Denmark SEA system

Denmark SEA system

The SEA process in Denmark was established as far back as 1993 by an administrative order of the Prime Minister’s Office (Dalal-Clayton and Sadler, 2005). However, this requirement was not enshrined in law, but supported by a government circular which required an SEA to be carried out on “government proposals with major environmental effects” (Therival and Partidario, 1996, p25). The SEA process was limited only to government proposals and did not extend to plans and programmes. SEAs were required to focus on the impacts proposals would have on physical, ecological, cultural, health and risk factors. (Therival and Partidario, 1996). In 1995, the SEA requirement was extended to new parliamentary acts in addition to government proposals at the national level.

The administrative order broadly outlined four steps in the SEA process (Dalal-Clayton and Sadler, 2005, pp67-8):

1. Screening – using the checklist contained in the guidance (water, air, climate, surface of the earth, soil, flora and fauna, landscape, resources, waste, historical buildings, population health, safety and transport of harmful substances) proposals that were likely to have a significant environmental impact had to be identified.

2. Scoping – the cumulative effects of a bill or policy must be identified.

3. Assessment – analysis of the effects that have been identified as significant in the previous stages. Crucially the guidance states that it is not possible to give an overall description, thus a list of factors to be referenced are included in guidance

4. Report – a separate report of the environmental effects had to be included, attached to the bill that was to be put before parliament. The report has to be non-technical and easy to understand – it must also be made available to the public.

Current SEA System

Legal Framework

The SEA Directive (2001/42/EC) was integrated into the Danish planning system in 2004 (Elling, 2005). The SEA Directive now ensures that SEA has been extended to plans and programmes, rather than just government proposals. The Act on the Environmental Assessment of Plans and Programmes (Danish SEA Act) was passed into law in May 2004 and “is strictly in accordance with the requirements of the [2001/42/EC] directive” (Elling, 2005, p66).

The SEA Act allows the Minister for the Environment a certain amount of discretion (as the administrative order of 1993 did), with the Minister able to determine whether or not a private or publicly owned company is required to carry out a SEA on their plan or programme, when they are acting in the capacity of a public authority (for example, the provision of utilities) (Elling, 2005).

It is also important to note that the SEA Act can be overruled, as long as a plan or programme complies with the procedural and substantive requirements of the SEA Directive. This helps to avoid duplication with “land use plans that have been prepared in accordance with the [Danish] Planning Act” (Elling, 2005, p66).

Guidance Documents

Despite the integration of the SEA Directive, SEA guidance was restricted to a publication called Strategic Environmental Assessment of Bills and Other Proposals: Examples and Experience issued in 1995 by the Ministry for the Environment. New guidance was prepared in 2002, but never published due to a change in government (Dalal-Clayton and Sadler, 2005). The 1995 guidance issues a six step approach with regards to the type of information that should be included within an SEA
* Formulating the problem and describing the process of the proposal and the alternatives that have been considered
* Identifying the relevant environmental effects
* Describing the extent of the likely environmental effects
* Identifying mitigation measures and monitoring follow up programmes
* assessing and weighing the environmental effects in relation to policy objectives
* A statement with the summary of the main findings

Source: (Dalal-Clayton and Sadler, 2005; Danish Ministry for the Environment, 2008)

In 2006, The Environment Ministry released up to date guidance that related to the SEA requirements for plans and programmes dating from 2004. Instruction number 9664 entitled Vejledning om miljøvurdering af planer og programmer replaced the earlier guidance dating from 1995. The new guide was later supplemented, in 2007, by examples of SEAs that had been conducted. (DME, 2008 (2) (3)).

EA Steps Required

SEA steps that are required are defined by the SEA Act and supplemented by the guidance described in the last section.

