Nuremberg–Augsburg railway

Nuremberg–Augsburg railway
Nuremberg–Augsburg
Route number: 900, 910, 970.1
Line number: 5300 (Augsburg–Donauwörth)
5310 (Donauwörth–Treuchtlingen)
5320 (Treuchtlingen–Nuremberg)
Line length: 137.1
Gauge: 1435
Voltage: 15 kV, 16.7 Hz AC
Maximum incline: 0.71  %
Maximum speed: 200
Legend
Straight track
from Schwandorf S 1
Straight track
and Feucht S 2
Junction from left
from Regensburg
Straight track
and Ingolstadt Hbf (Nuremberg–Munich HSL)
Junction from right
from Cheb
Station on track
61.8 Nürnberg Hbf terminus of S 1 S 2 S 3 (312 m)
Junction to right
to Roth S 3
Junction to left
to Crailsheim
Straight track
to Bamberg
Junction to left
and Würzburg
Unknown BSicon "KRZo"
60.4 Nuremberg–Bamberg/–Würzburg lines
Unknown BSicon "KRZo"
Nuremberg–Crailsheim line
Small bridge
60.2 Frankenschnellweg
Unknown BSicon "eHST"
58.9 Nürnberg-Sandreuth (main line station closed 2001)
Small bridge
58.9 B 4 R
Unknown BSicon "KRZu"
58.6 Marshalling yard–main goods yard line
Unknown BSicon "KRZu"
58.0 Ring railway
Unknown BSicon "KRZu"
57.x Nürnberg Hohe Marter–Nürnberg-Eibach line
Elevated start
57.5 South-west Tangent
End of bridge over water
Rhine–Main–Danube Canal
Junction from left
from Nuremberg marshalling yard exit and
Straight track
Nürnberg Hohe Marter/Nuremberg yard Minerva bridge
Non-passenger station/depot on track
56.6 Nürnberg-Eibach (main line station closed 2001)
Junction to left
siding to Port Nuremberg and container terminal (since 2009)
Unknown BSicon "KRZu"
Nuremberg–Roth line
Exclusive track change to left
54.4 flying junction (S-Bahn line switch)
Non-passenger station/depot on track
53.4 Nürnberg-Reichelsdorf (main line station closed 2001) (314 m)
Unknown BSicon "eHST"
51.8 Reichelsdorfer Keller (main line station closed 2001)
Bridge over water
51,0 Rednitz viaduct, Katzwang (181 m)
Unknown BSicon "eHST"
50.4 Katzwang (main line station closed 2001) (325 m)
Unknown BSicon "eHST"
48.4 Schwabach-Limbach (main line station closed 2001)
Station on track
46.7 Schwabach
Small bridge
46.6 B 2
Junction from left
46.5 from Nuremberg–Roth line
Underbridge
45.8 A 6
Unknown BSicon "eBHF"
43.4 Rednitzhembach (main line station closed 2001)
Unknown BSicon "eBHF"
39.3 Büchenbach (main line station closed 2001)
Bridge over water
Aurach (75 m)
Station on track
36.2 Roth
Junction to left
36.2 to Hilpoltstein
Stop on track
32.4 Unterheckenhofen
Bridge over water
Fränkische Rezat (68 m)
Station on track
27.8 Georgensgmünd (357 m)
Unknown BSicon "eABZrf"
to Spalt
Stop on track
23.9 Mühlstetten
Bridge over water
Brombach bridge (listed 7 arch viaduct)
Bridge over water
Höbach bridge (listed 3 arch viaduct)
Station on track
18.1 Pleinfeld (connection to Sand Railway, narrow gauge)
Junction to right
to Gunzenhausen
Stop on track
13.2 Ellingen (Bay) (398 m)
Station on track
8.8 Weißenburg (Bay)
Unknown BSicon "eABZlf"
factory sidings
Unknown BSicon "eBHF"
3.8 Grönhart
Unknown BSicon "eABZlg"
3.4 Grönhart siding (substation)
Bridge over water
Altmühl
Junction from right
from Würzburg
Station on track
0.0
34.5
Treuchtlingen (420.2 m)
Junction to left
to Ingolstadt
Unknown BSicon "eABZlf"
31.4 Treuchtlingen marble works siding
Bridge over water
29.2 Upper Möhrenbach bridge (183 m)
Unknown BSicon "eBHF"
28.9 Möhren
Unknown BSicon "eHST"
26.0 Gundelsheim (Schwab)
Station on track
22.3 Otting-Weilheim (487.7 m)
Unknown BSicon "STRSummit"
18.4 DanubeMain watershed (511.6 m)
Unknown BSicon "eABZrg"
from Monheim
Unknown BSicon "eBHF"
16.5 Fünfstetten (502.3 m)
Non-passenger station/depot on track
11.4 Mündling (471.5 m)
Small bridge
B 25
Track change
5.0 Berg crossover
Bridge over water
2.3 Wörnitz (150 m)
Junction from right
from Aalen
Junction from right
from Ulm
Station on track
0.0
40.8
Donauwörth (403.7 m)
Bridge over water
Danube (125 m)
Bridge over water
Zusam (45 m)
Junction to left
to Ingolstadt
Unrestricted border on track
39.8 Start of LZB
Stop on track
36.9 Bäumenheim
Unknown BSicon "eABZlg"
from Wertingen
Station on track
33.5 Mertingen station (409 m)
Stop on track
25.9 Nordendorf
Stop on track
23.5 Westendorf
Underbridge
B 2
Station on track
20.5 Meitingen
Stop on track
18.7 Herbertshofen
Junction from left
16.4 Meitingen steel works junction
Underbridge
B 2
Stop on track
14.4 Langweid (Lech)
Station on track
11.3 Gablingen (460 m)
Station on track
6.8 Gersthofen (473 m)
Small bridge
A 8
Small bridge
B 17
Unknown BSicon "KRZu"
Ulm–Augsburg line
Unrestricted border on track
2.7 End of LZB
Small bridge
B 10
Junction from left
from Ulm
Station on track
2.0 Augsburg-Oberhausen
Bridge over water
Wertach
Unknown BSicon "KRZo"
Augsburg Local Railway
Station on track
0.0 Augsburg Hbf (490 m)
Junction to right
to Buchloe
Straight track
to Ingolstadt
Straight track
and Munich

