The Schooner Bayou Control Structure is a flood control structure located in Vermilion Parish, Louisiana, and operated by the U.S. Army Corps of Engineers. It is part of the Mississippi Valley Division, New Orleans District, which encompasses the southern half of the state of Louisiana.

General Information

It is located in the enlarged White Lake to Vermilion Bay channel opposite the abandoned Schooner Bayou Lock and approximately five miles southwest of Intracoastal City. The structure is accessible only by boat.

The structure is a feature of the Mermentau River and Tributaries, Louisiana, project, authorized by the Flood Control Act of 18 August 1941, as modified by the Rivers and Harbors Act of 24 July 1946.

The purpose of the structure is to aid in preventing saltwater intrusion into the Mermentau River Basin where it would interfere with irrigation of rice lands. It also aids in the prompt and efficient release of floodwaters that may occur within the basin. The structure is operated in conjunction with Calcasieu and Leland Bowman Locks on the Gulf Intracoastal Waterway (GIWW), Catfish Point Control Structure on the Mermentau River, and Freshwater Bayou Lock on the south side of the basin, all of which help prevent salt water intrusion into the Mermentau River Basin.

The structure was constructed under contract with Keller Construction Corporation. Work was started on 8 August. 1949 and was completed on 22 May 1951 at a cost of $672,829.18. There were no known problems encountered during construction on either contract.

The Schooner Bayou Control Structure consists of two 75-foot wide reinforced concrete gatebays, side-by-side, each equipped with a pair of 60-degree steel sector gates. The sill elevation of both gatebays is -12.0 with sidewalls extending to elevation 6.0. The gate structures are joined at the center of the channel and offset to each other so that adjacent gate recesses overlap. Timber guidewalls are provided on both approaches to the gatebays. The structure is protected from flanking flow by earth dikes constructed on both sides of the structure. The old Schooner Bayou Lock was closed by a dike, and a new channel was provided from White Lake through the new Schooner Bayou Control Structure to the GIWW.

During high water the gates will be opened to permit passage of any vessel that can navigate against the current which can attain velocities of up to 15 knots. Vessels coming from East or West can bypass the floodgates by going through North Prong-Schooner Bayou into the Intracoastal Waterway SE of Forked Island at Mile Marker 167.

Hydrologic Data

Hydrologic data is collected daily consisting of pool levels, salinity readings, tide readings, water temperature, rainfall, etc., and is posted onto public websites.These websites can be accessed at:
* [http://www.mvn.usace.army.mil/od/lockupdates/lockstatus.asp?lockid=21 Schooner Bayou Control Str. Status Report] Contains Pool level, salinity, rainfall, and operational status.
* [http://www.mvn.usace.army.mil/od/lockupdates/mermentaubasin/displayindex.asp Mermentau Area Hydrologic data]
* [http://www.mvn.usace.army.mil/ops/sms/verm.asp Mermentau Basin Salinity Monitoring site]
* [http://www2.mvr.usace.army.mil/WaterControl/new/layout.cfm RiverGauges.com] Get stage data for anywhere in the Mississippi River Valley.

Hurricane Rita

Hurricane Rita made landfall between Sabine Pass, Texas, and Johnson Bayou, Louisiana, at 02:38 CDT (07:38 UTC) on September 24, 2005 as a category 3 Hurricane with winds at 115 mph. Winds in Eastern Vermilion Parish were at strong tropical force/ weak hurricane force causing minimal wind damage to Schooner Bayou Control Structure. But the resulting storm surge later that morning rose to a level of 10.5 feet above Mean Low Gulf (MLG), overtopping the concrete structure by 4.5 feet. Saltwater damage to the structure machinery and electrical system occurred, requiring extensive repairs. The structure was returned to operational status in approximately 30 days. The main office building, which sits 9 feet above MLG, required remodeling in the entire first floor after receiving 1.5 feet of water inside the building.

Employees returning to the site the morning after landfall found that the water level had already dropped to 6.5 feet above MLG as the surge waters flowed back out to sea. The gates were opened using hand cranks and backup generators to allow the flood waters to drain. The remainder of the flood waters required approximately 2 months to drain from White Lake and the Mermentau River Basin.

External links

*
* Gulf Intracoastal Waterway
* [http://www.mvn.usace.army.mil New Orleans District, USACE]
* [http://www.mvd.usace.army.mil Mississippi Valley Division, USACE]
* [http://www.usace.army.mil U.S. Army Corps of Engineers]

References

*. Story on the effects of Hurricane Rita.


Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • Mermentau River — Map of the Mermentau River watershed showing the Mermantau River and its 4 largest tributaries (from left to right) Bayou Nezpique, Bayou des Cannes, Bayou Plaquemine Brule, and Bayou Queue de Tortue. The Mermentau River is a 72.3 mile long… …   Wikipedia

  • Disasters — ▪ 2009 Introduction Aviation       January 23, Poland. A Spanish built CASA transport plane carrying members of the Polish air force home from a conference on flight safety in Warsaw crashes near the town of Miroslawiec; all 20 aboard are killed …   Universalium

  • Submarine — For other uses, see Submarine (disambiguation). A Japan Maritime Self Defense Force Oyashio class submarine in 2006 A submarine is a watercraft capable of independent operation below the surface of the water. It differs from a submersible, which… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”