] [cite web | url = http://www.trainweb.org/districtdave/html/cravens_heritage_trains.html | title = Cravens Heritage Trains | work = District Dave's London Underground Site]

Purchase & reopening

The line was purchased by Pilot Developments (later Epping Ongar Railway Ltd.) in 1998.cite news | url = http://archive.clactonandfrintongazette.co.uk/2001/5/23/181466.html | title = Brentwood: Candidates in rail row | date = 2001-05-23 | work = Clacton and Frinton Gazette | accessdate = 2007-09-30] The Ongar Railway Preservation Society entered a £325,000 offer for the line, but Pilot Developments convinced London Underground to accept their slightly higher offer after the bidding deadline. [cite news | url = http://www.ongarguardian.co.uk/search/display.var.460833.0.train_line_could_be_back_on_track.php | title = Train line could be back on track | last = Lawhor | first = Anna | work = Ongar Guardian | date = 2004-02-17 | accessdate = 2007-09-30] Independent politician Martin Bell described the deal as "the most controversial land deal in the constituency for years", alleging a conflict of interest with local politicians. The line, under the running group (Epping Ongar Railway Volunteer Society), reopened on Sunday 10 October 2004, providing an hourly service between Ongar and North Weald. The line was shortly after extended to Coopersale, although no alighting facilities as yet exist here.

On Sunday 9 October 2005 the line celebrated its 1 year running anniversary, with a large number of people visiting on the day.

In early 2006 between 22 January and 9 April the line was shutdown for engineering works. This involved general station maintenance, rolling stock maintenance and track maintenance. Ongar station remained closed for engineering works and general maintenance and reopened on Sunday 28 May 2006 to passengers, although initially without the use of the station buildings.

The Easter weekend of 2007 saw the Railway's largest number of visitors on a single day since reopening, on both the Sunday and Monday. The Teddy Bear's Picnic, Anniversary of Reopening and Halloween events are also very popular.

At the end of 2007, as a result of the awarding of planning permission for the Ongar residential development (see below), the railway was sold to a new private owner who is committed to bring steam back to the line.

In early 2008 the line was closed to passenger trains in order to undertake the major engineering works in order to facilitate the return of steam to the line, such as run-round loops and signals.

Heritage railway operations

At present the line runs an hourly service each Sunday and Bank Holiday, beginning on the hour every hour at Ongar, arriving at North Weald at 13 minutes past the hour before departing for Coopersale, and returning to North Weald for pick up and set down at 33 minutes past the hour, subsequently leaving for Ongar. The first train leaves Ongar at 11:00, with the last returning at 15:50 (16:50 between April and September).

Passenger services on the heritage line are operated by Class 117 diesel multiple units, cars51342 and 51384. The line operates two diesel shunters, one a Drewry shunter (works number 2566, current number D1995), named "Heather" by the railway, ["Mixed Traffic", [http://ukhrail.uel.ac.uk/eor/MixedTraffic002.pdf Issue 2] , April 2005. Retrieved 2007-09-29.] and two Ruston 88 shunters (RH 512572 is in service, RH 398616 is being used for spares and as a static display).cite web | url = http://www.eorailway.co.uk/departments/cwl/ | title = Epping Ongar Railway - Carriage, Wagon & Locomotive Department | accessdate = 2009-09-29] The line employs a Harsco tug unit ("Badger") for engineering work. ["Mixed Traffic", [http://ukhrail.uel.ac.uk/eor/MixedTraffic008.pdf Issue 8] , September 2006. Retrieved 2007-09-29.] The EOR's fleet also includes a small works trolley, a Shark brake van, a Dogfish ballast hopper, and a box van for permanent way duties.

The railway also owns four Finnish steam locomotives, and two wooden-bodied Finnish coaches. Servicability aside, these will not, and can not, be used for passenger services; they are of a different (5 ft) track gauge to the railway lines.

