- Alabama and Florida Railway
Infobox SG rail
railroad_name=Alabama and Florida Railway
logo_filename=
logo_size=
old_gauge=
marks=AF
locale=Andalusia, Alabama toGeneva, Alabama
start_year=November 23 ,1992
end_year=present
hq_city=Pittsburg, Kansas (corporate);Opp, Alabama (operations)The Alabama and Florida Railway is one of severalshort line railroad companies owned by thePioneer Railcorp . OnNovember 23 1992 , the Alabama and Florida Railway (AF) purchased the tangible assets of the A&F Inc., doing business as the Alabama and Florida Railroad Company. The line ran from Georgiana to Geneva, Alabama, a distance of convert|76|mi|km and interchanged withCSX at Georgiana.On
June 11 2001 , the Alabama and Florida Railway sold a convert|33|mi|km|sing=on segment of its track from Georgiana, AL to Andalusia, AL, to theThree Notch Railroad (TNR), which is owned byGulf and Ohio Railways .CSX maintainstrackage rights over the line.Towns served
*
Andalusia, Alabama Interchange with theThree Notch Railroad
*Opp, Alabama Location of Enginehouse
*Samson, Alabama
*Geneva, Alabama History
The line was built in 1901 by the Alabama & Florida Railroad and ran from a connection with the
Louisville & Nashville (nowCSX ) atGeorgiana, Alabama and terminated atGraceville, Florida with a connection to theAtlanta and St Andrews Bay Railroad (now theBay Line Railroad ).The Louisville & Nashville (later
Seaboard System ), operated the line from 1901 until it was acquired onJuly 28 1986 , by Gulf and Ohio Railways, and renamed its original name, the Alabama & Florida Railroad. The Alabama & Florida "Railroad" was purchased byPioneer RailCorp onNovember 23 1992 , and renamed the Alabama & Florida "Railway".The
Geneva, Alabama toGraceville, Alabama section of track (23 miles) was abandoned. TheAndalusia and Conecuh Railroad that connected with the AF at Andalusia was abandoned in 1987.The Alabama and Florida Railway sold its convert|33|mi|km of track between Andalusia - River Falls - Georgiana to the
Three Notch Railroad onJune 11 2001 .ummary of operations
*
Louisville and Nashville Railroad : 1901 - 1982
*Seaboard System Railroad : 1982 - July 1, 1986
*CSX Corporation : July 1, 1986 - July 28, 1986
*Alabama and Florida Railroad: July 28, 1986 - November 23, 1992
*Alabama and Florida Railway: November 23, 1992 - PresentSources
*Edward A. Lewis, "American Shortline Railway Guide 5th ed.," (Kalmbach Books, 1996).
*Mike Walker, "SPV's Comprehensive Railroad Atlas of North America - Southern States" (Steam Powered Publishing & SPV, 2001) Ownership and detail of rail line.
*North America Railroad Map Software v 2.13, (Railway Station Productions, 2004) [http://www.RailroadMap.com]ee also
*
List of United States railroads
*List of Alabama railroads External links
* [http://www.pioneer-railcorp.com/Subsidiaries/AF/af.html Official A & F History]
Wikimedia Foundation. 2010.