- 104th Division (United States)
Infobox Military Unit
unit_name= 104th Infantry Division
caption=104th Division shoulder sleeve insignia
dates=1942 -1945 ,1946 -
country= United States
allegiance=
branch= Army Reserve
type=
role=
size= Division
command_structure=
garrison=
garrison_label=
equipment=
equipment_label=
nickname=Timberwolf Division
patron=
motto=Nothing in Hell can stop the Timberwolves
colors=
colors_label=
march=
mascot=
battles=World War II
*Battle of Hurtgen Forest
*Battle of the Bulge
anniversaries=
decorations=
battle_honours=
current_commander=Colonel Daniel York
current_commander_label=
ceremonial_chief=
ceremonial_chief_label=
colonel_of_the_regiment=
colonel_of_the_regiment_label=
notable_commanders=Terry de la Mesa Allen, Sr.
identification_symbol=
identification_symbol_label=
identification_symbol_2=
identification_symbol_2_label=US Infantry
previous=103rd Infantry Division
next=106th Infantry DivisionThe 104th Infantry Division —nicknamed the Timberwolf Division— is a division of theUnited States Army that fought for 195 consecutive days duringWorld War II . Some 34,000 men served with the division under the leadership of General Terry Allen, who was much admired despite his nickname, "Terrible Terry". The division's first action came in October of 1944 during the taking ofAchtmaal and Zundert in Holland. It then participated in the Battle of the Bulge, advanced through the Siegfried line and across theInde River into Cologne, and it helped complete the encirclement of theRuhr pocket . Finally, it made a 350-mile sweep to the Mulde River in the heart of Germany. The division was particularly renowned for its night fighting prowess.Insignia
The division's nickname came from its timberwolf shoulder insignia.The division insignia is a gray Timberwolf's head on a balsam green disc. It was designed by [http://www.askart.com/askart/b/charles_livingston_bull/charles_livingston_bull.aspx Charles Livingston Bull] , artist and authority on wild life, and represents the northwest. It was in this section of the country that the 104th conducted its training in 1942-43 when it was activated (see [http://www.army.mil/cmh-pg/documents/eto-ob/104ID-ETO.htm U. S. Army Center for Military History - 104th Infantry Division] ).
Assignment and Attachment to Higher Units
From Arno Lasoe's U. S. XIX Corps website:cite web
url=http://members.home.nl/alasoe/104th_infantry_division.htm
title=The U. S. XIX Corps Website
publisher=ARNO LASOE
year=2006
accessdate=2007-02-03]* 28 August 1944, Ninth Army, 12th Army Group
* 5 September 1944, III Corps
* 15 October 1944, Ninth Army, but attached for operations to the British I Corps,Canadian 1st Army , British 21st Army Group
** in clearing the Schelde estuary to open Antwerp ports, during the Battle of the Scheldt
* 5 November 1944, First Army, 12th Army Group
* 8 November 1944, VII Corps, First Army
* 20 December 1944, VII Corps, First Army (attached to the British 21st Army Group), 12th Army Group
* 21 December 1944, XIX Corps, Ninth Army (attached to the British 21st Army Group), 12th Army Group
* 3 February 1945, VII Corps, First Army, 12th Army GroupHistory
The 104th Infantry Division landed in France on
September 7 ,1944 cite web
url=http://www.army.mil/cmh-pg/lineage/cc/104id.htm
title=Combat Chronicle- 104th Infantry Division
publisher=http://www.army.mil/
date=unknown
accessdate=2007-01-26] . It is likely that the division was initially involved with implementing theRed Ball Express .With Canadian First Army, in the Battle of the Scheldt
The 104th's first combat experience occurred during the latter portions of the Battle of the Scheldt. While attached to the
