Spruce Falls was the local name for a small waterfall where the Swan river empties into Duck lake in northeastern
Saskatchewan , near theManitoba boundary. It is located at 55°37′ N and 102°7′ W.The Swan river, about four miles in length, is the outlet channel from Birch lake into Sisipuk (Duck) lake. The water eventually flows into the
Churchill River . It has a drainage area of 700 sq. mi. (1800 km2) consisting of a number of lakes, chief among which areMari lake , 19 sq. mi. (50 km2),Barrier lake , 55 sq. mi. (142 km2), andBirch Burntwood lake , 16 sq. mi. (41 km2). ref|BarrierIn 1928, Spruce Falls became the site of a temporary power plant supplying the
Island Falls, Saskatchewan hydroelectric power development on theChurchill River .pruce Falls and the Island Falls Power Development
A large amount of power is required for construction purposes on a job the size of the Island Falls development. As steam and gasoline units could be used only to a minor extent owing to the high cost of transporting fuel, the only alternative was to find a site where hydroelectric energy could be generated. Engineers for the
Churchill River Power Company determined that Spruce Falls, about 13½ miles (22 km) northeast of Island Falls, was suitable.By utilizing the natural fall of twenty-five feet at Spruce Falls in addition to a fifteen-foot high timber dam which impounded a small forebay, a head of forty feet was developed. Water from the head pond was conveyed to generator turbines by two
wood stave pipes seven feet wide and ninety feet long.The Power House
The Spruce Falls temporary power-house was a frame building on the shore of Sisipuk lake. It contained two small generating units and complementary equipment. These two 1,250 h.p. vertical-type turbines, with propeller-type runners, were direct connected to 1,000 kVa generators delivering power at 600 volts, 3 phase, 60 cycles to a bank of transformers.
The transformer bank was placed apart from the power-house and protected by a
lightning arrester and fuses. Rated at 2,000 kVa, these transformers stepped the voltage up to 26,400 volts for transmission to Island Falls. There, a sub-station stepped the current down to 600 volts for two motor-generator sets which supplied current for the electric locomotives used in hauling earth, concrete and other construction materials.Completion of the Project
Work on the temporary power plant was started on October 4, 1928. Its operation began on March 20, 1929, and continued without interruption until No. 1 Unit at Island Falls took up the load on June 5, 1930. Subsequently, the Spruce Falls plant was dismantled and, under very difficult freighting conditions due to snow and weak ice, the two small generating units were brought to Island Falls, where they were permanently installed in 1933.
During the period of operation this plant supplied 4,698,000 kWh of electrical energy for construction purposes, at an average cost of 4.35 cents per kWh.
Notes
# A dry season in 1929 resulted in low water level in 1930 and it became necessary to find additional sources of water in order to maintain the amount of power required for construction. The outlet of Barrier lake was cut through, and its 55 square miles (142 km2) of water was lowered six feet (2 m) in order to furnish enough power to complete the construction at Island Falls. After construction, the outlet was replaced by a faced, rock-filled, timber-crib weir, thus restoring Barrier lake to its former elevation.
References
*
Marshall, M.H. Power Development at Island Falls, Churchill River, a paper presented at the Calgary Branch of The Engineering Institute of Canada, January 29th, 1931.*
Davis, R.W. andHuffaker, M.F. Island Falls Power Development on the Churchill River, a paper presented at the annual general meeting of the Canadian Institute of Mining and Metallurgy, Winnipeg, MB, March, 1935.