- Campos Novos Dam
Infobox_Dam
dam_name= Campos Novos Dam
caption= Campos Novos Dam from the lower side
official_name= Barragem de Campos Novos
crosses=Canoas River
reservoir=
locale=Campos Novos ,Brazil
maint= Enercan [ [http://www.enercan.com.br Enercan] ]
length= 2000 ft (600 m)
height= 662.7 ft (202 m)
width=
began= August,2001
open= July,2006
closed=
bridge_carries=
bridge_width=
bridge_clearance=
bridge_traffic=
bridge_toll=
bridge_id=
map_cue=
map_
map_text=
map_width=
coordinates= coord|27|36|15|S|51|19|35|W|display=inline,title
lat=
long=
extra=The Campos Novos Dam is in Santa Catarina province in southern
Brazil (Latitude S27o36', Longitude W51o19'). In2006 , at 200m dam height, it was regarded as the third highest dam of this type (concrete-faced rockfill dam or CFRD) in the world, but, inJune 2006 , the water which it held back ran out following a break in the dam wall.Built at the cost of $671 million
USD , it is located on theCanoas River , Brazil. It is part of a hydro-electric complex intended to provide 880 MW. A second dam is below this one, and together they can hold a little more than 2 cubic kilometers of water.Campos Novos' 35 years build and operate concession was awarded in 1998. It is owned by Enercan, a consortium made up of Brazilian power company CPFL Energia with 48.7%, Brazilian aluminium maker CBA with 22.7%, metallurgy company CNT with 20%, state-controlled companies Rio Grande do Sul with 6.5% and Santa Catarina Celesc with 2%.
The dam builder was a consortium led by Brazilian construction company Camargo Correa and engineering consultants Engevix. Funding is by Inter-American Development Bank and Brazilian state-owned National Bank for Economic and Social Development.
A major break caused the water to begin to run out, after a tunnel collapsed on
20 June 2006. The exact reasons for the cracking were unknown in July 2006, however it has been revealed that patches were begun on another tunnel in October 2005 before the recent tunnel failure. [en " [http://www.newscientisttech.com/article.ns?id=mg19125593.300&feedId=online-news_rss20 Enormous new dam fails in Brazil] ", "New Scientist ", 2006-07-08] [" [http://www.ens-newswire.com/ens/jun2006/2006-06-29-01.asp Giant Cracks Appear in New Brazilian Dam] ", "Environment News Service", 2006-06-29] .Since the dam failure, a full inquiry for the reasons behind the cracks has been done, and a time-line of the dam's progression towards failure has been completed. [ [http://www.waterpowermagazine.com/story.asp?storyCode=2048919 Inquiry and Timeline] ] Following this discovery, hidden by the partners of the project, it appeared that these companies had maltreated the local populations. An investigation into the human rights violations was launched by
United Nations Organisation [" [http://www.ens-newswire.com/ens/jun2006/2006-06-29-01.asp Giant Cracks Appear in New Brazilian Dam] ", "Environment News Service", 2006-06-29] .Camargo Corrêa re-plugged the tunnels in November 2006 and the reservoir was refilled by 1 March 2007. The last of the three generators went on-line on 30 April 2007.
References
* [http://enr.construction.com/news/intl/archives/060705.asp Engineering News Record]
* [http://www.irn.org/programs/brazil_dams/ International Rivers]List of hydroelectric power stations List of world's tallest dams
Wikimedia Foundation. 2010.