Melo HVDC Back-to-back station

Melo HVDC Back-to-back station

The Melo HVDC Back-to-back station is the central part of the EHV-interconnection between Uruguay and Brazil, which is only possible by means of a frequency converter, as the frequency of the power grid in Uruguay is 50 Hz and that in Brazil is 60 Hz. The station, which is situated east of Melo, Uruguay, is interconnected by the San Carlos substation with a 283 kilometres long 500 kV line. It is capable of transferring 500 MW, and was built by AREVA in 31 months from 2009 to 2011.


From the Melo station a 128 kilometres long 525 kV powerline, of which 65 km are situated in Uruguay, runs to a newly built 525 kV/230 kV substation close to the Candiota power station, which contains some harmonic filters.[1]

See also

  • Rivera HVDC Back-to-back station

References


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Liste des installations de HVDC — Une liste des installations de HVDC dans le monde. Table Notes: B2B = Back to Back HVDC IGBT = Installation à base de transistor bipolaire à grille isolée Thury = A base des générateurs connecté en sérrie suivant les principes de René Thury Merc …   Wikipédia en Français

  • Liste der HGÜ-Anlagen — Die Hochspannungs Gleichstrom Übertragung (HGÜ) ist ein Verfahren zur Übertragung von elektrischer Energie mit Gleichstrom hoher Spannung (100–1000 kV). Im Folgenden findet sich eine Übersicht der realisierten Anlagen. Zu mehr Informationen… …   Deutsch Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”