List of Milan metro stations

List of Milan metro stations

The Milan Metro Stations is comprised of both a subway and a light rail. It is located in Milan, Italy

ubway Metropolitana Line MM1 - Red

*Monza Bettola (under construction)
*Monza Restellone (under construction)
*Sesto San Giovanni 1°Maggio/F.S. "(S7-S8-S9)"
*Sesto San Giovanni Rondò
*Sesto San Giovanni Marelli
*Villa San Giovanni
*Precotto
*Gorla
*Turro
*Rovereto
*Pasteur
*Loreto "(MM2)"
*Lima
*Porta Venezia "(PF-S1-S2-S5-S6-S10)"
*Palestro
*San Babila
*Duomo "(MM3)"
*Cordusio
*Cairoli
*Cadorna F.N.M./Triennale "(MM2-S3-S4-Malpensa Exp)"
*Conciliazione
*Pagano

North-West branch

*Buonarroti
*Amendola Fiera 1
*Lotto Fiera 2
*Q.T.8
*Lampugnano
*Uruguay
*Bonola
*San Leonardo
*Molino Dorino
*Pero
*Rho Fiera T.A.V. "(PF-S4-S5)"

outh-West Branch

*Wagner
*De Angeli
*Gambara
*Bande Nere
*Primaticcio
*Inganni
*Bisceglie
*Valsesia (planned)
*Baggio (planned)

ubway Metropolitana Line MM2 - Dark green

North-East Branch

*Gessate
*Cascina Antonietta
*Gorgonzola
*Villa Pompea
*Bussero
*Cassina de' Pecchi
*Villa Fiorita
*Cernusco sul Naviglio
*Melghera (planned)
*Cascina Burrona
*Vimodrone

Northern Branch

*Cologno Monzese Nord
*Cologno Monzese Centro
*Cologno Monzese Sud
*Brugherio (planned for 2010)
*Carugate (planned for 2010)
*Caponago (planned for 2010)
*Agrate Brianza (planned for 2010)
*Concorezzo Colleoni (planned for 2010)
*Burago (planned for 2010)
*Vimercate Torri Bianche (planned for 2010)

Main Line

*Cascina Gobba (LRT San Raffaele)
*Crescenzago
*Cimiano
*Udine
*Lambrate F.S. "(S9)"
*Piola Cittàstudi
*Loreto (MM1)
*Caiazzo
*Centrale F.S. "(MM3)"
*Gioia
*Garibaldi "(PF-S1-S2-S5-S6-S7-S8-S10)"
*Moscova
*Lanza/Brera/Piccolo Teatro
*Cadorna F.N.M./Triennale "(MM1-S3-S4-Malpensa Exp)"
*Sant'Ambrogio
*Sant'Agostino
*Porta Genova F.S.
*Romolo "(S9)"
*Famagosta

outh-East Branch

*Abbiategrasso

outhern Branch

*Cantalupa/Boffalora (planned 2010)
*Rozzano Milanofiori (under construction, end of works 2008)
*Assago Forum (under construction, end of works 2008)

ubway Metropolitana Line MM3 - Yellow

*Paullo (planned)
*Bettolino di Mediglia (planned)
*Peschiera B. Bellaria (planned)
*Peschiera B. Idroscalo (planned)
*San Donato Milanese
*Rogoredo F.S. "(PF-S1-S2)"
*Porto di Mare
*Corvetto
*Brenta
*Lodi T.I.B.B. "(S9)"
*Porta Romana
*Crocetta
*Missori
*Duomo "(MM1)"
*Montenapoleone
*Turati
*Repubblica "(PF-S1-S2-S5-S6-S10)"
*Centrale F.S. "(MM2)"
*Sondrio
*Zara
*Maciachini
*Dergano (under construction, end of works 2008)
*Affori Centro (under construction, end of works 2008)
*Affori F.N.M. "(S2-S4)" (under construction, end of works 2008)
*Comasina (under construction, end of works 2008)

ubway Metropolitana Line MM4 - Light Blue

outh-West Branch

*Lorenteggio (proposed)
*Corsico Caboto (proposed)
*Corsico liberazione (roposed)
*Corsico Lavagna (proposed)
*Corsico Tessera (proposed)
*Trezzano S/N Galvani (proposed)
*Trezzano S/N Zingone (proposed)

Main Line

*San Cristoforo "(S9)" (works from 2007)
*Segneri (works from 2007)
*Gelsomini (works from 2007)
*Frattini (works from 2007)
*Tolstoj (works from 2007)
*Washington (works from 2007)
*Foppa
*Parco Solari (works from 2007)
*San Vittore (works from 2007)
* [Sant'Ambrogio "(MM2)" (works from 2007)
*De Amicis (works from 2007)
*Vetra (works from 2007)
*Santa Sofia (works from 2007)
*Crocetta/Policlinico "(MM3)" (works from 2007)
*Sormani (works from 2007)
*Visconti di Modrone "(interchange with San Babila station MM1)" (works from 2007)
*Tricolore (works from 2007)
*Dateo "(S1-S2-S5-S6-S10)" (works from 2007)
*Susa (works from 2007)
*Argonne (works from 2007)
*Mezzofanti (works from 2007)
*Corsica (works from 2007)

Note: It is not clear whether "works" means "in operation" or "under construction."

