Pontypridd, Caerphilly and Newport Railway

Pontypridd, Caerphilly and Newport Railway

The Pontypridd, Caerphilly and Newport Railway connected the collieries of the Aberdare and Rhondda valleys directly with the new Alexandra Docks at Newport.

Using the Taff Vale Railway lines above Pontypridd, it ran on its own metals to Penrhos where it connected with Caerphilly station of the Rhymney Railway. It then ran on the Brecon and Merthyr Railway through Machen to Bassaleg junction for connection to either the Alexandra Docks, or Newport High Street station for passengers connecting to the South Wales Railway or the London and North Western Railway.

The line closed to passengers in 1962, and was shut to freight from 1965. The northern stretches of the lines from Upper Boat to Pontypridd forms the redeveloped dual carriageway sections of the A470 road, while the southern convert|3.5|mi|km|sing=on section from Rhydyfelin to Penrhos form part of the Taff Trail cycleway, constructed at a cost of £42,000

Background

The need for the PC&NR was brought about by the stranglehold of the Taff Vale Railway on railway traffic to both the Aberdare and Rhondda valleys.

From 1870 onwards, the demand for Rhondda steam coal was expanding quicker than the infrastructure of the Taff Vale Railway and Cardiff docks could provide. In 1874 the total coal and coke exported from Cardiff and Penarth was 2,886,000 tons, which had risen to 7,774,828 tons by 1882. By 1880 a train typically took 23 hours to travel from the Ocean Colliery to Bute Dock, and 27 hours for the empty wagons to return. This slowed production, as no additional railway capacity had been built, and only the Roath Basin provided additional dock capacity [ [http://www.therhondda.co.uk/transport/railways.html Rhondda Railways ] ] .

Two attempts were made to break the monopoly of the Marquess of Bute. The Barry Railway and Docks built at a cost of £2 million a new dock at Barry Island with a railway connecting with Rhondda above the narrow Tongwynlais gorge. The first coal was shipped on 18 July, 1889, with a second dock opened in 1898, and a third in 1914. On 16 March, 1896 the main line between Porth and Barry was opened for passenger traffic, to connect with the paddle steamers of P and A Campbell. The second was the provision of the Rhondda and Swansea Bay Railway company to provide access to Swansea docks, but due to the incline through the Rhondda Tunnel this was only a commercial proposition for the collieries furthest up the Rhondda Fawr.

The other driver behind the building of the PC&NR was to provide a direct route to the Alexandra Dock, thereby reducing both the time and cost of shipping coal directly to the new facility. Lord Tredegar and Sir George Elliot of Powell Duffryn collieries agreed that the only way to secure the future income of the Alexandra docks was the provision of a direct railway routeHutton, John: "The Newport Docks and Railway Company" Pub: Silver Link, ISBN 1 85794 163 2] .

PC&NR

Although formed by the same directors of the Alexandra Docks & Railway Company, the PC&NR was formed as a separate company to the Alexandra Docks & Railway Company for various investment, tax, political and operational reasons.

Construction

Incorporated by an Act of Parliament on 8 August, 1878, the line was engineered by Sir James W. Szlumper, and double tracked from Pontypridd to Rhymney, where it joined the metals of the Rhymney Railway at Penrhos junction to access Caerphilly station.

Local passenger trains terminated at Caerphilly, but through passenger and freight services continued over the Brecon and Merthyr Railway's Caerphilly branch to Bassaleg, where at West Mendelgief junction the PC&NR trains joined the metals of the Alexandra Docks Railway; through passenger services terminated at Newport High Street station for connection to either the Great Western Railway, the London and North Western Railway or the South Wales Railway,

The single track from Caerphilly to Bassaleg provided both too little capacity for the freight traffic, as well as a challenging 1:39 climb out of Caerphilly station for loaded trains. The Machen Loop Act of 1887 gave the PC&NR the right to double track the route, with a diverged route from Gwaun-y-Bara junction to Machen providing a 1:200 slope for loaded trains. The new double track came into operation on 14 September, 1891, and was immediately transferred to the Brecon and Merthyr Railway; which in return paid 50% of the annual net earnings from the Caerphilly branch to the PC&NR.

In 1883, PC&NR agreed a plan to use the Nixons Private Railway and Powell Duffryn Private Railway to run up the valley from Abercynon to Aberdare

Operations

Trains were operated by initially under agreement with the Taff Vale Railway, who hauled private owner wagons using their own engines over the PC&NR. In doing so the Taff Vale Railway hoped to incorporate the PC&NR quickly in to its system. The first train of coal left Pontypridd on 7 July, 1884; picking up the Brecon and Merthyr pilot engine at Caerphilly. However, on reaching Bassaleg, the GWR refused the train access to Alexandra Docks. After some negotiation, the GWR relented and trains began operating from the 25 July, but neither the PC&NR or the Alexandra Dock were amalgamated with the TVR or GWR as quickly as the larger companies would have liked. Although bitter rivals (the TVR was also more profitable than the Great Western) the two companies were united in their desire to avoid allowing additional competition to spring up.

