- Kouris Dam
Infobox_Dam
dam_name= Kouris Dam
caption= Road photo of Kouris dam
official_name= Kouris Dam (Φράγμα Κούρη)
crosses= River Kouris
reservoir=
locale=Limassol District ,Cyprus
maint= Cyprus Water Board
length=
height= 110 m
width=
began= Sept 1, 1984
open= 1988
closed=
reservoir_capacity= 115,000,000 m3
reservoir_surface= 3.6 km3
bridge_carries=
bridge_width=
bridge_clearance=
bridge_traffic=
bridge_toll=
bridge_id=
map_cue=
map_
map_text=
map_width=
coordinates=
lat=
long=
extra= Current storage level [http://www.cyprus.gov.cy/moa/wdd/WDD.nsf/reservoir_en/reservoir_en?OpenDocument] Kourisdam is the largest of a network of 107 dams inCyprus . [cite news | first=George | last=Psyllides | coauthors= | title=Officials say Cyprus' water reserves dangerously low, could drop further if drought holds | date=August 14, 2007 | publisher=The Associated Press | url =http://www.iht.com/articles/ap/2007/08/14/europe/EU-GEN-Cyprus-Water-Shortage.php | work =International Herald Tribune | pages = | accessdate = 2007-08-20 | language = ] It lies at an altitude of 250m and collects the water delivered by the rivers Kouris, Limnatis and Kryos. Furthermore, water from Diarizos river is diverted to Kouris dam via a 14.5 km long connecting tunnel. It has an overall catchment area of 300km2. [ cite journal|title=Groundwater resources in the Kouris catchment (Cyprus): data analysis and numerical modelling|journal=Journal of Hydrology|date=10 February 2003|first=Anastasia |last=Boronina|coauthors=Philippe Renard, Werner Balderer and Andreas Christodoulides|volume=271|issue=1-4|pages=130-149|id= doi|10.1016/S0022-1694(02)00322-0|url=|format=|accessdate=2008-07-31 ] The dam is located 15 Km northwest of the city ofLimassol and 6 Km north of the village ofYpsonas . The dam has a central clay core zoned earthfill embankment with a height of 110 metres and a crest length of approximately 550 metres. For its construction the whole village ofAlassa had to be relocated to a nearby site overlooking the reservoir (between the Kouris and Limnatis valleys) at a cost of around CYP£5,000,000. [ cite web|url=http://www.audit.gov.cy/audit/audit.nsf/All/61C8761E647D3570C2256F48003CABC6/$file/Annual%20Report%202002.doc?OpenElement |title=Annual Report |accessdate=2007-01-26 |date=2002 |format=.doc |publisher=Auditor General of The Republic of Cyprus ] [cite news | first= | last= | coauthors= | title=A dam good idea | date=Friday, July 16, 2004 | publisher= | url =http://www.cyprus-mail.com/news/main.php?id=15185&archive=1 | work =Cyprus Mail | pages = | accessdate = 2007-01-26 | language = ]Its construction was opposed by environmental groups concerned about the effects of water diversion on the
Limassol Salt Lake , a wetland located downstream to the rivers and used by migratory birds. [Ramsar mission to Cyprus, point 14 [http://www.ramsar.org/wn/w.n.cyprus_akrotiri2.htm] ] The dam is part of the Southern Conveyor Project, which carries water from the SW side of Cyprus to the SE part of the island, over a distance of 120 Km. The dam has a central clay core zoned earthfill embankment with a height of 110m and a crest length of approximately 550 metres providing a water storage volume of 115 million cubic metres [Cyprus Water Board, Information on the Southern Conveyor Project [http://www.cyprus.gov.cy/moa/WDD/WDD.nsf/All/8EEF9F39E5340593C2256DEF0035466E?OpenDocument] ] .The construction of the dam was first proposed by the Cyprus Water Development board in 1968. Following several feasibility studies the French engineering company Sogreah [ [http://www.sogreah.fr/ Sogreah website] ] completed the detailed design in 1981. The contract for its construction was awarded in January 1984 to a consortium comprising
J&P construction andImpregilo of Italy.The construction cost amounted to CYP £29,000,000. Part of the funding came from the
European Investment Bank [EC Delegation to Cyprus [http://www.delcyp.cec.eu.int/en/qa/factsheets/economy.htm] ] . Construction was completed in September 1988. It was officially inaugurated by the then president,George Vassiliou , on 22 April 1989.Since its construction it has only overflowed once, on March 4, 2004. [Largest dam overflows for the first time(
Cyprus Mail archive article - Friday, March 5, 2004) [http://www.cyprus-mail.com/news/main_old.php?id=13256&archive=1] ]
=See also=
*List of reservoirs and dams in Cyprus References
Wikimedia Foundation. 2010.