- Hampden Railroad
The Hampden Railroad built by the
Boston and Maine Railroad andNew York, New Haven and Hartford Railroad . The Hampden Railroad was chartered in 1910 and leased to the B&M in 1911, as a route from the Central Mass east ofBondsville west-southwest toSpringfield, Massachusetts to connect to the NYNH&H's Hartford and Springfield Railroad or known asNew Haven-Springfield Line .History
Palmer, Massachusetts is affectionately known as 'The Town of Seven Railroads', and is still one of the favorite spots of rail buffs to come see the trains on Depot Street (The old depot is now a restaurant called the Steaming Tender). However, there is one rail line in Palmer that never got a chance to make a name for itself.The Hampden Railroad ran between
Bondsville, Massachusetts andSpringfield, Massachusetts at Athol Junction. It was built to be an inland connector between the New Haven line and the Boston & Maine (Central Mass. division), shaving convert|3|mi|km off the usual trip from Springfield to Boston. The Hampden rail line was convert|14.8|mi|km of high class rail that never felt the wheels of a single revenue train.The Hampden Railroad was incorporated in July 1910 as a subsidiary of NYNH&H. By 1912, 90% of the grading had been finished and convert|5|mi|km of heavy line rail had been laid. By
June 23 ,1913 , the Hampden RR was practically completed (all that was left was to connect to the Central Mass), but the lease of the property was not approved by the Public Service Commission, and the rail was never opened for operation.The rail line was unbelievably straight, with at most 4 degree curves and a steepest grade of 1.23% which was over Minnechoag Mountain in Ludlow. In addition, there was not a single grade crossing. To achieve these feats required 28 bridges over the convert|15|mi|km|sing=on route, in addition to several huge grade fills and cuts. The Minnechoag cut itself was convert|4800|ft|m long and convert|70|ft|m deep.
The longest bridge on the Hampden was at Bircham Bend over the Chicopee River which ran convert|85|ft|m above the river, and was convert|1098|ft|m long. The bridge over the Swift River in Palmer was convert|400|ft|m long and ran convert|61|ft|m above the river and continued over the Central Vermont tracks. Despite being built as a freight line, there were 4 passenger stations built along it's route: East Springfield, Ludlow, Three Rivers and Thorndike.
In 1921, with more than $2,000,000 in notes overdue, and no revenue to offset them, the Hampden Railroad went into receivership. It was sold for scrap to the Roxbury Iron & Metals Co. for $30,000. The total price tag for the construction totalled $4,000,000. However, prior to the sale to Roxbury, the government commandeered the surplus rail for use in the
Watertown, Massachusetts Arsenal duringWorld War I .There is little evidence left today of the Hampden Railroad, and little to no information as to the history is available online. You can however see several remaining bridge abutments while tracing the route between East Street in Ludlow and the junction with the Central Mass. Branch of the B&M in Palmer near Forest Lake. Thousands of people drive over the
Massachusetts Turnpike just east of 291 which uses the Hampden RR alignment. Just south of the interchange one can see the concrete piers of the long Bircham Bend viaduct while riding the ramp onto the MassPike to head east.External links