- Tramlink route 4
Infobox London Tram
number=Route 4
operator=Tramtrack Croydon /First Group
length=
time=
garage=Therapia Lane
start=Crystal Palace
end=West Croydon
level=Daily (six trams per hour)
frequency=About every 8 minutes (proposed)Tramlink route 4 is a proposed tram route which will be operated as part of the
Tramlink network in south London. The route will be operated byTramtrack Croydon andFirst Group on behalf ofTransport for London (TfL).Background
This is currently the only extension being developed. The proposed routes link Harrington Road stop with Crystal Palace, and Crystal Palace directly with Beckenham Junction, both terminating at Crystal Palace Parade. There are three options on how to get to the Parade: on-street, off-street and a mixture of the two. Following recent consultation the off-street option is favoured, with trams running along existing railway as far as Crystal Palace Station, and then running round the western edge of Crystal Palace Park (within the current park's perimeter) to the bus terminus near the parade. [ [http://www.tfl.gov.uk/corporate/projectsandschemes/networkandservices/croydontramlink/2061.aspx Consultation on hybrid scheme for Croydon Tramlink] "Transport for London"]
Current Route
References
External links
* [http://www.tfl.gov.uk/trams Official London Trams Website]
* [http://www.croydon-tramlink.co.uk Croydon Tramlink - The Unofficial Site]
* [http://www.tfl.gov.uk/corporate/projectsandschemes/networkandservices/2055.aspx Croydon Tramlink Crystal Palace extention]
* [http://www.tfl.gov.uk/assets/downloads/Crystal-Palace-2006-10-19.pdf Proposed route]
Wikimedia Foundation. 2010.