- Blackwall Tunnel
Infobox tunnel
name = Blackwall Tunnel
caption = Entering the western of the two bores
line =
location = Blackwall /Greenwich
coordinates = coord|51.504443|-0.003119|display=inline,title
system =
status =
start =
end =
stations =
open =
close =
owner =Transport for London
operator =
character =
linelength =
tracklength =
notrack =
gauge =
el = yes
speed =
hielevation =
lowelevation=
height =
grade =|The Blackwall Tunnel is a pair of roadtunnel s underneath theRiver Thames in eastLondon , linking theLondon Borough of Tower Hamlets with theLondon Borough of Greenwich , and part of theA102 road . The northern portal lies just south of the East India Dock Road (A13) in Blackwall; the southern entrances are just south of the The O2 (formerly theMillennium Dome ) on theGreenwich Peninsula . Before the opening of the Dartford Tunnel in 1963, the Blackwall Tunnel was the easternmost Thames crossing for vehicles, excluding ferries.The northern approach takes traffic from the A12 and the southern approach takes traffic from the A2, making the tunnel crossing a key link for both local and longer-distance traffic between the north and south sides of the river. It forms part of a key route into central London from
South East London andKent . For some years, the section north of the A2 Rochester Way Relief Road was classified as the A102(M)motorway , but this reverted to the A102 in September 1999 when the part of A102 north of the river was merged with the newly opened extension of the A12 throughWanstead ,Leytonstone andLeyton . This coincided with the GLA taking over responsibility for its own trunk roads asTransport for London had no authority to operate motorways.History
The older western tunnel was designed by Sir
Alexander Binnie and built by S. Pearson & Sons, between 1892 and 1897. It was originally commissioned by theMetropolitan Board of Works but responsibility passed to theLondon County Council when the former body was abolished in 1889. The cost of the project was £1.4 million, and seven lives were lost during construction. The tunnel was officially opened by the Prince of Wales on22 May 1897 .It was then the longest underwater tunnel in the world at 4,410 feet (1,344 m) long. It was constructed using
tunnelling shield andcompressed air techniques; the shield pioneerJames Henry Greathead was a consultant. SirJoseph Bazalgette , the architect of the London sewerage system, was also involved in the original planning of the project. To clear the site in Greenwich, more than 600 houses had to be demolished, including one reputedly once owned by SirWalter Raleigh .Today the western bore is only used for north-bound traffic (and is not accessible to vehicles taller than 4 m). The southern portal features a striking gateway built of red brick. The tunnel itself has several sharp bends. Some suggest these were built so that horses would not bolt once they saw daylight (motor vehicles were rare in 1897), though the bends may also have been created so that the tunnel avoided the foundations of other structures; another theory suggests the bends avoided tunnelling through a
Black Death burial ground. The tunnel carries two lanes of traffic, though higher vehicles need to keep to the left-hand lane so that they do not hit the tunnel's inner lining.The newer, eastern, tunnel, opened on
2 August 1967 , is much wider, usable by vehicles up to 4.72 m and has no sharp corners — very much designed for 20th century road traffic. Its distinctive ventilation towers (right) were designed in 1961-2 by Terry Farrell when he was working as an architect for theLondon County Council . The northern pair stand at Blackwall, while the southern are now contained within theMillennium Dome . The towers were Grade II listed in 2000.Traffic management
The north bound Blackwall Tunnel is a traffic bottleneck with tailbackscite news |url=http://news.bbc.co.uk/1/hi/england/london/6570775.stm |title=Tidal flow system ends in tunnel |publisher=BBC News |date=2007-04-19 |accessdate=2007-11-24] in the morning