The railway at one point owned at least two trains of 1962 tube stock. Units 1616 and 1491 (formed as an eight-car unit) were purchased in 1996, and unit 1744 was purchased in 1998. These units were taken away to be cut up for scrap in 1998 and 2003, respectively, after they were destroyed by vandals. [cite web | url = http://www.squarewheels.org.uk/rly/stock/1962tubeStock/ | title = 1962 tube stock | work = SQUAREWHEELS.org.uk | accessdate = 2007-09-30]

Future plans

*Epping Glade: It is intended to extend trains to Epping, with the current plans having the train terminating at a new station near to the present London Underground Epping station, called Epping Glade. This will require significant investment and will be tackled once the line has re-opened with steam services.
*Coopersale Halt: The possibility of building a halt at Coopersale village where the train presently stops is under consideration, subject to investment and a possible consultation with residents.
*North Weald: It is intended to rebuild the passing loop here, signalled with both semaphore and heritage colour light signals. This will enable an increased service frequency, and is a key step towards towards reintroducing steam trains on the line.
*Steam Steam reintroduction is an objective for the railway. Tank locomotives will likely be used for the majority of services because of the line's short platforms.

Ongar residential development

The railway has been the source of political wrangling since it was abandoned by London Underground Ltd. Its former owners, Epping Ongar Railway Ltd., have been awarded planning permission for a large portion of land at Ongar station, previously the site of the goods yard, for residential development. This has been met with much hostility from local government and local residents who believe that such development will be detrimental to the future of the railway in terms of rail vehicle storage and maintenance depots.

See also

*London Underground Central Line
*Epping Underground station
*North Weald Underground station
*Blake Hall Underground station
*Ongar Underground station

References

External links

*commonscat-inline
* [http://www.eorailway.co.uk/ Epping Ongar Railway official website] - More information can be found at the official site
* [http://www.eorailway.co.uk/news/ Epping Ongar Railway News] - The lastest news about Epping Ongar Railway
* [http://www.eohistory.bravehost.com Epping and Ongar Railway History] - An unofficial site by one of the members of the Volunteer Society on the railway's history.
* [http://www.abandonedstations.org.uk/Ongar_Branch.html London's Abandoned Tube Stations] - Photographs of the Epping-Ongar line between 1977 and 1981


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Ongar railway station — Ongar Location Place Chipping Ongar Area Epping Fores …   Wikipedia

  • Epping Forest (district) — Epping Forest is a local government district of the county of Essex, England. It is named for Epping Forest, of which the district contains a large part. It lies to the north of Greater London, but is not part of it.ettlementThe north east of the …   Wikipedia

  • Epping Forest (District) — Epping Forest District Lage in Essex Status District Region East of England Verw.grafschaft Essex …   Deutsch Wikipedia

  • Ongar — ist eine geschlossene Station der London Underground am nordöstlichen Ende der Central Line. Sie war von 1865 bis 1994 in Betrieb, war die am östlichsten gelegene Station des gesamten Underground Netzes. Sie liegt im Ort Chipping Ongar in dem zu… …   Deutsch Wikipedia

  • Ongar (London Underground) — Bahnhof Ongar 1980 Ongar ist eine geschlossene Station der London Underground am nordöstlichen Ende der Central Line. Sie war von 1865 bis 1994 in Betrieb und war die am östlichsten gelegene Station des gesamten Underground Netzes. Sie liegt im… …   Deutsch Wikipedia

  • Epping (London Underground) — Stationsgebäude Bahnsteig Epp …   Deutsch Wikipedia

  • Epping and Ongar Rural District — infobox historic subdivision Name= Epping and Ongar HQ= Epping Status= Rural district Start= 1955 End= 1974 Replace= Epping Forest District Borough of Brentwood Epping and Ongar Rural District was a rural district in the county of Essex, England …   Wikipedia

  • North Weald railway station — North Weald Location Place North Weald Area Epping Forest …   Wikipedia

  • Chipping Ongar — Coordinates: 51°42′11″N 0°14′38″E / 51.703°N 0.244°E / 51.703; 0.244 …   Wikipedia

  • Epping tube station — Epping on the London Underground is the eastern terminus of the Central Line. The preceding station to Epping is Theydon Bois, which is approximately three minutes travelling time away. Epping station is in the Epping Forest District of Essex and …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”