- Southern Distributor Road
UK road routebox
road= A48
length-mi= 8
length-km= 12.5
direction= East - West
start= Ringland, East Newport
destinations=
end=Tredegar Park , West Newport
construction-date=
completion-date= 2004
junctions= ukmotorwaysmall|4 J.24
ukroadsmall|4042
ukmotorwaysmall|4 J.28The Southern Distributor Road (SDR) is a principaldistributor road that runs fromTredegar Park (M4 junction 28) on the west side ofNewport to the Coldra roundabout (M4 junction 24) in the east and includesCity Bridge , a bow-string arch bridge spanning theRiver Usk . Combined with the M4 in the north, the SDR effectively forms the southern part of aring road for the city.The eastern section (Ringland Way) and the western section (Docks Way) were originally built with reserved land to one side for eventual widening. The SDR plans were drawn up to make use of this land and to join the two sections together across the river to form a continuous dual carriageway from one side of the city to the other. On completion it assumed the number A48, replacing the
Chepstow Road /Cardiff Road corridors which were downgraded to B4237.The urban regeneration company
Newport Unlimited described the opening of the SDR as a critical piece of Newport'sregeneration jigsaw. The new road was designed to improve the environment in the city centre, taking traffic away from residential areas, and improving access to industrial areas in the east and south of thecity .Facts and figures
*The road and associated structures were built as part of a
Private Finance Initiative .
*The route extends from M4 junction 24 Coldra roundabout in the east, to Ebbw Bridge roundabout in the west. The A48 itself continues to M4 junction 28.
*The 8 mile (12.5 kilometre) road is a fully kerbedtarmacadam dual carriageway .
*There are link roads,roundabouts ,junction s, continuousfootpath ,cycleway s,fencing , noise barriers and street furniture.
*The centrepiece of the route is the 650 ft (200 metre)-long steel, bow string archCity Bridge over the River Usk.
*The site of the new crossing is between the 40-year-old George Street Bridge, Britain's firstcable-stayed bridge and theNewport Transporter Bridge , which is over 100 years old.
*There are nine roundabouts on the SDR and four subways.
*More than 200 staff worked on putting it together.
*4,000 cones; 127,000 tonnes ofasphalt andmacadam ; 4,000 tonnes ofsteel were used in the making of the SDR.References