Canadian 1st Army , the divisionmoved into defensive positions in the vicinity ofWuustwezel ,Belgium , onOctober 23 ,1944 , and went over to the offensive on the 25th, taking Zundert andAchtmaal , gaining control of the Breda-Roosendaal Road (see [http://www.104infdiv.org/MAP_A.HTM map] ), and overrunning Vaart Canal defenses. Leur and Etten fell as the division advanced to the Mark River onOctober 31 . A coordinated attack over the Mark River at Standaarbuiten (part ofMoerdijk municipality), onNovember 2 ,1944 , established abridgehead .Zevenbergen was captured and the Maas River reached onNovember 5 .With VII Corps, in the Battle of Hurtgen Forest
After release by the First Canadian Army, on
November 6 the 104th began moving by motor convoy towardsAachen , Germany (see [http://www.104infdiv.org/MAP_B.HTM map] ). The 414th Regimental Combat Team remained behind temporarily to secureMoerdijk . OnNovember 8 , the division started its relief of the U.S. 1st Infantry Division in the vicinity of Aachen, and it became attached by the VII Corps, First Army.The 104th participated in the northern edge of what is now called the Battle of Hurtgen Forest. The abstract of a [http://www.dtic.mil/ Defense Technical Information Center] report, "Huertgen Forest: Offensive, Deliberate Attack, Forest, 16 November 1944", describes what happened as follows:cite web
url=http://stinet.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA151627
title=Huertgen Forest: Offensive, Deliberate Attack, Forest, 16 November 1944
publisher=http://www.dtic.mil/
year=1984
accessdate=2007-02-03] "The VII (US) Corps, 1st Army attacked 16 November 1944 with 1st Inf Div, 4th Inf Div, 104th Inf Div, and CCR 5th AD to clear Huertgen Forest and the path of 1st Army to the Roer River. After heavy fighting, primarily by the 4th Infantry Division, VII Corps' attack ground to a halt. V Corps was committed on 21 November 1944. Attacking with 8th Inf Div, and CCR 5th AD, the V Corps managed to capture Huertgen after stiff fighting on 28 November 1944."While the 4th Infantry Division was being stalled by dug-in defenders deep within the
Hurtgen Forest , the 104th Infantry Division attacked and secured Stolberg onNovember 16 . Pushing on against heavy resistance, the 104th division was able to takeEschweiler on theNovember 21 . The division next cleared the area west of the Inde River, includingInden , in vicious fighting.With VII Corps,
Despite strong enemy counterattacks in the vicinity of Lamersdorf, Inden and Lucherberg (see [http://www.104infdiv.org/MAP_D.HTM map] ) in early December, by
December 23 the 104th and its attached units had completed a hard-fought, town-by-town drive beyond the Siegfried Line to the
Roer River. FromDecember 15 ,1944 toFebruary 22 ,1945 (Note: Unit was not in the Battle of the Bulge),the 104th was involved with defending its sector nearDüren and Merken (see [http://www.104infdiv.org/MAP_C.HTM map] ).Drive to Cologne
As the German offensive in the Ardennes wound down, the divisionmoved across the Roer and took Huchem-Stammeln, Birkesdorf, and North
Duren . OnMarch 5 , it enteredCologne after heavy fighting (see [http://www.104infdiv.org/MAP_E.HTM map] ). This [http://www.104infdiv.org/750TANK.HTM#The%20Drive%20for%20Cologne archive] from the 750th Tank Battalion elaborates on actions involved in the approach to Cologne.Encirclement of the Ruhr pocket
After defending the west bank of the
Rhine , the division crossed the river atHonnef onMarch 22 ,1945 , and attacked to the east of theRemagen bridgehead. General Collins’ VII Corps (First Army) was given the assignment of encircling the important Ruhr industrial area of Germany from the south. Beginning early onMarch 25 , the 3rd Armored Division, with the 104th's 414th Infantry Regiment attached, began a lightning-like thrust eastward. After 9 days, the 3rd Armored and 414th Infantry had completed a 193-mile dash to Paderborn, and at Lippstadt, they linked up with the U.S. Ninth Army to complete the encirclement of theRuhr pocket (see [http://www.104infdiv.org/MAP_F.HTM map] ), thus trapping 335,000 German troops. During this offensive, the 3rd