- Interstate 155 (Illinois)
Infobox road
state=IL
type=I
route=155
maint=Illinois DOT
length_mi=32.13
length_round=2
length_ref=cite web |author=Illinois Technology Transfer Center |url=http://www.dot.state.il.us/gist2/select.html |title=T2 GIS Data |accessdate=2007-11-08 |date=2006]
established=December 15 ,1989 – I-55 to Hartsburgcite news |url=http://docs.newsbank.com/openurl?ctx_ver=z39.88-2004&rft_id=info:sid/iw.newsbank.com:NewsBank:SJRB&rft_val_format=info:ofi/fmt:kev:mtx:ctx&rft_dat=0EB1469C75B3F16A&svc_dat=InfoWeb:aggregated4&req_dat=AA98CDC331574F0ABEAFF732B33DC0B2 |publisher="The State Journal-Register" (Springfield, IL) |author=Finke, Doug |title=Cold it was, but finally open |date=1989-12-16]October 29 ,1992 – Full openingcite news |url=http://docs.newsbank.com/openurl?ctx_ver=z39.88-2004&rft_id=info:sid/iw.newsbank.com:NewsBank:PJSB&rft_val_format=info:ofi/fmt:kev:mtx:ctx&rft_dat=0EB6EB28F0A36DD7&svc_dat=InfoWeb:aggregated4&req_dat=AA98CDC331574F0ABEAFF732B33DC0B2 |title=31-mile superhighway opens after 30-year drive for safer road |author=Smothers, Michael |date=1992-10-30 |publisher="Peoria Journal-Star"]
direction_a=South
terminus_a=Jct|state=IL|I|55 in Lincoln
junction=
direction_b=North
terminus_b=Jct|state=IL|I|74 in Morton
previous_type=IL
previous_route=154
next_type=IL
next_route=155Interstate 155 (I-155) is a north-south spur of
Interstate 55 that provides an interstate connection for the Illinois cities of Peoria and Lincoln. The northern terminus for the interstate is just east of Peoria, atInterstate 74 exit 101 in Morton. The southern terminus, which is northwest of Lincoln, is located on I-55 at exit 127. The interstate is convert|32.13|mi|km|2 long.I-155 was created to replace
Illinois Route 121 (abbreviated IL 121). Prompted by safety concerns at a major intersection near Morton, state transportation officials replaced the entire route with a limited-access freeway. The interstate was built in several segments from 1970 to 1992, a period of time that included a ten-year delay due to a lawsuit overright-of-way . I-155 fully opened to traffic onOctober 29 ,1992 .Route description
Surrounded mostly by prime land used for farming
soybeans andcorn , Interstate 155 is a four-lane freeway throughrural central Illinois. I-155 also serves numerous small farm towns in addition to Morton, Peoria and Lincoln. The largest city directly served by I-155 is Tremont; however, the highway mainly carries traffic traveling to and from Peoria and Springfield.cite news |url=http://docs.newsbank.com/openurl?ctx_ver=z39.88-2004&rft_id=info:sid/iw.newsbank.com:NewsBank:PJSB&rft_val_format=info:ofi/fmt:kev:mtx:ctx&rft_dat=0EB6EB2455CD5BBF&svc_dat=InfoWeb:aggregated4&req_dat=AA98CDC331574F0ABEAFF732B33DC0B2 |title=Freeway's rocky success story: Four-lane link finally done, but it wasn't easy |date=1992-10-25 |accessdate=2007-12-26 |publisher="Peoria Journal-Star" |author=Williams, Christopher R.]History
I-155 was built on the right-of-way of former IL 121. In the early 1960s, the department of transportation opened IL 98, an east-west two-lane highway running west from downtown Morton to Pekin. Within a few years, the intersection of IL 98 and IL 121 would be known as the "Killer Corner," as traffic volumes increased between Springfield and Peoria on IL 121. Between when IL 98 was opened and when the corner was closed in 1989 for construction of a full interchange, 15 people were killed as a result of automobile accidents at the corner. Led by key supporters—
U.S. Representative Robert Michel , formerIllinois Department of Transportation (IDOT) transportation engineer Jack Harland, and pro-expressway organization "Route 121 by '91" chairman Jim Unland—IDOT initiated plans to widen IL 121 to a four-lane expressway. Near Hopedale, a short portion of IL 121 was reconstructed in the early 1970s to replace a bridge over theMackinaw River . The interchange with I-55 was built, but barricaded to traffic.In 1976, an injunction won by Peoria attorney Timothy Swain Sr. halted further construction on the highway for ten years. The lawsuit was filed by Swain regarding the amount of right-of-way the expressway would consume on his 440 acre (178 hectare) farm near Delavan. A
U.S. District Court judge sided with IDOT on building the road, but the U.S. Seventh District Court of Appeals overturned the decision, forcing IDOT to rewrite itsenvironmental impact statement regarding the Swain farm. In 1986 IDOT struck a deal with Swain, agreeing to reroute the road and take only 40 acres (16 hectares) of land, ending the lawsuit and resuming construction activities. A portion of the road from I-55 to Hartsburg opened onDecember 15 ,1989 , about convert|7|mi|km|0 in length. The expressway was opened in full onOctober 29 ,1992 , at a ceremony attended by GovernorJim Edgar . The total cost of construction for I-155 was US$130 million. Of this, $10 million was provided by federal funding.Illinois initially applied for the new freeway to be designated Interstate 37, but on
December 7 ,1990 , the request was deferred by theAmerican Association of State Highway and Transportation Officials (AASHTO), pending approval by theFederal Highway Administration to add the freeway into the Interstate System. In addition, AASHTO suggested using a 3-digit number when the application was resubmitted.cite web |url=http://cms.transportation.org/sites/route/docs/1990-USRN_Cmte.pdf |title=Route Numbering Committee Agenda |date=1990-12-07 |accessdate=2007-12-24 |author=American Association of State Highway and Transportation Officials] Later, the state submitted another application to AASTHO for the freeway to be named Interstate 155. OnJune 9 ,1991 , the AASTHO application was approved and granted when Interstate 155 was completed.cite web |url=http://cms.transportation.org/sites/route/docs/1991-USRN_Cmte.PDF |title=Route Numbering Committee Agenda |date=1991-06-09 |accessdate=2007-12-24 |author=American Association of State Highway and Transportation Officials]Exit list
References
Wikimedia Foundation. 2010.