East Branch

*Parco Forlanini (works from 2007)
*Aeroporto di Linate (works from 2007)

outh-East Branch

*Ovidio (planned from 2010)
*Mecenate (planned from 2010)
*Fantoli (planned from 2010)
*Santa Giulia Congressi (planned from 2010)
*Santa Giulia Paullese (planned from 2010)
*Rogoredo "(MM3-S1-S2)" (planned from 2010)

ubway Metropolitana Line MM5 - Purple

*Harar (planned from 2010)
*Stadio San Siro (planned from 2010)
*Esquilino (planned from 2010)
*Segesta (planned from 2010)
*Lotto (MM1) (planned from 2010)
*Portello (planned from 2010)
*Tre Torri (planned from 2010)
*Domodossola (S3-S4-FNM) (planned from 2010)
*Gerusalemme (planned from 2010)
*Cenisio (planned from 2010)
*Monumentale (planned from 2010)
*Garibaldi "(MM2-PF/MM4-S1-S2-S5-S6-S7-S8-S10)" (under construction from Autumn 2005)
*Isola (under construction from Autumn 2005)
*Zara "(MM3)" (under construction from Autumn 2005)
*Marche (under construction from Autumn 2005)
*Istria (under construction from Autumn 2005)
*Cà Granda (under construction from Autumn 2005)
*Rodi (under construction from Autumn 2005)
*Bicocca /Università II° (under construction from Autumn 2005)
*Bignami (under construction from Autumn 2005)
*Sesto San Giovanni Parco Nord (under construction from 2008)
*Cinisello Balsamo Lombardia (under construction from 2008)
*Cinisello Balsamo Brianza (under construction from 2008)
*Monza Bettola "(MM1)" (under construction from 2008)
*Monza Philips (planned from 2010)
*Monza F.S. "(S7-S8-S9)" (planned from 2010)
*Monza Arengario/Duomo (planned from 2010)
*Monza Villa Reale (planned from 2010)
*Monza San Gerardo (planned from 2010)
*Monza Virgilio (planned from 2010)

Passante Ferroviario - Dark Blue

outhern Branch

*Rogoredo F.S. "(MM3-S1-S2)" (under construction, end of works 2008)

Eastern Branch

*Pioltello F.S. "(S5-S6)"

Main Line

*Porta Vittoria "(S1-S2-S5-S6-S10)"
*Dateo
*Porta Venezia
*Repubblica "(MM3-S1-S2-S5-S6-S10)"
*Garibaldi "(MM2-S1-S2-S5-S6-S7-S8-S10)"
*Lancetti;Northern Branch
*Bovisa Nord "(S1-S2-S3-S4-S10)"

Western Branch

*Villapizzone
*Certosa di Milano
*Rho Fiera T.A.V. "(MM1-S4-S5)" (under construction, end of works 2008)

Light Rail People Mover Line San Raffaele - Light Green

*Cascina Gobba (MM2)
*San Raffale/Milano 2

Line S

Line "S" is a new network of 10 railway lines that run from Milano city centre into the Metropolitan Area.

Other urban Station of Suburban Railways not linked with Subway System:
*San Cristoforo "(S9)"
*Tibaldi "(S9)" (under construction)
*Quarto Oggiaro "(S1-S3)"
*Bruzzano "(S2-S4)"
*Greco/Bicocca "(S7-S8-S9)"


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Milan Metro Line 4 — logo The Line 4 is a new underground rapid transit line under construction[1] in Milan, Italy, part of the Milan Metro system. The line was planned to be completed in 2015, as part of the works for the upcoming Milan Expo. However …   Wikipedia

  • Milan Metro — Line 2 at Porta Garibaldi Info …   Wikipedia

  • Milan Metro Line 1 —      M1 Overview Type Rapid Transit System …   Wikipedia

  • Milan Metro Line 3 —      M3 …   Wikipedia

  • Milan Metro Line 2 —      M2 Overview Type Rapid Transit System …   Wikipedia

  • Milan Metro Line 5 — M5 logo Line 5 is an under construction line of the Milan Metro, Italy, that will connect the downtown Porta Garibaldi railway station with the north eastern suburb, at the via Bignami viale Testi intersection. The line will be built in several… …   Wikipedia

  • Milan Transportation System — Logos of Milan s transportation system …   Wikipedia

  • Milan Suburban Railway Network — Main article: Transport in Milan Servizio ferroviario suburbano di Milano Info …   Wikipedia

  • Milan Affori railway station — Milano Affori The new station. Location Address Affori Comune Milan …   Wikipedia

  • Milan Passerby Railway — Passante ferroviario di Milano Dates of operation 1997–present Track gauge 4 ft 8 1⁄2 in (1,435 mm) …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”