The Nuremberg–Augsburg railway is a 137 km long main line in the German state of Bavaria. Most of it follows two parts the historic Ludwig South-North Railway, one of the oldest lines in Germany. Today, even after the opening of the high-speed line from Nuremberg to Munich via Ingolstadt, is still used for long distance services. It is also used as a detour during closures of the high speed line for maintenance. Between Nuremberg and Roth S-Bahn services run on the parallel Nuremberg–Roth line.

Contents

History

The first plans for a railway line from Augsburg to Nuremberg were made shortly after the opening of the first railway line in Germany, the Nuremberg–Fürth line in 1835. Merchants from the Augsburg area formed a joint-stock company for the construction and operation of a line from Augsburg to Nuremberg via Donauwörth and Treuchtlingen. The company was dissolved in 1841 because it was understood that King Ludwig I intended to build a state railway and because the company had decided that the difficult geography between Donauwörth and Treuchtlingen (the Franconian Alb) made it impossible to build and operate a railway economically.

Brombach viaduct with its seven spans dates from the opening of the line and is now heritage-listed

The Bavarian state government handled the problem of crossing the Franconian Alb by routing the Ludwig South-North Railway through the Nordlinger Ries depression. Therefore only the Augsburg–Donauwörth and Pleinfeld–Nuremberg sections of the Nuremberg–Augsburg were part of the South-North Railway, which was authorised by the Bavarian parliament on 25 August 1843. The Treuchtlingen–Pleinfeld section was built in connection with the construction of the Ingolstadt–Treuchtlingen line and opened on 2 October 1869. The gap between Donauwörth and Treuchtlingen was not completed until 1 October 1906, when more advanced steam engines made the operation of the hilly line more economic.

On 1 October 1898, the flying junction between Nuremberg suburbs of Eibach and Reichelsdorf was opened, allowing a grade-separated entrance for freight trains to the Nuremberg marshalling yard. Work on the electrification of the line began in 1933 and was completed on 10 May 1935.

The 36.5 km section between Augsburg-Oberhausen and Donauwörth was cleared in two sections in 1978 and 1981 for speeds of up to 200 km/h. This was one of the first lines in Germany, where this speed was authorised.[1]

On 29 June 1994, a ground breaking ceremony was held for the beginning of the rebuilding of the section from Nuremberg Hauptbahnhof to Roth for S-Bahn operations, which was completed on 9 June 2001.

The overhead wiring of the line, mostly dating from 1935, was renewed between 2004 and 2006.

Opening dates

  • 20 November 1844 (Oberhausen–Nordheim )
  • 1 July 1847 (Augsburg–Oberhausen )
  • 15 September 1847 (Nordheim–Donauwörth)
  • 1 April 1849 (Nuremberg–Schwabach )
  • 1 October 1849 (Schwabach–Pleinfeld )
  • 2 October 1869 (Treuchtlingen–Pleinfeld)
  • 1 October 1906 (Donauwörth–Treuchtlingen)

Testing and record runs

On 17 October 1984, locomotive 120001-3 hauled a train of three carriages (trailing load: 250 t) between Donauwörth and Augsburg at 265 km/h, a world record for a three-phase-powered train.[2]

