- List of Caracas Metro stations
The
Caracas Metro (referred as "El Metro" by locals) is arapid transit system operating inCaracas , capital ofVenezuela .Below is a list of the Caracas Metro subway lines and the stations that they serve.
Line 1 (Orange)
From west to east:
*"Propatria"
*"Pérez Bonalde"
*"Plaza Sucre"
*"Gato Negro"
*"Agua Salud" - Future point of transfer to Line 6.
*"Caño Amarillo"
*"Capitolio" - Point of transfer to Line 2.
*"La Hoyada" - Future point of transfer to Line 3.
*"Parque Carabobo"
*"Bellas Artes"
*"Colegio de Ingenieros"
*"Plaza Venezuela" - Point of connection to Line 3 and Line 4.
*"Sabana Grande"
*"Chacaíto"
*"Chacao"
*"Altamira"
*"Parque del Este" - Future point of connection to Line 4.
*"Los Dos Caminos" - Future point of trasfer to Line 6.
*"Los Cortijos"
*"La California"
*"Petare"
*"Palo Verde"Line 2 (Green)
From north-east to south-west:
*"El Silencio" - Point of transfer to Line 1.
*"Capuchinos" - Point of connection to Line 4.
*"Maternidad" - Point of connection to Line 4.
*"Artigas" - Point of connection to Line 4.
*"La Paz" - Point of connection to Line 4.
*"La Yaguara" - Point of connection to Line 4.
*"Carapita" - Point of connection to Line 4.
*"Antímano" - Point of connection to Line 4.
*"Mamera" - Point of connection to Line 4.
*"Caricuao"
*"Zoológico"
*"Ruiz Pineda" - West ramification serviced exclusively by Line 4.
*"Las Adjuntas" - Serviced exclusively by Line 4, - transfer station to (Los Teques Metro ).Line 3 (Blue)
From north-east to south-west:
*"Plaza Venezuela" - Point of connection to Line 1 and Line 4.
*"Ciudad Universitaria"
*"Los Símbolos"
*"La Bandera"
*"El Valle"
*"Los Jardines" - expected completion and service by 2008.
*"Coche" - expected completion and service by 2008.
*"Mercado" - expected completion and service by 2008.
*"La Rinconada" - IAFE rail station, both completed and in service.Next phase (project). Begins as a west ramification from "El Valle station" to north on "San José station"
*"El Valle"
*"Prado de María"
*"El Peaje"
*"San Agustín"
*"Fuerzas Armadas" - Point of transfer to line Line 1 and Line 4
*"Urdaneta"
*"San José"Line 4 (Red)
Construction works for next phase were initiated 18 March 2007 and expected to be completed by year-end 2011. Please note Line 4 was renamed and incorporated as part of Line 2 shortly after its inauguration.
*"Capuchinos" - Point of connection to Line 2.
*"Teatros"
*"Nuevo Circo"
*"Parque Central"
*"Zona Rental" - Point of connection with Line 1 and Line 3.Next phase - From west to east:
*"Bello Monte"
*"Las Mercedes"
*"Tamanaco" - Future point of connection to Line 5.
*"Chuao"
*"Bello Campo"
*"Parque del Este II" - Point of connection to lines Line 1 and Line 6.Line 5 (Magenta)
This line is still under project.
From north to south:
*"Santa Ana"
*"Santa Paula"
*"San Luis"
*"Santa Marta"
*"Chuao"
*"Tamanaco" - Point of transfer to Line 4
*"San Román"
*"Santa Fe"
*"La Ciudadela"
*"Prados del Este"
*"La Iglesia"
*"Baruta"
*"La Trinidad"
*"La Boyera"
*"Los Geranios"
*"El Hatillo"Line 6 (Yellow)
Most of this line is still under project.
From west to east:
*"Magallanes"
*"Gato Negro"
*"Agua Salud" - Point of transfer to Line 1.
*"Miraflores"
*"Urdaneta" - Point of transfer to Line 3.
*"San Bernardino"
*"Guaicaipuro"
*"Maripérez"
*"Las Palmas"
*"Chapellín"
*"La Castellana"
*"Ávila"
*"Santa Eduvigis' - Point of transfer to lines Line 1 and Line 4"'The following stations found in the City of Caracas are in construction under a project known as
Guarenas / Guatire Metro .*"Parque del Este " - Point of transfer to lines Line 1 and Line 4
*"Montecristo" - Point of transfer to line Line 1
*"Boleíta"
*"Horizonte"
*"La Urbina Sur"
*"La Urbina Norte" - Point of transfer to the Light Rail Service, Guarenas-GuatireLos Teques Metro (Navy Blue)
*"Las Adjuntas" transfer station to Caracas Metro Line 4
*"Alí Primera" formerly "El Tambor" stationThe following stations are in construction
* "Guiacaipuro" - projected completion date set for 2010
* "Miranda" - projected completion date set for 2010
* "Los Cerritos" - projected completion date set for 2012
* "Carrizal" - projected completion date set for 2012
* "Las Minas" - projected completion date set for 2012
* "San Antonio" - projected completion date set for 2012Guarenas / Guatire Metro (Green Grass)
The following stations are in construction
*"La Urbina Norte" transfer point
*"Caucaugüita" - projected completion date set for 2012
*"Tamarinda" - future project
*"Guarenas I" - projected completion date set for 2012
*"Guarenas II" - projected completion date set for 2012
*"Guatire I" - projected completion date set for 2012
*"Guatire II" - projected completion date set for 2012External links
*es_icon [http://www.metrodecaracas.com.ve Metro de Caracas, C.A.]
* [http://www.urbanrail.net/am/cara/caracas.htm UrbanRail > America > Venezuela > Metro de Caracas]
Wikimedia Foundation. 2010.