- Burdekin Bridge
The Burdekin Bridge (known as the Silver Link) spans the
Burdekin River between the towns ofAyr, Queensland andHome Hill, Queensland . The Bridge was completed in 1957. Construction began 10 years earlier in 1948. 1097 metres (3,600 ft) in length, it is one of the longest multi-span bridges in Australia and longer thanSydney 's Harbour Bridge,Brisbane 'sStory Bridge or Newcastle'sBrooklyn Bridge .Originally, it was thought that the bridge could not be built in its present location. No trace of rock could be found on which to build the bridge foundations. In 1946, two high ranking Government engineers visited India to inspect a number of bridges built on sand foundations. The same technique was used for the Burdekin Bridge and it is the only bridge in
Australia not built with a firm foothold.The bridge rests on 11 huge, hollow, concrete caissons sunk into the river bed. The caissons are 17 metres across the top (measured parallel to the stream) and vary in width from 5.5 to 7.6 metres. The caissons were sunk into the river bed to a depth of about 30 metres. Add to that the approximately 20 metres that the caissons rise above the bed and the end result is some very massive pieces of concrete. Each weighs about 4,000 tons. The caissons were fitted with steel "cutting edges" to help them sink. The steel used in the cutting edges weighed 238 tons.
Construction of the first caisson started in 1947 after the "wet season". As each caisson rose in height, sand was removed from the centre of the casisson to make it sink into the sand bed. To get such a tremendous mass to sink gradually and evenly was difficult. To add to the difficulties, often a caisson became stuck and a diver had to be sent down to find the problem and remedy it. Another difficulty was that each caisson had to be sunk to a secure depth before the "wet season". If a caisson was not firmly anchored deep enough, a flood could have swept it away.
Because the bridge does not have rock foundations but is entirely supported by sand, it is sometimes described as a
floating bridge . It is not a true floating bridge as it does NOT float on water.The metal bridge spans were bolted together with high tensile bolts instead of being riveted. At the time, no other Australian bridge had ever been constructed this way.
With all the difficulties, plus the shortage of steel after the Second World War, the construction took almost a decade to complete at a cost of $6 million. Despite these set-backs, the new bridge greatly assisted in travel between
Ayr, Queensland andHome Hill, Queensland and formed a vital link between North and South Queensland.The Silver Link replaced a bridge which is set just off the river bed. It was regularly covered and washed away by flood waters but it is still possible to see the remains of the old bridge when the river level is low.
Due to the special construction of the bridge, with steel beams forming a
truss over the highway it is regularly being closed to let pass oversizeroad train s which take both lanes on the narrow bridge.