- Busan Subway Line 1
Infobox rail line
name = Busan Subway Line 1
type = passenger
start = Sinpyeong
end = Nopo-dong
stations = 34
open =July 19 ,1985
owner =Busan Transportation Corporation
operator =Busan Transportation Corporation
linelength = 32.5
gauge = RailGauge|sg
el = |Infobox Korean name
title = Busan Subway Line 1
color = #FF8C00
fontcolor = #FFFFFF
imgwidth = 120px
caption = Transfer Sign
rr = Busan Jihacheol ilhoseon
mr = Pusan Chihach'ŏl ilhosŏn
hangul = 부산 지하철 1호선
hanja = 釜山地下鐵 一號線Busan Subway Line 1 (1호선) is the north-south route of the
Busan Subway . It is, as of2005 , 32.5 km long with 34 stations. Line 1 uses 8-car trains, with 45 currently in total. There are no current plans to extend Line 1.Plans for this line were made in
1979 . Two years later, in1981 , construction began on the first phase, between Nopo-dong and Beomnaegol, which was finished in July1985 . This stretch was 16.2km long. Further extensions continued southward, with a 5.4 km extension from Beomnaegol to Jungang-dong opened in May1987 , a 4.5 km extension to Seodaesin-dong in February1990 , and a 6.4 km extension to Sinpyeong in June1994 . The total construction cost was 975.1 billion won.Hours of Operation
The hours of operation of Line 1 (as of
2005 ) start at 5:10 with the first trains leaving the terminal stations of Sinpyeong and Nopo-dong, and end with the last trains arriving in Sinpyeong at 00:39 and Nopo-dong at 00:35. A ride through the entire line takes about 1 hour 10 minutes.List of Stations
Wikimedia Foundation. 2010.