- Skarnsund Bridge
Infobox_Bridge
bridge_name = Skarnsund Bridge
caption =
official_name = Skarnsundet bru
carries =Road vehicle s andPedestrian s
crosses =Skarnsundet
locale =Inderøy andMosvik
maint = Nord-Trøndelag Road Department
id =
design =Cable-stayed bridge
mainspan = convert|530|m|ft|0
length = convert|1010|m|ft|0
width =
clearance =
below = convert|45|m|ft|0
traffic =
open =December 19 ,1991
closed =
toll = NOK 33 / 66 / 198 / 330
map_cue =
map_
map_text =
map_width =
coordinates = coord|63|50|35.42|N|11|4|31.54|E|disp=title,inlineSkarnsund Bridge ( _no. Skarnsundet bru) connects the municipalities of
Mosvik andInderøy inNord-Trøndelag inNorway together as part of route 755. The soundSkarnsundet connects Trondheim Fjord withBeitstad Fjord while the bridge connects the regions of Innherred withFosen .History
The
bridge was opened by King Harald V onDecember 19 1991 at the picnic stop beside the west foot of the bridge, where one can find "the king stone" with the king's signature.The ferry connection between Vangshylla on the Inderøy side and Kjerringvik on the Mosvik side was replaced by the bridge. The ferry had hourly departures from each side and was operated by
Innherredsferja .Design
The bridge is one of the world's longest
cable-stayed bridge s, with a length of 1 010 meters. The span is 530 meters, while the two towers are 152 metes above sea level. It is the longestconcrete cable-stayed span. [Walther, Rene et al., "Cable stayed bridges", Thomas Telford Publishing, 2nd edn., 1999, p.18] The sailing height is 45 meters. The bridge was, on its completion, the longest cable-stayed bridge in the world by the length of main span.The Skarnsund Bridge has won many awards, including "Beautiful Roads Award", "The Road Director's Award", "The Concrete Plate -92" and "FIP Award" (an international concrete award). The original construction work also included 1.6 km of new road. In the construction of the bridge, starting in 1988, 19.600 km³ concrete was used and the 208
cable s with a total length of 33 km weigh 1 030 tonnes. The cables have a diameter varying between 52 mm and 85 mm and can, if needed, be replaced separately. The bridge is fundamented in bedrock below the seabed under each tower. The bridge was build to withstand winds up to 48,5 m/s (century storms) and is control calculated forearthquakes .Financing
In total, the bridge cost 219 million NOK, whereof 30% was to be paid by tolls, which were collected at a
toll plaza on the Inderøy side. The company "AS Skarnsundbrua" was incorporated to collect the money, and the final collection of money occurred onMay 15 2007 .The final tolls were
* NOK 33 for motor bikes,
* NOK 66 for cars,
* NOK 198 for trucks, and
* NOK 330 for trucks with trailers.ee also
*
List of bridges in Norway
*List of bridges in Norway by length
*List of bridges
*List of bridges by length
*List of longest cable stayed bridges
*List of toll roads References
External links
* [http://home.no.net/lotsberg/data/norway/bru.html Bridges in Norway]
* Pictures [http://home.c2i.net/pirill/inderoy/indskarn.htm] [http://home.online.no/~arn-hemb/LMFK/skarnsundbrua01.jpg] [http://koti.japo.fi/~aapisku/mosvik/bridgenight.jpg] [http://exviking.net/road/small/Skarnsund.htm] [http://www.ngi.no/English/images/skarnsundet_bru.jpg]LongestBridge
type = cable-stayed
start = 1991
end = 1993
previous = Alex Fraser Bridge
current = Skarnsund Bridge
next = Yangpu BridgeCrossings navbox
structure=Crossings
place=Trondheimfjord
bridge=Skarnsund Bridge
bridge signs=Riksvei|755
upstream=
upstream signs=
downstream=Levanger–Hokstad Ferry
downstream signs=Riksvei|774
Wikimedia Foundation. 2010.