The table below below sets out the specific SEA process as defined by 2006 and 2007 guidance from the Danish Ministry of the Environment (DME, 2008 (2) (3)). The process is broadly split into nine main stages:

Stage Danish English1 Screening Screening2 Scoping Scoping (includes consultation)3 Miljobeskyttelsesmal Legal Obligations for protection of the environment (national and international)4 Vurdering af konsekvenser og afbodning Prediction/Evaluation of consequences (of a plan or programme) on the environment5 Alernativer Alternatives/Mitigation6 Overvagning Other programmes (examples of)7 Miljorapport og formidling Environmental protection measures8 Sammenfattende redegorelse Summary and Explanation9 Organisering (af miljovurderingsarvejdet) Monitoring environmental effects

Examples of SEAs produced so far

Examples of Danish SEAs carried out following the introduction of the EU SEA Directive are “so far few” (Danish Ministry of Foreign Affairs, 2007). Below are some examples of SEA that have bee produced prior to the introduction of the EU SEA Directive.

North Jutland Regional Development Plan (1995-1997)

This was the very first SEA to be carried out in Denmark and was carried out before the introduction of the EU SEA Directive. As a result of this pilot SEA, the major concern amongst stakeholders was reconciling negative environmental impacts that resulted from planning activities. Overall, whilst stakeholders felt that no new knowledge was gained from carrying out an SEA, the planning process became more transparent. Politicians felt that there was more information on which they could make an informed decision about the choices presented to them. It was also decided that consultation should be carried out during the scoping process, rather than at later stages of the SEA process (Dalal-Clayton and Sadler, 2005; Jones et al, 2005).

Regional groundwater plan for Vejle County, Eastern Jutland (2002)

This SEA was carried out as a consequence of the regional planning process (which included the requirement for SEAs) and is notable for the alternatives suggested. Groundwater extraction takes places beneath polluted urban areas and two strategies were devised – ’cleaning up’ or extracting water from rural areas. The resulting analysis found there was no clear best solution and therefore other factors, such as economic considerations, should be taken into account to aid the decision making process. (Jones et al, 2005)

Regional mineral extraction plan for Vejle County (2003)

Extraction of minerals controlled under the plan were assessed under six criteria – transportation, economy, changes in landscape, landscape dynamics, pollution suffered by local residents and stress factors for local residents. This SEA clearly influenced the decision making process as the decision on the best alternative was deferred until suitable mitigation measures could be found (Jones et al, 2005).

trengths and Weaknesses of the SEA system

trengths

Before the implementation of the SEA Directive into the Danish planning system, there has been a long history of considering the environmental effects that the planning process may have. Therefore the transposition of the SEA Directive into Danish legislation conforms fully, and the supporting guidance (albeit late) ensures that SEAs conducted should be directive compliant. This historical approach has ensured that the SEA process has been institutionalised into the planning process. This ensures that environmental considerations are the subject of political debates and that parliamentary bills are prepared adequately with the SEA Directive and Danish SEA Act in mind.

The SEA process in Denmark is transparent and SEAs have a discernible influence upon the decision making process (Jones et al, 2005). There is a long tradition of public participation in the Danish planning system and this philosophy is no exception with regards to the SEA system. This is coupled with a feeling amongst planners and stakeholders, that despite the costs of SEA, overall it is a worthwhile and productive process.

Weaknesses

The major weakness in the Danish SEA system largely relates to government ministries – this is ironic given that they are responsible for the integration of the SEA Directive into Danish legislation. RECCEE (2005) argue that
* There is a lack of satisfactory scoping procedure when ministries prepare bills and conduct environmental assessments.
* There is an administrative failure of ministries in excluding negative effects and including only positive effects.
* Political adaptation of environmental assessments often takes place within ministries, sometimes with the result that information on the environmental impact of bills is not submitted to Parliament.
* Further consideration should be given to how the public could play a more attentive role in the SEA process to help overcome issues of stakeholder dominance and political short-sightedness.
* The development of SEA at the plan and programme level should be monitored to evaluate its contribution on the policy level and to identify how the practice on both levels could complement and stimulate each other.

Jones et al (2005) also argue that monitoring systems currently in place need to be strengthened. Currently monitoring of environmental impacts is done only through informal communication and Jones et al (2005) argue that the Minister for the Environment could issue specific rules.

