- Ashby-de-la-Zouch Canal
The Ashby-de-la-Zouch Canal is a 22 mile (35 km) long
canal inEngland which travels betweenBedworth inWarwickshire and theLeicestershire village ofSnarestone . The canal used to travel 8 miles (13 km) further north to Moira, just outside the town ofAshby-de-la-Zouch , but this section was affected by mining subsidence, and was progressively closed between 1918 and 1966.The abandoned section is the subject of a restoration project and is the first canal where a new section has been authorised under the Transport and Works Act (1992). The Transport and Works Order was obtained by Leicestershire County Council, as some of the original route has been infilled and built over, and restoration therefore involves construction on a new route.
Route
The canal starts at a junction with the
Coventry Canal just outside Bedworth and travels north-east for about 7 miles (11 km) through the town ofHinckley . It then continues to run north through largely rural and remote countryside for another 15 miles (24 km) until reaching its terminus at Snarestone. NearSutton Cheney Wharf, it passes the foot ofAmbion Hill , the site of theBattle of Bosworth Field . AtShackerstone , it passes the station that is the HQ of theBattlefield Line Railway .History
Origins
In the last half of the eighteenth century there had been an increasing need for transport to exploit the
coal reserves at Ashby Wolds and lime from the quarries north of Ashby-de-la-Zouch. It was not, however, until 1794 thatWilliam Jessop and Robert Whitworth proposed a canal from the Coventry Canal nearNuneaton . (Robert Whitworth was later remembered with the naming in 2002 of Whitworth Avenue on the new George Wimpey development in Hinckley, which overlooks the Ashby Canal). Its course, though meandering, was to be substantially level until the last four miles (6 km), where it would climb convert|139|ft|m to a summit at Ashby Wolds. This summit level would be supplied by a steam-engine pump from a nearby reservoir. It would continue for four and a half miles to a junction on the far side of Ashby-de-la-Zouch. One branch would run toColeorton and thence to Cloud Hill, nearBreedon-on-the-Hill . The other would run toTicknall .Construction
The Act having been passed in that year, Jessop withdrew, and Whitworth carried on with the assistance of his son. By 1797, however, it was clear that the costs had been seriously underestimated. Moreover, many shareholders had not honoured their pledges, and the country was in the grip of one of its periodic financial crises.
All work was stopped, except on the lower part, and consideration was given to using railways (or
wagonways as they are now known). Fortunately the necessary wording had been included in the Act. However, Whitworth's proposals, somewhat incompehensibly, were for lines independent of the canal. One would run from Ticknall to theRiver Trent ; the other, following a plan which had previously been suggested by Jessop for theEarl of Stamford would run to the Trent from the Cloud Hill quarries.In 1798, Thomas Newton had taken over from Whitworth and was asked to investigate the possible lines for railways which would serve the canal at Ashby Wolds, then in September,
Benjamin Outram was asked to advise.The lines finally built ran from the
Willersley Basin through Ashby to a junction at Old Parks, thus eliminating the long canal loop through Ashby Wolds andBlackfordby . One branch ran throughLount to Cloud Hill, replacing the proposed canal and its diversion through Coleorton. The other branch led from Old Parks to Ticknall, with branches to the quarries betweenCalke Abbey andStaunton Harold . As built the lines measured twelve and a half miles.Outram's engineer for the line was John Hodgkinson who was experienced in the work, but problems arose because the committee insisted that it should proceed on all sections of the line simultaneously, which made supervision difficult. Moreover, perennially short of money, they were dilatory in making decisions and providing funds, which caused Outram problems at his Butterley Works as he was having to refuse contracts, so that he could be ready to provide the canal with material, as and when it was authorised. During this period of delay, the labour costs and the price of iron also rose.
Originally intended to be the three foot six gauge usual at that time, Outram recommended in 1799 that it should be four foot two, forecasting that, within a few years, railways would be the principal mode of transport throughout the country. Even though Outram's experience of his treatment by the canal proprietors must have spoilt his satisfaction on the completion of the lines, they were arguably a major achievement and a model for railways in the future. The proprietors also must have been somewhat scarred, inexperienced as they were in the financing of major capital works.
