- Bylong Valley Way
Infobox Australian Road
road_name = Bylong Valley Way
route_
route_
route_
photo = BylongValleyWaySign.jpg
caption =
length = 140
direction = North-South
start = "'
finish = "'
est =
through = Baerami, Kerrabee, Bylong, Breakfast Creek, Rylstone, Kandos
route =
exits =Bylong Valley Way is a
New South Wales country road linking theGolden Highway near Sandy Hollow to theCastlereagh Highway near Ilford. It is named after theBylong Valley , through which the road passes.Sealing
The Bylong Valley Way is not fully sealed in the Mid-Western Regional Council area, and sealing of the remaining parts has been a political issue for decades. At the beginning of 2007, there were four sections of unsealed road totalling 32 kilometres. Two sections were between
Cox's Gap and Bylong with only 850 metres of sealed road between them. The other two were south of Bylong on the way towards Rylstone, where two kilometres had been sealed a few years earlier, converting one long unsealed section to two shorter ones.On 13 December 2006, The federal government announced
AU$ 2 million ofAuslink funding towards the completion of sealing of the Bylong Valley Way. [ [http://www.auslink.gov.au/publications/administration/pdf/All_selected_projects.pdf Auslink Strategic Regional Program - Projects selected for funding] ] The overall cost will be $4.1 million. The Mid-Western Regional Council will contribute $1.2 million and the New South WalesRoads and Traffic Authority will contribute the remaining $900,000. [ [http://nsw.nationals.org.au/html/bylong-valley-way-benefits-from-auslink-s-strategic-regional-programme.cfm NSW Nationals announcement of funding for Bylong Valley Way] ]The sealing work is being carried out by Mid-Western Regional Council [ [http://www.midwestern.nsw.gov.au/index.php?option=com_content&task=view&id=235&Itemid=177 Mid-Western Regional Council weekly road works information] ] and will be completed in three stages: [ [http://www.auslink.gov.au/projects/ProjectDetails.aspx?Project_id=00011-06NSW-SR Auslink details of project for sealing of Bylong Valley Way] ]
tage One
*March 2007 to June 2007
*Sealing of two sections totalling six kilometres south of Bylong
*Widening a total of nine kilometres of remaining unsealed road in preparation for sealing in the later stagestage Two
*July 2007 to June 2008
*Sealing of two remaining unsealed sections south of Bylong totalling 12.42 kilometres
*Sealing of one section one kilometre long adjacent to existing sealed section east of Bylong
*Preparatory works for stage three [ [http://www.midwestern.nsw.gov.au/files/Executive/Quarterly_Review_June_2008_200808.pdf Mid-Western Regional Council - Quarterly Review, June 2008] ]tage Three
*July 2008 to March 2009
*Completion of sealing, consisting of two sections east of Bylong totalling 12.6 kilometresBridges
Muswellbrook Shire Council
The dilapidated timber sections of the "Kirks Bridge", crossing Baerami Creek at Baerami were demolished and were planned to be replaced with new concrete sections by 31 August 2007. [ [http://www.muswellbrook.nsw.gov.au/tenders/2007%20Tenders/1-2007/Tender_links.htm Muswellbrook Shire Council tender documents for bridge construction] ] Unfortunately, flooding during the
2007 Hunter region and Central Coast storms delayed the work by around a month. The bridge had previously been partially rebuilt, with both buttresses and two spans at one end having been reconstructed in concrete. [ [http://www.muswellbrook.nsw.gov.au/Dev/council/2004-2005%20CAPEXP.pdf Muswellbrook Shire Council 2004-2005 capital expenditure report] ]Muswellbrook Shire Council maintained a temporary deviation on private property for several years to allow access during bridgework and for heavy vehicles. After the bridge was reopened, that deviation was removed and the land returned to its owner.The single-lane timber bridge over Widden Creek is also to be replaced. Muswellbrook Shire Council had committed to spend $480,000 by 30 June 2007 to "Manage the investigation, design and construction works" [ [http://www.muswellbrook.nsw.gov.au/Dev/council/Management%20Plans/2006-2007/Management%20Plan.pdf Muswellbrook Shire Council 2006-2007 management plan] ] but the discovery of a serious problem on Kirks Bridge saw that money diverted to the more urgent project. Muswellbrook Shire Council now plan to replace the Widden Creek bridge by 30 June 2009 at a cost of AU$1.4 Million. [ [http://www.muswellbrook.nsw.gov.au/Snapshot/business.html#InfrastrDev Muswellbrook Shire Council - Snapshot of New Developments] ]
Once the Widden Creek bridge is replaced, the 38 tonne load limit will be lifted, allowing heavy vehicles to again use this route.
Mid-Western Regional Council
Mid-Western Regional council plan to replace the single lane "Carwell Bridge" between Kandos and Ilford between mid 2009 and mid 2010. [ [http://www.midwestern.nsw.gov.au/files/Executive/Final_Management_Plan_-_with_pictures-150607.pdf Mid-Western Regional Council 2007-2008 management plan] ]
Railway
The Sandy Hollow- Gulgong railway line and part of the Merriwa railway line, which form the
Australian Rail Track Corporation 's Ulan line between Muswellbrook and Gulgong, follow the same valleys as the Bylong Valley Way from near the Golden Highway to near Bylong, where the railway line continues west as the road turns south.The railway line crosses the road three times, twice at level crossings and once on a bridge over the road. Both of the level crossings have flashing warning lights but not boom gates. One level crossing is close to the Golden Highway while the other is close to Bylong. The railway bridge is on the western side of Cox's Gap, between the level crossings.
Connections
In conjunction with the
Bathurst-Ilford Road to Bathurst, this very quiet and scenic route provides a leisurely alternative to going throughSydney to travel between theHunter Valley and Bathurst.The part of the Bylong Valley Way east of Bylong is designated MR 208. At a T-intersection near the railway level crossing just north of the village of Bylong, MR 208 turns off towards Ulan, following the Ulan railway line to the west while the Bylong Valley Way becomes MR 215 as it turns south to pass through Bylong, Rylstone and Kandos.
National Park access
Access to the
Wollemi National Park andGoulburn River National Park is available at various points along the road between the Golden Highway and Bylong. Over Cox's Gap, the Bylong Valley Way is flanked by the two national parks. Camping areas are available in the Wollemi National Park on the western side of Cox's Gap, and the Phipps Cutting picnic area between Baerami and Widden Creek provides an entry point for hiking in the Wollemi National Park.ee also
*
Highways in Australia
*List of highways in New South Wales Gallery
References