- Greenstream pipeline
Greenstream pipeline, a part of the
Western Libya Gas Project , is a 520 kilometers long natural gas submarine pipeline fromMellitah inLibya toGela , inSicily ,Italy . It includes also the Mellitah Compressor Station and the Gela Reception Terminal.The idea of natural gas from Libya to Italy originating from the 1970s. Feasibility studies were carried out in the 1980s and 1990s. The pipeline has constructed by Italian energy companies
Eni in partnership with National Oil Corporation (NOC). Construction of the pipeline started in2003 and the pipeline was inaugurated on7 October 2004 . The diameter of Greenstream pipeline is 32 inches and it will reach to annual capacity of 8 bcm of natural gas at the end of 2006. The total costs of pipeline are 6.6 billion USD.The Greenstream pipeline is supplied from the
Bahr Essalam offshore field,Bouri Field andWafa field nearAlgeria n border, 530 kilometers from Mellitah.ee also
*
Trans-Mediterranean Pipeline
*GALSI External links
* [http://www.eni.it/eniit/eni/internal.do?layout=attivita_e_strategie&mnselected=greenstream&channelId=-1073756946&menu=false&mncommand=openById&mnparam=greenstream&lang=en&sessionId=13632435 Greenstream] , by ENI
* [http://www.oilvoice.com/m/viewEd.asp?ed_ID=16 Western Libyan Gas Project] , by OilVoice10 October 2004
* [http://www.gasandoil.com/GOC/news/nte44584.htm New gas pipeline linking Libya to Italy opened] , by Alexander Gas & Oil Connections8 October 2004
Wikimedia Foundation. 2010.