In 1993, a trial of new air-sprung bogies for Intercity Express trains achieved a speed of 333 km/h between Augsburg and Donauwörth.[3]

Route

The route leaves Nuremberg Hauptbahnhof, initially running parallel with the lines to Crailsheim, Bamberg and Würzburg, running to the west. It passes under the Frankenschnellweg freeway and then makes a long turn to the south. It passes through the districts of Sandreuth, Schweinau and Werderau and then crosses the South-west Tangent (Südwesttangente) freeway, the Rhine–Main–Danube Canal and the Ring line, where there is an extensive system of connecting lines and reaches the flying junction between the stations of Eibach and Reichelsdorf, which are now stations for the S-Bahn only. The flying junction allows the S-Bahn tracks to switch from the west of the main line tracks to the east. In addition, the south main line track switches to the right, as trains have been running on the left since Nuremberg Hauptbahnhof, unusually for Germany.

The line runs through the Nuremberg districts of Reichelsdorf, Reichelsdorfer Keller and Katzwang and the Schwabach districts of Limbach and Waldsiedlung, crosses the Rednitz and Schwabach rivers and finally reaches Schwabach station. The line makes a turn to the left and then runs parallel to the Rednitz through Rednitzhembach and via Roth to Georgensgmünd and from there parallel to Federal Highway 2 and the Rezat river to Pleinfeld. In Roth, the line to Hilpoltstein (also known as the Greding Railway, Gredlbahn) branches off. Until 1995, a line branched from Georgensgmünd to Spalt. Another branch, known as the Lakeland Railway (Seenlandbahn), as it passes through the Franconian Lake District, connects Pleinfeld with Gunzenhausen; it was part of the original Ludwig South-North Railway. The line continues to the Baroque town of Ellingen and Weißenburg, which was established on a Roman settlement. North of Weißenburg the line crosses the Swabian Rezat river. Just before the railway junction in Treuchtlingen with the lines from Wurzburg and to Ingolstadt, the line crosses the remnants of the ancient Fossa Carolina canal and the Altmühl river.

After Treuchtlingen the line runs south up the Möhren valley and through the Franconian Alb to the railway junction of Donauwörth, where the Ries Railway connects to Nördlingen and the Danube Valley Railway connects to Ingolstadt and Ulm. Formerly there were several stations in the Alb, but they have now largely been closed and dismantled. Only Otting-Weilheim is still served by regional trains; Mündling is still used for operational purposes. Fünfstetten, which was once a junction to a branch line to Monheim, is currently only rarely used or only as a siding. The line crosses the Wörnitz shortly before Donauwörth, and shortly afterwards crosses the Danube and the Zusam and then runs parallel to the Lech. At Mertingen the line used to meet a branch line to Wertingen, and at Herbertshofen and Gablingen there are industrial sidings. After Gersthofen, the line crosses the A8 autobahn and Federal Highway 2 and then joins the Ulm–Augsburg line to run through Augsburg-Oberhausen station, cross the Wertach river and the Augsburg Local Railway and finally reach Augsburg Hauptbahnhof.

Development

The route is double track and electrified throughout. Between Nuremberg and Roth the line runs parallel with the one or two-track Nuremberg-Roth S-Bahn line. In addition, between Nuremberg station and Reichelsdorf trains run on the left, to facilitate connections with the Nuremberg ring line.

The projected Augsburg S-Bahn would involve the upgrading of the Meitingen–Augsburg Hbf section to three tracks. Detailed planning and funding of the project have not been completed. A decision to go forward with the project is not expected before 2015.

The first Federal Transport Infrastructure Plan of 1973 identified a high-speed line between Würzburg and Augsburg via Nuremberg as one of eight development projects.[4] The line was listed as the Würzburg–Augsburg high-speed railway line in the Coordinated Investment Program of the Federal Transport Infrastructure Plan of 1977.[5] It was also identified as being an urgent priority in the Federal Transport Infrastructure Plan of 1985.[1]

Transport associations

The line is operated as Regionalbahn line R6 or R64 from Nuremberg to Otting-Weilheim by the Greater Nuremberg Transport Association (Verkehrsverbund Großraum Nürnberg,VGN) and as Regionalbahn line R4 from Otting-Weilheim to Augsburg by the Augsburg Transport Association (Augsburger Verkehrsverbund, AVV).

Operations

Class 111 hauling double deck carriages of the Nuremberg-Augsburg Regional Express
Class 612 hauling Franken-Allgäu Express near Treuchtlingen

Intercity Express and Intercity trains operate long-distance services over the line.

The northern section from Nuremberg to Treuchtlingen is served hourly by Regional-Express trains that continue every two hours alternately via Ingolstadt to Munich or Augsburg. These are usually operated by Class 111 electric locomotives, hauling five double-deck carriages. Since December 2006, a Modus-Wagen train set has also been used. South of Treuchtlingen there is an additional regional express service, which combined with the two-hourly service from Nuremberg, provides an hourly service. This service is operated by push-pull trains, hauled by class 110 or 111 locomotives.