Bibliography

* Dalal-Clayton and Sadler (2005), Strategic Environmental Assessment A Sourcebook and Reference Guide to International Experience, Earthscan, London
* Danish Ministry for the Environment (2008), Miljøvurdering af planer og programmer (SEA Legislation & Guidance), Retrieved from http://www.blst.dk/Planlaegning/Miljoekonsekvenser/MiljoevurderingPlaner/ on 18/03/08.
* Danish Ministry for the Environment (2008 (2)), Vejledning om miljøvurdering af planer og programmer, Retrieved from https://www.retsinformation.dk/Forms/R0710.aspx?id=12953 on 19/03/08.
* Danish Ministry for the Environment (2008 (3)), Eksempelsamling for miljøvurdering af planer og programmer September 2007, Retrieved from http://www.blst.dk/NR/rdonlyres/46372868-F4B7-4900-A743-063A553CB6E5/49265/Eksempelsamlingendeligudgave.pdf on 19/03/08
* Danish Ministry of Foreign Affairs (2007), Strategic Environmental Assessment, Retrieved from http://www.danidadevforum.um.dk/en/menu/Topics/EnvironmentalSustainability/ToolsAndReferences/Guidelines/StrategicEnvironmentalAssessment/ on 25/03/08.
* DIDC (2007), An introduction to Strategic Environmental Assessment (SEA) forDanish International Development Cooperation, Retrieved from http://sea.linddal.net/docs/seanote.pdf on 25/03/08.
* Elling (2005) cited in: Jones et al (2005), Strategic Environmental Assessment and Land Use Planning: An International Evaluation, Earthscan, London
* Jones et al (2005), Strategic Environmental Assessment and Land Use Planning: An International Evaluation, Earthscan, London
* Therival and Partidario (1996), The Practice of Strategic Environmental Assessment, Earthscan, London
* RECCEE (2005), Strategic Environmental Assessment at the Policy Level: Recent Progress, Current Status and Future Progress, Retrieved from http://www.unece.org/env/eia/documents/PolicySEA/SEA%20of%20Policies%20volume.pdf on 25/03/08


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Denmark — • History includes politics, religion, literary, and art Catholic Encyclopedia. Kevin Knight. 2006. Denmark     Denmark     † …   Catholic encyclopedia

  • Sea of Azov — at Novaya Yalta, Donetsk Oblast …   Wikipedia

  • DENMARK — DENMARK, kingdom in N.W. Europe. It was the first of the three Scandinavian countries where Jews were permitted to settle. The first arrivals were invited by King Christian IV, who, on Nov. 22, 1622, at the request of his Jewish mintmaster… …   Encyclopedia of Judaism

  • Denmark — /den mahrk/, n. a kingdom in N Europe, on the Jutland peninsula and adjacent islands. 5,268,775; 16,576 sq. mi. (42,930 sq. km). Cap.: Copenhagen. * * * Denmark Introduction Denmark Background: Once the seat of Viking raiders and later a major… …   Universalium

  • Denmark — This article is about the country. For other uses, see Denmark (disambiguation). Denmark Danmark …   Wikipedia

  • Denmark — <p></p> <p></p> Introduction ::Denmark <p></p> Background: <p></p> Once the seat of Viking raiders and later a major north European power, Denmark has evolved into a modern, prosperous nation that… …   The World Factbook

  • Denmark–United States relations — United States Denmark relations Denmark …   Wikipedia

  • Denmark–Netherlands relations — Danish Dutch relations Denmark …   Wikipedia

  • Strategic Environmental Assessment (Denmark) — The Strategic Environmental Assessment (SEA), is a process in Denmark for assessing the environmental effects of proposed government projects and programmes. Established in 1993 by an administrative order of Denmark s Prime Minister’s Office,[1]… …   Wikipedia

  • North Sea — For other uses, see North Sea (disambiguation). North Sea Location Atlantic Ocean Coordinates …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”