Armored advanced in four columns on more or less parallel roads. The remainder of the 104th Infantry Division, mounted on trucks and accompanied by the 750th Tank Battalion and other supporting troops, had the job of mopping up enemy forces bypassed by the 3rd Armored. In many cases, these bypassed forces had recovered from the initial shock by the time the follow-up forces reached them and put up a strong defense. The 104th repulsed heavy attacks nearMedebach , and capturedPaderborn onApril 1 ,1945 . After regrouping, the 104th advanced east and crossed theWeser River on the 8th, blocking enemy exits from theHarz Mountains .The rapid advance of the 3rd Armored Division created an ever-lengthening flank for the 104th to defend. The line was threatened both from German troops on the west attempting to break out of the entrapment and from enemy forces on the east. There were many engagements all along the line. Supply vehicles carrying much-needed fuel and other materials were frequently ambushed. General Collins placed additional divisions in the ever-lengthening line to contain the Germans. Ultimately there were five infantry divisions, plus a cavalry group, stretched over a 175-mile arc from Remagen to Paderborn. As the increasing seriousness of the German situation became apparent, larger and larger groups attempted (without success) to break through the American lines. It was a very fluid situation, and it was uncertain as to when or where the enemy might be encountered (see [http://www.104infdiv.org/750TANK.HTM#Encirclement%20of%20the%20Ruhr%20Pocket the 750th records] ).
Liberation of Nordhausen camps, and the battle for Halle
After liberating the Mittelbau Dora concentration camp near Nordhausen on April 11 (see [http://www.johngalione.com/timberwolf415b011.htm The Journey of Private Galione, Supporting Documents] ), the 104th crossed the
Saale River with two battalion task forces of the 414th Infantry and took Halle in a bitter 5-day struggle which lasted fromApril 15 to 19 (see [http://www.104infdiv.org/MAP_G.HTM map] ). The sector to theMulde River was cleared by the 21st, with the 414th capturingRaguhn , the 413thDelitzsch , and the 415thBitterfeld . The 104th Division halted operations along the Mulde, its patrols contacting theRed Army atPretzsch onApril 26 .On
27 June 1945 , the Timberwolves left Europe for home and were stationed atCamp San Luis Obispo ,California , anticipating deployment for further combat in the Pacific facing the Empire of Japan. However, on30 August 1945 , official word was received from higher headquarters that the Division would not be needed in the Pacific Theater.Units
*
413th Infantry Regiment - (3 battalions)
*414th Infantry Regiment - (3 battalions)
*415th Infantry Regiment - (3 battalions)
*385th Field Artillery Battalion (105mm Howitzer)
*386th Field Artillery Battalion (105mm Howitzer)
*387th Field Artillery Battalion (155mm Howitzer)
*929th Field Artillery Battalion (105mm Howitzer)
*329th Medical Battalion
*329th Engineer Combat Battalion
*104th Reconnaissance Troop (Mechanized)
* 804th Ordnance Light Maintenance Company
* 104th Quartermaster Company
* 104th Signal Company
* Military Police Platoon
* Headquarters Company
* BandReferences:1. The Army Almanac: A Book of Facts Concerning the Army of the United States, U.S. Government Printing Office, 1950.2. Order of Battle of the United States Army, World War II, European Theater of Operations, Office of the Theater Historian, Paris, France, December 1945.Attached Units
*
692nd Tank Destroyer Battalion - attachedOctober 29 1944 –March 7 1945
* [http://www.104infdiv.org/555%20AAA%20BN.html 555th AAA Battalion] - attachedOctober 26 1944 –May 24 1945
* [http://www.104infdiv.org/750TANK.HTM 750th Tank Battalion] - attachedNovember 16 –December 23 1944
* 87th Chemical Battalion - attachedDecember 10 –December 22 1944 Casualties
Wikimedia Foundation. 2010.