- East Kowloon Line
East Kowloon Line (zh-t|t=東九龍綫) was one of the original five
MTR lines proposed in the late 1970s inHong Kong , which would have connected Sheung Wan with East Kowloon, eventually becoming part of the proposedSha Tin to Central Link .Initial proposal (1967)
In September 1967 the Freeman, Fox, Wilbur Smith & Associates of Britain published a proposal to construct a
mass transit system in Hong Kong, in which East Kowloon Line was called Sha Tin Line, connectingWo Liu Hang inFo Tan andTsim Sha Tsui .Alignment and stations
*
Wo Liu Hang (nearSha Tin Racecourse ) would have been a transfer station with today'sEast Rail Line , and also the depot of the line.
*Ha Wo Che
*Sha Tin Central (Sha Tin Park )
*Shan Ha Wai (Tsang Tai Uk )
*Tsz Wan Shan would have been 50 inches deep under Sheung Fung Street, with high-speedelevators like those on theWest Island Line instead of escalators.
*Diamond Hill would have been an interchange withKwun Tong Line , on different levels like in Quarry Bay.
*Kai Tak
*Ma Tau Wai
*To Kwa Wan
*Ho Man Tin
*Hung Hom, the section from which to Tsim Sha Tsui was intended to provide connection between the relocated KCR terminus and Tsim Sha Tsui for transferring to theCBD onHong Kong Island .
*Tsim Sha TsuiInitial system plan (1970)
Freeman, Fox, Wilbur Smith & Associates published a new report on
MTR construction in 1970, with the original Sha Tin Line cut back from Sha Tin to Diamond Hill to become East Kowloon Line, and extended across the harbour from Tsim Sha Tsui to Sheung Wan.Alignment and stations
The new report stated that the Sha Tin section need not be built immediately since an error was made in the 1966 census. However, the report pointed out that the cross-harbour traffic demand for the East Kowloon area would be heavy, necessitating an extension to Rumsey.
*Diamond Hill
*Kai Tak
*Ma Tau Wai
*To Kwa Wan
*Ho Man Tin
*Hung Hom
*Mariner (renamed from Tsim Sha Tsui)
*Rumsey would be located underRumsey Street . It would be integrated with and perpendicular to the proposed Western Market station on the Island Line. Unlike the currentSheung Wan Station , the EKL platforms were one level under Island Line platforms in the 1970 proposal. According to Urban Council sources, the current exit E of Sheung Wan Station is the approximate location of Rumsey Station.Modified Initial System (1975)
With the withdrawal of the Japanese consortium from the MTR construction contract in 1975, the Government announced that the initial system would be reduced to 15.6km to become the Modified Initial System. Construction arrangements would be made on the MIS to facilitate EKL construction at a later time, and the EKL would eventually be able to extend to
Wo Liu Hang as originally planned.Although the 1970 proposal stated that
Sha Tin District did not need a metro during the meantime, the 1975 proposal pointed out that the demand of the EKL would be too low to support construction of the line, if the Sha Tin section was not built together.Architectural reservations
With the uncertainty on the Sha Tin extension, and with no available land to construct a depot along the remainder of the alignment, arrangements were made to let EKL use the Kowloon Bay depot of
Kwun Tong Line .Choi Hung Station
In order to prevent EKL trains from interfering with Kwun Tong Line operation when accessing the depot, a direct track was built for the required connection, which passes through
Choi Hung Station .Diamond Hill Station
According to the MIS plan,
Diamond Hill Station would eventually have five tracks and eight platforms. During construction of the station, spaces were reserved for later construction, making the size of Diamond Hill greater than other stations.Integrated Transport Study (1976)
In 1976 the Government invited a consultation company to carry out a study on transportation in Hong Kong. The resulting report proposed the Sha Tin Loop, East Kowloon Line and the Tsim Sha Tsui extension, built in stages to replace the original EKL proposal. The Loop and the TST extension did not have much difference from the 1967 proposal, although the new arrangement was to let KCRC operate the two lines first, to be transferred to
MTRC after completion of the East Kowloon Line.ha Tin Loop
The Sha Tin Loop was to be constructed as a branch of the
Kowloon-Canton Railway by KCRC, in the form of arapid transit line, providing rail access from easternSha Tin to the urban areas. The route was to connect East Kowloon Line after the latter's completion.Alignment
*
Sha Tin Racecourse atFo Tan
*Wo Che near the estate of the same name
*Yuen Chau Kok
*Sha Tin Wai
*Che Kung Temple aboveTin Sum Village
*Hung Mui Kuk nearHin Keng Estate A new tunnel would be constructed to connect the Tsim Sha Tsui extension.
