Basque Y is the name given to the
AVE (Spanishhigh speed train ) network being built between the three cities of the Basque Country Autonomous Community,Bilbao ,Vitoria-Gasteiz andSan Sebastián ,Spain .Characteristics
It will transport cargo and passengers.The cargo trains will go until the
Port of Bilbao and thePort of Pasaia .It will consist of 157 kilometers of double track and 37 with a single track.Due to the mountainous relief of the region, 105,9 km (62%) will be in 80tunnel s and 10% in 71 bridges.The minimum speed is 90 km/h, the maximum on, 230 km/h.It will reach Madrid through
Valladolid and the FrenchSNCF throughIrun .While the French high-speedTGV is not planned to touchHendaye until 2020, the Hendaye-Bordeaux track allows 200 km/h.The network will also include a connection to theNavarrese Corridor , thehigh speed train line projected betweenZaragoza and the capital ofNavarre ,Pamplona .An agreement on 25 April 2006 puts the section between Vitoria and Bilbao under Spanish control (through
Adif ), and the section inGuipuscoa province under Basque control. [cite web| url=http://www.eitb24.com/portal/eitb24/noticia/en/business/basque-y-basque-and-spanish-governments-sign-y-railway-project-ag?itemId=D27210&cl=%2Feitb24%2Feconomia&idioma=en| title=Basque and Spanish Governments sign Y Railway Project agreement| work=eitb24| year=2006-04-25 | accessdate=2006-04-27| ] It will be the costliest investment in the Basque country.The Spanish and the Basque Governments will pay 4,000 million euros.The works started in 2006 and are projected to end in2013 -2015.Travel time comparisons
It will take well under one hour to connect the cities while the current slower network takes from 1 h 40 min to 2.5 hours.
tations
*
Bilbao-Abando
*Vitoria-Dato
*Irún
*San Sebastián-Norte
*Ezkio-Itsaso
*Euba Preparation
It took 15 years from the first proposals of a Basque high-speed network to the detailed project.The disagreements between the series of Spanish and Basque governments and who would bear the costs were the main issues.Through the Basque tax agreement (
Concierto ) the Spanish government will pay the advanced payment by the Basque government.Benefits
It will ease mobility between the Basque capitals, in fact, travel times between
Bilbao ,San Sebastian andVitoria will be cut in half. In addition, the Basque government is improving the existingEuskoTren infrastructure betweenBilbao andSan Sebastian , enabling a better connection between smaller towns and big cities.The cargo traffic will remove lorries from the roads, the railway will connect the
Port of Bilbao withEurope 's major railway lines. The Basque Y will be the first railway line built with the samerail gauge ofEurope 1435mm.To reduce the
environmental impact , the layout avoids the natural areas ofAizkorri ,Urkiola andAralar . The increase on the usage of railway, will reduce the usage of planes, more polluting than trains. In addition it will be more affordable than traveling by plane, and taking passengers to the very centre of cities, instead of the outskirts, where airports are usually located.Criticism
It is not clear how important is the connection to France for the European Union.
The official
Y -shaped layout has been approved by theBasque Parliament , but criticised byEzker Batua-Berdeak , a coalition of the Basque branch of United Left and ecologists, part of theBasque Government .EB proposes anU -shaped layout" [http://www.ezkerbatua-berdeak.org/javier-madrazo/articulos-de-opinion/-el-tav-ezker-batua-y-la-transversalidad-/menu-id-444 El TAV, Ezker Batua y la transversalidad] ",Javier Madrazo , 10 November 2007.] " [http://www.ezkerbatua-berdeak.org/noticias/euskadi/eb-califica-de-ecologistas-de-pacotilla-y-gamberros-de-patio-a-quienes-han-puesto-silicona-en-la-cerradura-de-la-sede-de-bilbao/menu-id-101 EB califica de "ecologistas de pacotilla" y "gamberros de patio" a quienes han puesto silicona en la cerradura de la sede de Bilbao] ", 28 December 2007.] .It has also been criticised by leftist Basque nationalists and ecologists.The Basque armed group
ETA has the works as one of its targets" [http://www.diariovasco.com/20071104/politica/convierte-obras-tren-alta-20071104.html ETA convierte las obras del Tren de Alta Velocidad en un objetivo estratégico] ", Óscar B. de Otálora,El Diario Vasco , 4th November 2007.] , but has not attacked them yet.A demonstration against the train gathered thousands to
Mondragón in December 2007.References
External links
* [http://www.euskalyvasca.com/en/home.html Official website of the project.]
* [http://www.garraioak.ejgv.euskadi.net/r41-430/eu/contenidos/informacion/4429/eu_4081/eu_15726.html Information about the project on the Basque Governments Transportation department.]
* [http://www.youtube.com/watch?v=5mm6KbRX2eY Advertisement promoting the Basque Y.]
* [http://www.4shared.com/file/2103118/739c8101/NRFPV_-_1_de_2.html PDF plans of the Basque Y project.]
* [http://www.4shared.com/file/2103117/e3239c90/NRFPV_-_2_de_2.html PDF plans of the Basque Y project.]
* [http://www.sindominio.net/ahtez/ AHT Ez] . Basque opposition to high-speed trains.
Wikimedia Foundation. 2010.