- Symington, Biggar and Broughton Railway
The Symington, Biggar and Broughton Railway Company was a
railway in southernScotland . It was later absorbed by theCaledonian Railway , and is now closed. It competed for a period with theNorth British Railway 's "Peebles-shire Express".Route
The line left the
Caledonian Railway Main Line (now theWest Coast Main Line ) at Symington, and passed through Biggar and Broughton; it was later extended to reachPeebles West. Intermediate stations were built at Stobo and Lyne.There was an engine shed at Broughton, which was demolished when the line was extended to Peebles, and the Neidpath Viaduct built between Lyne and Peebles still stands and is used as a footbridge over the
River Tweed . The nearby Neidpath Tunnel was used as a refuge duringWorld War II .History
Royal assent for the line was granted on 21 May 1858, and the railway was opened from Symington to Broughton on 5 November 1860.Awdry, Page 106] A extension to Peebles was authorised on 3 July 1860. In August 1861 the company was absorbed by the much larger Caledonian Railway. The extended line was opened into the new station at Peebles on 1 February 1864; necessitating the viaduct and tunnel at Neidpath.
The "Tinto Express" operated services on the line to
Edinburgh in competition with the "Peebles-shire Express"; as the journey was longer, the service was sold with an emphasis on comfort rather than speed. Services toGlasgow were faster than those of their competitors.The
Talla Railway was a reservoir construction line which briefly operated from Rachan Junction (near Broughton). The line was doubled from Broughton to there in 1895 in connection with this.The North British Railway built a line connecting the new station to their existing station in Peebles (formerly the
Peebles Railway ). This connecting line was called the "Caledonian Branch".Along with the rest of the Caledonian network, it was absorbed into the
London, Midland and Scottish Railway under Grouping in 1923, and then intoBritish Rail in 1948.The line from Peebles to Symington was closed to passengers on 6 June 1950, from Peebles West to Broughton closed on 7 June 1954, and the final closure (from Symington to Broughton) was on 4 April 1966. The section of the old line between Broughton and Biggar (starting beyond the coal yard in Broughton) is used as a footpath.
Current operations
As of 2008, a feasibility study is to be undertaken to examine the possibility of reopening Symington station or building a new station in the vicinity, in order to provide the town of Biggar with a rapid public transport service to Glasgow. [http://www.spt.co.uk/news/story455.html SPT news ] ]
Notes
References
*
External links
* [http://www.railscot.co.uk/Symington_Biggar_and_Broughton_Railway/frame.htm RAILSCOT on Symington, Biggar and Broughton Railway]
* [http://www.railscot.co.uk/Talla_Railway/frame.htm RAILSCOT on Talla Railway]
* [http://130.209.236.149/ewan/chronology/companydates.asp?line=Symington_Biggar_and_Broughton_Railway Chronology]
* [http://www.avoe05.dsl.pipex.com/scotrlys.htm Listing of pre-grouping railways]
Wikimedia Foundation. 2010.