Between Donauwörth and Augsburg there is also an hourly Regionalbahn service, which continues every two hours to Munich. The services running only between Donauwörth and Augsburg are operated with the class 425 electric multiple units, the services continuing to Munich are operated by locomotive-hauled double-deck sets.

Since the timetable change on 10December 2006, a direct link between Nuremberg and Lindau has been operated under the name of Allgäu-Franken-Express, using diesel multiple units of class 612 because of the section between Augsburg and Lindau is not electrified. Four pairs of trains operate each day on the route, stopping in Treuchtlingen and Donauwörth, and provide along with some ICE and IC trains, fast connections between Augsburg and Nuremberg.

Sources

Notes

  1. ^ a b Block, Rüdiger (1991). "ICE-Rennbahn: Die Neubaustrecken" (in German). Eisenbahn-Kurier (21: Special: "Hochgeschwindigkeitsverkehr (High-speed transport"): 36–45. 
  2. ^ "Präsentation der Lok BR 120 – Weltrekord von 265 km/h für Lokomotiven in Drehstromantriebstechnik (Presentation of locomotive BR 120 - world record of 265 km h for locomotives with AC drives" (in German). Eisenbahntechnische Rundschau 33 (11): 861 f.. 1984. 
  3. ^ "ICE fährt luftgefedert (ICE air suspension)" (in German). Die Deutsche Bahn (9/10): 725 f.. 1993. 
  4. ^ Block, Rüdiger (1991). "ICE-Rennbahn: Die Neubaustrecken" (in German). Eisenbahn-Kurier (21: Special: "Hochgeschwindigkeitsverkehr (High-speed transport"): 30–35. 
  5. ^ Linkerhägner, Wilhelm (1977). "Neu- und Ausbaustrecken der Deutschen Bundesbahn (New and upgraded lines of the German Federal Railways)" (in German). Jahrbuch des Eisenbahnwesens: 78–85. 

References

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужно сделать НИР?

Look at other dictionaries:

  • Nuremberg–Bamberg railway — Nürnberg Hbf – Bamberg Route number: 820, 891.2 Line number: 5900 Line length: 62,4 Gauge: 1435 Voltage …   Wikipedia

  • Nuremberg–Crailsheim railway — Nuremberg Hbf – Crailsheim Route number: 786, 890.4 Line length: 90.4 Gauge: 1435 Voltage: 15 kV, 16.7 Hz AC Maxim …   Wikipedia

  • Nuremberg–Regensburg railway — Nuremberg Hbf – Regensburg Hbf Route number: 880 Line number: 5850 Line length: 100.6 Gauge: 1435 Voltage …   Wikipedia

  • Nuremberg–Cheb railway — Nuremberg Hbf – Cheb Route number: 512, 544, 860, 891.3 Line number: 5903 Line length: 151.4 Gauge: 1435 Voltage …   Wikipedia

  • Nuremberg–Würzburg railway — Nürnberg Hbf – Würzburg Hbf Route number: 805, 811, 891.1, 900 Line number: 5900 (Nürnberg Hbf – Fürth (Bay) Hbf) 5910 (Fürth (Bay) Hbf – Würzburg Hbf) Line length: 102,2 Gauge …   Wikipedia

  • Nuremberg–Schwandorf railway — Nürnberg Hbf – Schwandorf Route number: 870, 890.1 Line length: 93.7 Gauge: 1435 Voltage: Nürnberg Hbf – Hartmannshof: 15 kV, 16,7 Hz  …   Wikipedia

  • Augsburg Railway Park — The Augsburg Railway Park ( Bahnpark Augsburg ) is a railway museum in Augsburg [Kursbuch 254] on part of the former Augsburg locomotive shed owned by the Deutsche Bahn. At present the Railway Park is still under construction and is therefore… …   Wikipedia

  • Munich–Augsburg railway — Munich–Augsburg Route number: 980, 999.4 Line length: 61.9 Gauge: 1435 Voltage: 15 kV 16.7 Hz AC Maximum speed …   Wikipedia

  • Munich–Augsburg Railway Company — The Munich Augsburg Railway Company (München Augsburger Eisenbahn Gesellschaft), the second private railway company in Bavaria, built the Munich–Augsburg line between 1838 and 1840. It was nationalised in 1846 and became part of the Royal… …   Wikipedia

  • Munich-Augsburg Railway Company — The Munich Augsburg Railway Company ( München Augsburger Eisenbahn Gesellschaft ), the second private railway company in Bavaria, built the so called Maximilian Railway from Munich to Augsburg between 1838 and 1840. Foundation and Construction of …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”