Tsim Sha Tsui extension
1980s
Eastern Harbour Tunnel
In 1984 the Government decided to construct
Eastern Harbour Tunnel , carrying both road and rail, to alleviate congestion atCross Harbour Tunnel .Kwun Tong Line was extended from Kwun Tong to Quarry Bay upon the tunnel's completion. The plan to construct East Kowloon Line was stalled with the completion of the new cross-harbour connection.heung Wan Station
During the construction of
Sheung Wan Station , platforms for East Kowloon Line were built together to prevent interference that later construction of the EKL might arise. In May 1986, the station was opened with the reserved EKL platforms above Island Line platforms. The ends of the platforms were shut off by brick walls, leaving only 60 metres for the platforms. Posters for the East Kowloon Line were spotted when the station first opened.Other reservations made
East Kowloon Corridor
During the construction of the
East Kowloon Corridor in the 1970s, sheet pile walls were constructed along the alignment and stations on the proposed East Kowloon Line, so that no structural damage would be done to the viaduct during the construction of the MTR line.econd Integrated Transport Study
In 1989 the Government issued the
Airport Core Programme plan, and further postponed the construction of the East Kowloon Line for the reason of "insufficient distribution of resources". TheCentral and Wan Chai Reclamation plan was rearranged to facilitate construction of a fourth cross-harbour railway. KCRC started to propose the plan of extending the KCR network southwards by getting involved in the new railway plan. The cross-harbour section of the East Kowloon Line was substituted by the construction of the third cross-harbour railway onTung Chung Line , part of the proposedAirport Railway .Third harbour rail crossing
In 1989, KCRC handed in a new proposal to the Government, in which today's
East Rail Line , then KCR British Section, would be extended southwards to Central via Victoria Park andCentral and Wan Chai Reclamation .The Government also mentioned the possibility of extending KCR southwards and
Kwun Tong Line to Fortress Hill on the Island Line. Since the reclamation project involved was under discussion, the Government encouraged a new harbour rail crossing to the area ofTin Hau andFortress Hill , with another new railway passing through the reclamation area. Consequently, the KCR proposal was ignored.With the immediate necessity of a third cross-harbour rail link, and also the question about the necessity of a cross-harbour rail link for the
Airport Railway , the Government assigned the new harbour connection to the Airport Railway.The new crossing itself did not solve Tsuen Wan Line's fundamental problem - the line was used by both passengers from
Kowloon andNew Territories East.Fourth harbour rail crossing
With the assignment of the third harbour rail link to the Airport Railway, which alleviated the congestion on the
Nathan Road section ofTsuen Wan Line , the Kwun Tong Line extension plan was held back for further planning and consideration. The reconsidered fourth harbour rail crossing started fromHung Hom to Central via the reclamation area, similar to the 1989 proposal by KCRC.Eastern Corridor
In the new railway development study in 1993, East Kowloon Line was modified to become a
medium capacity system , and the alignment was cut back toKowloon Station on theAirport Railway , forming an Eastern Corridor together withTsim Sha Tsui Extention and Ma On Shan Rail. A reserved space for the East Kowloon Line remains under Kowloon Station.In 1994 the Government published the Railway Development Strategy. The TST extension, Ma On Shan Rail and
Tseung Kwan O Line would be constructed first. Other sections, such as the Eastern Corridor and the fourth cross harbour rail link would be reconsidered. In 1998, the Government published the third Integrated Transport Study and the second Railway Development Study, breaking the Eastern Corridor into sections and proposing numerous plans to link them up, forming today'sWest Rail Line ,Kowloon Southern Link ,Tsim Sha Tsui Extension ,Sha Tin to Central Link (including the fourth harbour rail crossing, East Kowloon Line, and the railway from Tai Wai to Diamond Hill) andMa On Shan Line . In the same year, KCRC won the tender to construct and operate West Rail, TST Extension and Ma On Shan Rail. The East Kowloon Line became the East Kowloon section of the Sha Tin to Central Link.References
* "Hong Kong passenger transport survey"(PTSU): Dalby, E. & Great Britain. Road Research Laboratory.(1967)
* "Hong Kong mass transport study"(MTS-1967):Freeman, Fox, Wilbur Smith & Associates. & Hong Kong Government(1967)
* "Hong Kong mass transit further studies"(MTS):Freeman, Fox, Wilbur Smith & Associates. & Hong Kong Government(1970)
* "Development of the initial system of the Hong Kong Mass Transit Railway from the further studies proposals":Coulson, C. R.(1975)
* "Hong Kong comprehensive transport study"(CTS-1):Wilbur Smith and Associates.(1976)
* "Hong Kong's new towns : a selective review":Roger Bristow.(1989)
* "Hong Kong second comprehensive transport study"(CTS-2):Wilbur Smith and Associates. & Hong Kong Transport Dept.(1989)
* "Moving into the 21st century : the green paper on transport policy in Hong Kong":Hong Kong. Government Secretariat. Transport Branch.(1989)
* "Moving into the 21st century : the white paper on transport policy in Hong Kong":Hong Kong. Government Secretariat. Transport Branch.(1990)
* "Railway development study"(RDS-1):Hong Kong Transport Bureau(1993)
* "Railway Development Strategy"(RDS-94):Hong Kong Transport Bureau(1994)
* "Kowloon transport super city":Steven Smith(1998)
* "The Second railway development study"(RDS-2):Hong Kong Transport Bureau(1999)
* "Third comprehensive transport study"(CTS-3):Wilbur Smith and Associates. & Hong Kong Transport Bureau(1999)
* "Railway Development Strategy 2000"(RDS-2000):Hong Kong Transport Bureau(2000)