rush hour as traffic heads north from South East London and Kent towards theLondon Docklands ,City of London , east andCentral London .Specify|date=November 2007 To relieve the congestion, thetidal flow system was introduced in 1978 allowing northbound traffic to use the eastern tunnel. [cite news |url=http://www.eastlondonadvertiser.co.uk/content/towerhamlets/advertiser/blackwalltunnel/story.aspx?brand=ELAOnline&category=TunnelNews&tBrand=ELAOnline&tCategory=BlackwallTunnel&itemid=WeED04%20May%202007%2013%3A35%3A31%3A413 |title=Tunnel Contra-flow to end after 29 years |date=2007-05-04 |first=Mike |last=Brooke |work=East London Advertiser |publisher=Archant Regional Limited |accessdate=2007-11-24] Due to its sharp turns with restricted headroom, high-sided vehicles may only use the left-hand lane of the western tunnel meaning it is not suitable to operate a similar two-way flow in the evening. On20 April 2007 the tidal flow was discontinued due to reports by Transport for London and theMetropolitan Police of an increase in dangerous motoring behaviour, they cited poor driving, such as overtaking, for the decrease in safety during counterflow operations. [cite web |url=http://www.tfl.gov.uk/corporate/media/newscentre/4919.aspx TfL news |title=Transport at a glance |publisher=Transport for London |date=2007-04-19 |accessdate=2007-11-24]This decision to end the counterflow system was made despite a 2006 independent report, commissioned by TfL, which concluded that "the proportion of accidents occurring in and around tidal flow operations is not significantly higher than would normally be expected on this type of road" and which recommended that "accident mitigation should be focused in the first instance on speed management aspects, and specifically on the deficiencies, limitations, and in some cases, inconsistencies in the signing, signalling and road marking regime". [Blackwall Tunnel Tidal Flow Options Study: Traffic & Safety review, Mott MacDonald, April 2006 at cite web |url=http://www.littlemanwhatnow.com/2007/08/exclusive-blackwall-tunnel-expos.html | accessdate=2007-11-24 | date=2007-08-23 | title=Blackwall Tunnel Exposé | publisher=Little Man, What Now? ] Transport for London made the ending of the
tidal flow with immediat effect without advance notice. The ending of the counterflow system has brought protests from users of the tunnel and those experiencing increased congestion due to the change. [cite news |url=http://news.bbc.co.uk/1/hi/england/london/6637817.stm |title=Calls for tunnel lane to reopen |date=2007-05-09 |publisher=BBC News |accessdate=2007-11-24] Some of those protesting believe the motive for the change was not safety, but the furthering of other goals such as hidden agenda tunnel charges, hidden agenda congestion charging and the proposedThames Gateway Bridge .Fact|date=January 2008
MayorKen Livingstone has stated that he has "absolutely no plans to set up a congestion charging zone to charge vehicles that use the Blackwall Tunnel or the Blackwall Tunnel Approach Road. But if Greenwich wishes to do so on any of its roads then I will support them".cite web | publisher = London Mayor | title = Letters | work = The Londoner | last = Livingstone | first = Ken | url = http://www.london.gov.uk/londoner/08jan/letters.jsp | date = 2008-01-08 ]Unofficial commercial street maps of London periodically show a third Blackwall Tunnel as proposed for construction, though this does not appear in the equally unofficial latest edition of the London
Geographer's A–Z Street Atlas . Although congestion relief plans are regularly discussed, there are at present (2007) no specific plans for a third crossing at the site, although a 'reserved route' in an E-W direction does exist on the Greenwich Peninsula 'Master Plan'.Fact|date=November 2007
A-ZMaintenance and refurbishment
It is currently proposed to carry out major refurbishment of the Northbound tunnel as the levels of reactive maintenance are now compromising the proper working of the tunnel. An experts group has been convened and is developing a set of options for public consultation.Fact|date=December 2007
Work is likely to begin in early 2008 and will take up to 24 months, depending upon which pattern of closures is deemed best by stakeholders, experts and the public.Fact|date=December 2007
Nearest alternative crossings
The nearest alternative road crossings are the
Rotherhithe Tunnel three miles (5 km) to the west, theWoolwich Ferry two miles (3 km) to the east and the distantDartford Crossing a total of 12 miles (20 km) farther to the east.For public transport there is
Jubilee Line tube service fromNorth Greenwich tube station (TfL) toCanning Town station on the east andCanary Wharf tube station on the west, and theDocklands Light Railway also passes underneath the Thames between Island Gardens at the southernmost point of theIsle of Dogs , and Cutty Sark in the centre ofGreenwich .References
External links
* [http://www.uk-roads.org.uk/ UK Roads Portal] (Links to information about the UK road network)
* [http://www.terryfarrell.co.uk/projects/moving/mov_blackTunnel.html The ventilation towers] (from the Terry Farrell practice's site)
* [http://www.cbrd.co.uk/media/video/blackwall.shtml Video of the Tunnel] (Chris' British Road Directory)
* [http://www.blackwalltunnel.co.uk Petition to keep re-open the tidal flow system]
Wikimedia Foundation. 2010.