This situation continued until halted at the TVR's request, when the PC&NR purchased ten locomotives from the newly electrified Mersey Railway, and started its own freight operations from the 30 April, 1906. They also purchased some elderly locomotives and stock from the GWR, which were ironically returned to the Great Western in 1923 - although they were some 20 years older, the Great Western kindly allowed them to regain their former numbers.

Passenger services were run in two forms:
*Through services: started from Pontypridd on the 28 December, 1887 with three trains running each way to Newport. From 1 January, 1899 the GWR took over, increasing traffic to four trains each way per day
*Local services: started from Pontypridd Tram Road halt on the 28 December, 1887. On 1 September, 1904 the new Alexandra Docks and Railway Company again took over running of local services, from its own Pontypridd Tram Road halt to the Rhymney Railways Caerphilly station. This made connection with the Brecon and Merthyr services difficult, and so from 1 January, 1917 services were extended to the B&MR's Machen station. Local service were operated by a "push-pull" train with one or two carriages, which from 1904 were slowly replaced by railmotor sets, built by the Glasgow Railway and Engineering Company of Govan. Seven halts opened on route

This operational situation continued until the Railways Act 1921, when the PC&NR was grouped under the Great Western Railway.

Closure

The line survived well, fuelling the growth of Newport docks due to its downward incline for loaded trains. Passenger traffic was ceased form 17 September, 1956; while under the Beeching Axe it was shut to freight from 1965.

The northern stretches of the lines from Upper Boat to Pontypridd forms the redeveloped dual carriageway sections of the A470 road, while the southern convert|3.5|mi|km|sing=on section from Rhydyfelin to Penrhos form part of the Taff Trail cycleway, constructed at a cost of £42,000

Chronology

The chronology for the line is as follows: [ [http://www.railscot.co.uk/Alexandra_Docks_and_Railway/frame.htm RAILSCOT | Alexandra Docks and Railway ] ] [ [http://www.railscot.co.uk/Pontypridd_Caerphilly_and_Newport_Railway/frame.htm RAILSCOT | Pontypridd, Caerphilly and Newport Railway ] ]

tations

*Pontypridd - owned by the Taff Vale Railway, which had branches northwards to Aberdare and Rhondda
*Glyntaff halt
*Trefforest halt
*Dynea halt
*Upper Boat halt
*Groeswen halt
*Nantgarew halt
**Penrhos junction - with the Rhymney Railway, over whose metals it ran to...
***Waterford road level crossing
*Caerphilly - owned by the Rhymney Railway, but accessed by the Brecon and Merthyr Railway, over whose metals the PC&NR ran to...
*Machen - terminating point for local services from 1 January, 1917. Owned by the Brecon and Merthyr Railway
**West Mendalgief junction - for access to Alexandra Docks, Newport
*Newport High Street - jointly owned and operated by the South Wales Railway and the London and North Western Railway

Local passenger trains terminated at Caerphilly until 1 January, 1917, when they extended to Machen on the Brecon and Merthyr. Freight services continued over the Brecon and Merthyr Railway's Caerphilly branch to Bassaleg, where at West Mendelgief junction the PC&NR trains joined the metals of the Alexandra Docks Railway. Through passenger services continued on to Newport High Street

References

External links

* [http://www.railscot.co.uk/Pontypridd_Caerphilly_and_Newport_Railway/frame.htm PC&NR at railscot.co.uk]


Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • Newport, Abergavenny and Hereford Railway — [v · d · …   Wikipedia

  • Newport railway station — For other uses, see Newport station (disambiguation). Coordinates: 51°35′23″N 2°59′56″W / 51.5896°N 2.9990°W / 51.5896; 2.9990 …   Wikipedia

  • Merthyr, Tredegar and Abergavenny Railway — [v · d · …   Wikipedia

  • North Wales and Liverpool Railway — The North Wales and Liverpool Railway (NWLR), was the name given to the joint committee formed to construct a railway between Bidston, on the Wirral Railway and Hawarden on the Manchester, Sheffield and Lincolnshire Railway s (MSLR) Chester… …   Wikipedia

  • Denbigh, Ruthin and Corwen Railway — Legend …   Wikipedia

  • Narberth Road and Maenclochog Railway — The Narberth Road and Maenclochog Railway was a Welsh light railway company in Pembrokeshire. Services started in January 1876. A poster advertising its Tourist tickets one shilling on Tuesdays and Thursdays The 8.5 miles (13.7 km) long line …   Wikipedia

  • Clarbeston Road and Letterston Railway — The Clarbeston Road and Letterston Railway was a small railway company formed to give the Great Western Railway a more direct route to the port at Fishguard Harbour. History A 1907 Railway Clearing House junction diagram showing (lower right …   Wikipedia

  • North Pembrokeshire and Fishguard Railway — The North Pembrokeshire and Fishguard Railway was a British railway company operating in Wales in the late 19th century[1]. History The company started off as the Narberth Road and Maenclochog Railway which was opened between Narberth Road… …   Wikipedia

  • Swansea and Mumbles Railway — Legend …   Wikipedia

  • Chester and Crewe Railway — The Chester and Crewe Railway was an early British railway company absorbed by the Grand Junction Railway in 1840. The line was 11 miles in length, the engineer was Robert Stephenson and the contractor for the work was Thomas Brassey[1]. It was… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”