- Howard Street Tunnel fire
Infobox rail accident
title= PAGENAME
date=July 18 ,2001
location= Baltimore,Baltimore
coordinates=
line =Baltimore Belt Line
cause=
trains=
pax=
deaths= 0
injuries= 0 The Baltimore Freight Rail Crash (also known as theHoward Street Tunnel Fire) was a 60-carCSX Transportation freight train derailment that occurred in a freight through-routetunnel under Howard Street inBaltimore, Maryland onJuly 18 ,2001 . The derailment sparked a chemical fire that raged for six days and virtually shut down the downtown area until the heat caused a water main to rupture, largely extinguishing the fire but also causing significant flooding in the streets above.A numerical simulation by
NIST found that the peak calculated temperatures within the tunnel were approximately 1,000 C (1,800 F) within the flaming regions, and on average approximately 500 C (900 F) when averaged over a length of the tunnel equal to three to four rail car lengths. Due to the insulation of the tunnel's thick brick walls, the temperature was relatively uniform across all the cars, approaching temperatures normally found in an oven or furnace: The peak wall surface temperature reached about 800 C (1,500 F) where the flames were directly impinging, and on average 400 C (750 F) over the length of three to four rail cars.Impact on Baltimore downtown region
Thousands of Baltimore workers were forced to leave their jobs and unable to come back for several days until the city could assure that there was no further danger from either the fire or the water main flooding. The crash also impacted MARC passenger train service for several days; bus routes were set up by the city to ferry passengers to and from the
BWI Amtrak/MARC station as an alternate route. MARC service was restored onJuly 23 ,2001 .Most of the roads around Howard Street, including I-395 spur into Baltimore, experienced extremely heavy congestion due to street closures around the intersection of Howard and Lombard Streets, where the actual water main break occurred. By
July 24 ,2001 , all but the blocks immediately surrounding the water main break were reopened to automotive traffic.Three weeks later, manhole covers flew into the air as underground explosions along West Pratt Street occurred due to residual explosive chemicals from the fire left in the sewers.
Smoke from the incident and flooding from the broken water main caused three
Baltimore Orioles baseball home games to be canceled that summer, asOriole Park at Camden Yards was directly in the danger zone caused by the fire.Impact on east coast rail traffic
The Howard Street Tunnel is the only direct rail link on CSX from Philadelphia to Washington, D.C. as CSX got rid of its street level trackage in the late 80's. The only other direct rail link is Amtrak's heavily passenger traffic north east corridor, with minority freight operations performed by Norfolk Southern. According to the U.S. Department of Transportation report on the incident, officials had long known that the possibility existed for a fire or other disaster to cause a significant problem in the Howard Street Tunnel. An article published in the "Baltimore Sun" on July 19, 2001 contains a 1985 quote from an unidentified federal transportation safety official who observed "...the problem would be getting in there to fight the fire...If you had an explosion, fire would shoot out of both ends like a bazooka." However, freight traffic on the line had been increasing for years as CSX and Conrail diverted traffic away from Amtrak lines to avoid Amtrak/Conrail crashes like the one in Chase, Maryland in 1987. Estimates from railway publications put the freight traffic through the Howard Street Tunnel at 28 to 32 trains per day.
According to a November 2005 report to Congresshttp://www.fra.dot.gov/downloads/RRDev/brn1.pdf Report To Congress: Baltimore's Railroad Network, Challenges and Alternatives, November 2006, Page 2.16 ] :
The tunnel closing caused major disruption to CSXT freight traffic, Maryland Rail Commuter (MARC) commuter trains, and to Central Light Rail Line trains and bus lines that traversed Howard Street. To avoid the Howard StreetTunnel, CSXT had to send freight trains west to Cleveland, north to Albany, New York, and then south to Baltimore, incurring a three- to four-day delay. Some CSXT trains were rerouted via the busy NS line through Manassas, Virginia,Hagerstown, Maryland, and Harrisburg, Pennsylvania.
At one point during the fire, eight CSXT trains that would have used the tunnel were detouring through Cumberland, Maryland, and Youngstown Ohio; five through Hagerstown and Harrisburg; five through Cleveland and Albany, New York; and 12 trains were stopping in various yards.
According to the DoT report on the incident, firefighting efforts could not begin until the exact location of the fire within the tunnel could be found, which finally occurred at 5:00 a.m. (Eastern Daylight Time, 10:00
UTC ) onJuly 19 ,2001 . Work on repairing the break in the water main enabled the firemen to find a manhole cover on Howard Street through which they could gain access to both the broken water main and the tunnel itself, and firefighting efforts began in earnest. Three rail cars (boxcars of paper and plywood) were removed from the tunnel and their flaming contents were extinguished the morning ofJuly 22 ,2001 . Once the water main break was finally stopped on the same day, tunnel inspectors could enter the area. Amazingly, there were no significant structural damages, and the tunnel was officially reopened to traffic at 7:45 a.m. onJuly 23 ,2001 .Impact on other services
Beyond the adverse effects on railroad traffic, there was a massive effect on life and activities in downtown Baltimore. The incident forced the closing of streets and business over much of downtown for several days.
The severed fiber-optic cable in the tunnel was a major east coast internet communication link belonging to
WorldCom . The break slowed internet service around the US for several hours; water from the water main break caused further damage to the communication lines. According to the DoT report, WorldCom was able to install a fully-redundant network bypass around the incident within 36 hours, allowing resumption of east coast and transatlantic internet communications.The aftermath of the fire affected some activities for longer periods.
* MTA shut down light rail service through the city for over seven weeks, with shuttle buses running between the North Avenue and Patapsco stations, and later between North Avenue and Camden.
* The Howard and Lombard streets, one of the busiest in the city, was not re-opened until September 5.See also
*
List of rail accidents External links
* [http://www.ntsb.gov/publictn/2004/RAB0408.htm NTSB report DCA-01-MR-004]
* [http://fire.nist.gov/bfrlpubs/fire03/art086.html NIST numerical simulation of the fire]
* [http://www.its.dot.gov/JPODOCS/REPTS_TE/13754.html Effects of Catastrophic Events on Transportation System Management and Operations] - DOT report
* Report To Congress: Baltimore's Railroad Network, Challenges and Alternatives, November 2005
** [http://www.fra.dot.gov/downloads/RRDev/brn1.pdf Part 1: Challenges] , discussing the history and recent state of Baltimore rail infrastructure.
** [http://www.fra.dot.gov/downloads/RRDev/brn2.pdf Part 2: Alternatives] , discussing possible new tunnel alignments.Notes and references
Wikimedia Foundation. 2010.