Holyrood Thermal Generating Station

Holyrood Thermal Generating Station

The Holyrood Thermal Electric Generating Station built by Newfoundland and Labrador Hydro Corporation is located near the community of Holyrood, in Conception Bay, Newfoundland, Canada.

The initial installation included two 150 megawatt (MW) turbine generators which are propelled by steam heated by two large oil burning furnaces. The Bunker 'C' oil used in the plant to keep the furnaces going is delivered by shuttle tankers to the marine terminal constructed as part of the project.

Newfoundland and Labrador Hydro's Holyrood Thermal Generating Station is an essential part of the province’s generating system. The plant burns No. 6 heavy fuel oil at the rate of approximately 6,000 barrels (1,000 m³) per day, per unit at full load to produce steam at 1000 degrees Fahrenheit (540 degrees Celsius) and 13,000 kPa at a rate of over 500 megagrams per hour.

In a thermal generating station, fuel is burned in a boiler to convert water to steam. The high-pressure steam is directed into a turbine that is connected to an electrical generator that produces electricity as it turns. A seawater condenser is used for cooling the spent steam from the turbine, converting it back to water that is reused in the boiler. Holyrood uses over 250,000 litres per minute of sea water for cooling on each unit and 900,000 litres per day of fresh water for make up purpose.

The plant generators operate at 16,000 volts and 7000 amperes transformed up to 230,000 volts for transmission on the island grid to all parts of the system. In a single year the plant has the capability of generating over 3000 GW·h which and can be up to 40 per cent of the island’s annual requirements.

Holyrood was placed in service in 1970 with two 150 MW units. A third 150 MW unit was added in 1980 to increase the output to 450 MW. In 1988/89 the original two units were modified to increase the plant capacity to 490 MW.


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Holyrood — The name Holyrood may refer to:cotland* Holyrood , a metonym for the Scottish Parliament, or the Scottish Parliament Building (because they are in the Holyrood district of Edinburgh) * Holyrood, Edinburgh, one of the areas of Edinburgh (partly… …   Wikipedia

  • Newfoundland and Labrador Hydro — Type Crown Corporation Industry Electricity generation distribution Founded St. John s, Newfoundland and Labrador (1954) …   Wikipedia

  • Lower Churchill Project — The Lower Churchill Project is a planned hydroelectric project in Labrador, Canada, to develop the remaining 35 per cent of the Churchill River that has not already been developed by the Churchill Falls Generating Station. The Lower Churchill s… …   Wikipedia

  • Danny Williams (politician) — The Honourable Danny Williams QC, MHA …   Wikipedia

  • Liste des centrales électriques au Canada — La centrale nucléaire de Bruce est la plus puissante au Canada. Cette page regroupe les plus importantes centrales électriques au Canada. Sommaire 1 …   Wikipédia en Français

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”