Floreasca City Center

Floreasca City Center

Infobox Skyscraper
building_name =Floreasca City Center


caption =
year_highest =
year_end =
plural =
location =Bucharest, Romania
coordinates =
status =Under construction
groundbreaking =2007
constructed =
est-completion =
opening =2010
demolished =
destroyed =
use =
antenna_spire =
roof =131 m
top_floor =
floor_count =37
elevator_count =
cost = US$ 250.000.000
floor_area =214.000 sqm
architect =
engineer =
contractor =
developer =
owner =Raiffeisen evolution

Floreasca City Center is a multifunctional centre with a shopping and entertainment complex as well as two office buildings in Bucharest. Floreasca City Center consists of a centre for shopping, entertainment and business. The gross area amounts to approx. 214.000 m² with rentable area of approx. 120.000 m² and more than 2.000 parking places.

The project is constructed in stages:

Construction stage I

Promenada mall

The shopping and entertainment centre has a gross floor area of approx. 110,000 m² and is divided into 3 basement floors with approx. 1,300 parking spaces and 3 upper floors with sales areas (ground floor and 1st upper floor) as well as a food court and a cinema centre in the 2nd upper floor.

Construction stage II

Office Wing

The Office Wing, an office building with 7 floors and a polygonal ground plan (gross floor area approx. 26,000 m²) floats above the shopping mall. This structure features a transparent light glass façade. In the floor connecting the structure with the mall, there is a fitness centre which has a direct exit to the generous open space on the roof of the shopping mall.

Construction stage III

kyTower

The second office building is designed as a high-rise building with a height of 131 m. With 37 upper floors and 5 basement floors (gross floor area approx. 78,000 m²), this Tower will be the highest building in Bucharest. A restaurant and conference rooms are situated in the two uppermost floors. The façade of the Tower has an oblong structure over 4 floors with transparent, translucent and opaque areas. In the uppermost floors the façade opens up and becomes entirely transparent

External links

* [http://www.raiffeisenevolution.com/projekt.php?projektid=30378&language=en/ Official site]
* [http://www.floreascacity.ro/ Presentation site]
* [http://raiffeisenevolution.ro:81/cgi-usr/nph-image/ Live webcam - North - General]
* [http://raiffeisenevolution.ro:82/cgi-usr/nph-image/ Live webcam - South - Tower]


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • City Gate Towers — Turnurile Porţile Oraşului General information Status Complete …   Wikipedia

  • Dâmbovița Center — Casa Radio Another view of the unfinished Casa Radio …   Wikipedia

  • Millennium Business Center — General information Status Complete Location Bucharest, Rom …   Wikipedia

  • Orhideea Business Center — General information Status Proposed Location Bucharest, Romania Construction started 2009 Opening 2012 …   Wikipedia

  • Nusco Tower — General information Status Complete Location Bucharest, Romania Construction started 2008 Opening 2010 …   Wikipedia

  • Charles de Gaulle Plaza — General information Status Complete …   Wikipedia

  • Colosseum Tower Bucharest — Colosseum Tower General information Status Approved Location Bucharest, Romania Construction started 2009 Opening 2011 …   Wikipedia

  • Niro Hotel Tower — General information Status Approved Location Bucharest, Romania Construction started 2009 Opening 2011 …   Wikipedia

  • Olympic Tower Bucharest — Olympic Tower General information Status Proposed Location Bucharest, Romania Cost US$ 180 million Height …   Wikipedia

  • Chamber of Commerce and Industry of Romania building — General information Status Complete Location …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”