Cobra (tram)

Cobra (tram)
Cobra tram in front of the ETH, Zurich
Cobra tram at Milchbuck, Zurich

The Cobra Tram is Zurich's newest tram type and first low floor tram. It is currently only running on a limited number of lines (3, 4, 6, 7, 9, 10, 11, 12, 13, 14) alongside the other tram models, although further rollout is planned for the coming years.

Contents

History

Initial concept

In 1992, a consortium of Swiss rolling stock manufacturers proposed a new design of low-floor articulated tram. The design was targeted for Zürich and Basel, but it was hoped other orders might also be won.

The design is based on short body segments, with four-wheel trucks under every second segment. The other segments are floating, i.e. without wheels but supported by adjacent segments. The wheel pairs of these trucks are not connected by axles but pivot individually and are steered into curves. This, it was hoped, would reduce wear and noise and also increase passenger comfort. Also, the lack of axles permits a low floor throughout the vehicle. The wheel boxes themselves are hidden under seats, as are the motors.

This running gear would have been designed and manufactured by SIG. The electrical equipment would have been supplied by ABB and the tram body by Schindler, who proposed to manufacture it from a synthetic material.

Prototype

In order to convince potential buyers and gain experience with the design, the manufacturing consortium set about creating a prototype. For this, Bern tram 401 was purchased. Its running gear was replaced and a new centre section was inserted. The prototype, which was numbered 3000, underwent extensive testing in both Zürich and Basel. It also visited Augsburg and Helsinki for promotional purposes. The unit was ultimately scrapped in Basel.

Delays and Modifications

Following various changes of policy in Zürich and Basel, no immediate orders were forthcoming. Meanwhile, the manufacturing consortium underwent numerous changes due to acquisitions and mergers within the industry. The sections of ABB and Schindler concerned with the Cobra design ultimately became part of Bombardier, with SIG ultimately becoming part of Alstom. Changes in management focus and some loss of expertise through downsizing activities also affected the design. Following concerns over the suitability of the polymer construction, this was replaced by an aluminium design.

Basel was lost as potential customer when this city opted for the Combino design by Siemens. The Cobra consortium, however, won an order to supply 6 prototypes to Zürich.

Prototypes in Zürich

These 6 prototypes (3001-3006) for the VBZ began test operations in Zurich in 2001. These are five-section versions of the design. However these were withdrawn from operation soon afterwards due to cracks appearing in the drive mechanisms. There were also concerns about the noise levels both within and outside the new trams, leading to addition of noise reduction measures. The Cobra had already earned itself the unfortunate nickname Rattlesnake in the popular Zürich press. Since 2002, six Cobra trams have been operating on lines 4 and 9 with occasional appearances on line 6.

Following the Combino crisis, the design of Cobra was also reassessed, and it was found necessary to modify the construction yet again. It was also decided to add air-conditioning.

Production units

VBZ finally confirmed an order for 68 production units (3007-3074). Delivery of these began in 2005 and was completed in 2009, replacing almost all of the rolling stock that was pre-Tram 2000. VBZ furthermore had an option to order up to 35 additional units. They finally decided to order another 14 units (3075-3088). These additional trams will be needed for new services such as Tram Zürich West and Phase 2 of Stadtbahn Glattal.

The six prototypes (3001-3006) have been rebuilt to the standards of the production units.

Design

The Cobra was styled by Pininfarina.

Controversy

The introduction of this new tram series has had a long and difficult history. The original orders were placed in 1996, with many questioning the choice of Schindler's Cobra over the already tested Combino series from Siemens, selected by both Basel and Bern. This decision was justified by the Verkehrsbetriebe Zurich on the grounds of carriage lengths and compatibility with the Zurich tram network. However, from March 5, 2010, the Red Demonstrator, a new bright red seven-segment Combino tram, Bern 659, showed itself off to the public of Zurich until April 12 on line 11 in regular service.

The first models of the Cobra prototype were delivered in May 2001 after organisational changes within Schindler, Adtranz and Bombardier caused delays and renegotiations. The subsequent problems with structural weakness and noise within the new trams, causing them to be quickly withdrawn from service, added criticism. The manufacturers endeavoured to terminate the orders, and even by 1999 Adtranz had vigorously pleaded with the VBZ to replace the vehicles and future orders by the Eurotram. The VBZ insisted on its unique Cobra design features and styling, so the Cobra survived.

Since 2002 the six prototype vehicles have proven themselves successful and the teething troubles have been overcome. The go-ahead has long since been given to expand the fleet to at least 88 trams by the end of 2010.

References


Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • Cobra-Tram — Be 5/6 «Cobra» Anzahl: 88 Triebwagen Hersteller: Bombardier Transportation, Alstom Baujahr(e): 2001, 2006–(2010) Länge über Kupplung …   Deutsch Wikipedia

  • Cobra (disambiguation) — A cobra is any of several species of snake. Cobra may also refer to: Contents 1 Fictional entities 2 Government and police 3 L …   Wikipedia

  • Tram 2000 Zurich — Tram 2000 is a type of tram rolling stock that was first designed for the Swiss city of Zurich. Variants of the type have also been built for other cities. History In 1976, VBZ took delivery of their first batch of Tram 2000 vehicles. These metre …   Wikipedia

  • Tram Zürich West — (TZW) ist der offizielle Projekttitel für eine Tramneubaustrecke der Verkehrsbetriebe Zürich (VBZ) im Zürcher Quartier Escher Wyss, das zum Entwicklungsschwerpunkt Zürich West gehört. Eng an das Projekt gekoppelt ist die Umgestaltung der… …   Deutsch Wikipedia

  • VBZ Be 5/6 "Cobra" — Be 5/6 «Cobra» Anzahl: 88 Triebwagen Hersteller: Bombardier Transportation, Alstom Baujahr(e): 2001, 2006–(2010) Länge über Kupplung …   Deutsch Wikipedia

  • VBZ Be 4/6 Tram 2000 — Be 4/6 «Tram 2000» Be 4/8 «Sänfte» Be 2/4 «Pony» Nummerierung: 2001–2121, 2301–2315 2401–2435 («Pony») Anzahl: 98 Gelenktriebwagen (Be 4/6) 15 Gelenktriebwagen ohne Führersta …   Deutsch Wikipedia

  • Low-floor tram — A low floor tram is a tram that has no steps between one or more entrances and part or all of the passenger cabin. Being low floor improves the accessibility of the tram for the public. A low floor in a tram can be achieved by using a high floor… …   Wikipedia

  • Städtische Strassenbahn Zürich — Verkehrsbetriebe Zürich Basisinformationen Webpräsenz VBZ Eigentümer …   Deutsch Wikipedia

  • VBZ — Verkehrsbetriebe Zürich Basisinformationen Webpräsenz VBZ Eigentümer …   Deutsch Wikipedia

  • Verkehrbetriebe der Stadt Zürich — Verkehrsbetriebe Zürich Basisinformationen Webpräsenz VBZ Eigentümer …   Deutsch Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”