New Energy Constanţa Wind Farm

New Energy Constanţa Wind Farm

Infobox_Power_Station
station_name=New Energy Constanţa Wind Farm


caption=
location=Constanţa, Constanţa County
owner=New Energy
status=Approved
fuel_type=Wind
mine_type=
conveyance=
cooling_water=
technology=
combined_cycle=
turbines=30
reciprocating_engines=
pumped_storage=
max_capacity= 30 MW
commissioned=
decommissioned=
extra=

The New Energy Dobrogea Wind Farm is an under construction wind power project in Constanţa County, Romania. It will have an 30 individual wind turbines [ [http://www.romanialibera.ro/a97815/nemtii-cred-in-potentialul-eolian-al-dobrogei.html German company to build wind farm in Constanţa County (Romanian)] ] with a nominal output of around 1 MW which will deliver up to 30 MW of power, enough to power over 18,000 homes, with a capital investment required of approximately US$60 million. The project started in 2003 and is expected to be completed in 2009.

References


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • List of wind farms in Romania — The Tihuţa Pass is situated at an altitude of 1,200 m (3,900 ft). As of 2008, there is an installed capacity of 76 megawatts (MW) of wind power in Romania, up from the seven MW installed capacity in 2007.[1] …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”