The Homer Tunnel is a road tunnel in the
Fiordland region of theSouth Island ofNew Zealand , opened in 1954. It linksMilford Sound toTe Anau and Queenstown, by piercing theMain Divide at theHomer Saddle . It connects between the valley of the Eglinton andHollyford River s to the east and that of the Cleddau to the west.The tunnel is straight, and was originally single-lane and gravel-surfaced. The tunnel walls remain unlined granite. The east portal end is at 945 m elevation; the tunnel runs 1270 m at approximately a 1:10 gradient down to the western portal. [http://www.southlandnz.com/sites/southlandnz.com/images/venture/major_projects/Transport/Milford%20Issues%20and%20Options%20Vfinal.pdf Milford Sound Transport - Issues and Options] (report by
GHD Ltd forVenture Southland , in cooperation with, amongst others,Southland District Council andTransit New Zealand , 2005)] Until it was sealed and enlarged it was the longest gravel-surfaced tunnel in the world.Fact|date=June 2007History
William H. Homer and George Barber discovered the Homer Saddle on
January 27 1889 . Homer suggested that a tunnel through the saddle would provide access to the Milford area.Government workers began the tunnel in 1935 after lobbying by J. Cockburn of the
Southland Progress League . The tunnel and the associated Milford Road were built by relief workers during the Depression, initially just starting with five men using picks and wheelbarrows. The men had to live in tents in an mountaineous area where there might be no direct sunlight for half of the year. At least three were killed by avalanches over the coming decades." [http://www.ipenz.org.nz/heritage/itemdetail.cfm?itemid=128 Engineering Heritage - Homer Tunnel] " (from theIPENZ website. Accessed 2008-08-09.)]Progress was slow, with difficult conditions including fractures in the rock bringing snow flows into the tunnel. Compressors and a powerhouse in the nearby river were eventually built to pump out 40,000 litres of water per hour. Work was also interrupted by World War II (though the actual piercing of the mountain had successfully been achieved in 1940), and an avalanche in 1945 which destroyed the eastern tunnel portal. These problems delayed the tunnel's completion and opening until 1954. [http://www.teara.govt.nz/1966/H/HomerTunnel/HomerTunnel/en Homer Tunnel] (from
Te Ara Encyclopedia of New Zealand , 1966 Edition. Accessed 2008-06-18.)]afety
In 2002 a tour bus carrying tourists from
Singapore caught fire inside the tunnel, halting 150 m from the eastern portal. The passengers and the bus driver had to tread through the pitch-dark and smoke-filled tunnel to safety with the help of head beams from vehicular traffic at the entrance of the eastern portal. However, two passengers got separated and made their way to the Milford end. Three people were flown to Southland Hospital and treated for smoke inhalation. [cite web|url=http://www.nzherald.co.nz/section/1/story.cfm?c_id=1&objectid=3002487|title='Miracle' escape from bus blaze|date=November 4 2002 |work=New Zealand Herald |accessdate=2008-04-28] A satellite phone and fire extinguishers were installed in the tunnel as a result of this incident. Two tourist buses were destroyed by fire outside the tunnel in January and March 2008, though the fires were not related to the tunnel. [cite web|title=Fire in tourist bus at Homer tunnel|url=http://www.tv3.co.nz/News/Story/tabid/209/articleID/48626/cat/41/Default.aspx|date=7 March 2008 |work=TV3|accessdate=2008-04-28] [cite web|title=Tourists flee unhurt as bus bursts into flames|url=http://www.nzherald.co.nz/topic/story.cfm?c_id=202&objectid=10485349|date=January 5 ,2008 |work=New Zealand Herald |accessdate=2008-04-28]Roof lighting was fitted and traffic lights reintroduced in 2004 to reduce capacity constraints and safety issues. Although the tunnel is large enough for a bus and a smaller vehicle to pass, meetings involving two coaches or campervans are problematic. This is alleviated by the fact that the traffic is very tidal, towards Milford Sound in the morning and toward
Te Anau in the afternoon. The traffic lights operate only during the peak summer season, since theavalanche risk makes it unsafe to stop and queue at the portals in winter and spring. With increasing traffic on the road, it is expected that the risk to vehicles waiting at the portal will also increase.A widening of the tunnel, to allow for true two-laning, has been discussed. While this would make it unnecessary to force cars to wait in the avalanche areas, the high costs make this unlikely, especially for a road which (in national-level terms) carries little traffic, even if it is of very high importance for the tourism industry. Avalanche warning systems in the area are also considered to meet typical worldwide standards. In addition, Transit New Zealand (
as of 2005 ) had the realignment of the Homer east portal avalanche shed as one of the 'large activity priorities' on its planning list. The project would cost around NZ$ 14-15 million, and is unlikely to start before the end of the decade.ee also
*