Later history
The canal was opened in 1804 and it took several years for the venture to become successful, with a dividend not being paid until 1828. In 1846 it was taken over by the
Midland Railway company for just £110,000, a considerable loss for the owners, who had paid £184,000 in construction.In 1864 the Midland replaced the section from Ashby to Worthington, enlarging the Old Parks tunnel, running it on through
Melbourne toDerby . The remainder of the lines were kept for local use, the branch to Ticknall closing in 1915.Its railway owners did not invest sufficient money in the canal to maintain it properly, preferring to see traffic being carried on the railway, and so its condition gradually deteriorated. In 1918 a major breach caused by mining subsidence caused the last few miles of the canal near Ashby to be abandoned. The canal was nearly closed completely: only the strategic importance of the coal supplies during the First World War allowed it to survive. In 1944, the
London, Midland and Scottish Railway (LMS) railway, which by then owned the canal, closed down several more miles of its northern end. Further closures followed in 1966, largely owing to mining subsidence.Traces of the old railway can still be seen, particularly towards Ticknall. A low embankment, still with some stone sleeper blocks crosses a field and a tunnel under the drive to
Calke Abbey . There is also an arch bridge in Ticknall village where the line ran into the quarries.Restoration
Now the mining industry in the area has gone, there are plans to re-open the canal to the National Forest visitor centre at Moira, about one mile (2 km) short of its original terminus at Spring Cottage. Between 1999 and 2005, a stretch of the canal near Moira was restored and re-filled with water, [http://www.leics.gov.uk/e0051_ashby_canal_exec_summary.pdf Leicester County Council business plan] ] passing the historic
Moira Furnace . However, the A42 main road has been built across the canal's formation making a complete re-opening unlikely in the near future. In October 2005, Leicestershire County Council obtained a Transport and Works Order to enable them to purchase land and construct 2.5 miles (4 km) of canal from Snarestone to Measham. Initially, this will follow the original route, but will diverge near Measham, to use the track of a redundant railway. The new canal will pass through Measham Station and cross the High Street on an aqueduct. It now seems only a matter of time until complete restoration will be accomplished.The Transport and Works Act Order was introduced by the British Parliament in 1992 as a way of simplifying the legal processes for railway and canal projects. Although a number of railway projects had previously been authorised under this legislation, the Ashby Canal Order obtained by Leicestershire County Council was the first time that construction of a canal had been authorised in this way. [ [http://www.leics.gov.uk/pressrelease.htm?id=65241 Leicestershire County Council press release] ]
Coordinates
*coord|52.7390979|N|1.5422487|W|display=inline North terminus, Moira
*coord|52.6863727|N|1.4892751|W|display=inline Current north terminus
*coord|52.6814818|N|1.494956|W|display=inline Snarestone tunnel
*coord|52.6590036|N|1.445936|W|display=inline,title Canal near Shackerstone
*coord|52.5413238|N|1.4050269|W|display=inline A47 road crossing
*coord|52.4900322|N|1.4590573|W|display=inline Southern terminusee also
*
Ashby Canal Association
*Ashby Canal Trust
*Moira Furnace References
* Clinker, C.R., and Hadfield, C., (1978) "The Ashby-de-la-Zouch Canal and its Railways" Bristol: Avon-Anglia Publications & Services. Reprinted from (1958) the Transactions of the Leicestershire Archaeological and Historical Society.
* Schofield, R.B., (2000) "Benjamin Outram," Cardiff: Merton Priory PressExternal links
* [http://www.ashbycanal.org.uk/ Ashby Canal Association]
* [http://www.derbyphotos.co.uk/areas_p_z/ticknall/ticknall01.htm Derby Photos - Ticknall Tramway Bridge]
* [http://www.scienceandsociety.co.uk/results.asp?
]
Wikimedia Foundation. 2010.