Highgate Wood is a suburb in North London that was chosen as the site of a trial for an electronic telephone exchange built by members from Joint Electronic Research Council (JERC), which was formed in 1956 and consisted of the British Post Office GPO, Siemens Brothers & Co. Ltd. (soon to be part of Associated Electrical Industries Ltd) AEI, Automatic Telephone & Electric Co. Ltd AT&E (soon to be part of Plessey). see [http://web.ukonline.co.uk/freshwater/histatm.htm] , The British Ericsson Telephones Ltd., General Electric Co.GEC , and Standard Telephones & Cables Ltd.STC .Introduction
On Wednesday, 12 December, 1962, the 800 line Highgate Wood exchange was accepted by the Postmaster General, Mr. Reginald Bevins, MP, on behalf of the Post Office, from the five manufacturers who had helped to build it, the first all-electronic telephone exchange in Britain and one of the first in the world to go into public service. It had already carried public traffic experimentally for brief periods during the previous few weeks. He also announced on that day the building of three more advanced electronic exchanges to be installed and in operation within the next two years at
Goring-on-Thames (high speed TDM 100 channel),Pembury (Low speed TDM 30 channel), and atLeighton Buzzard . The only one that was completed was theTXE 1 at Leighton Buzzard, the other two being quickly abandoned.The Highgate Wood Electronic Exchange had been the result of six years co-operative research and development between the Post Office and five principal British manufacturers of exchange equipment (JERC). Although different contractors had been responsible for the system design, installation and manufacturing of various sections of the exchange, the commissioning had been the work of teams drawn from each of the parties to the Agreement. The Highgate Wood Exchange was not entirely typical of the systems which were to follow it. Each of the three new exchanges, all of which were to operate completely on their own, with no stand-by exchange as was the case at Highgate Wood, were to be designed to try out actual service conditions. Two of them were based on slightly different applications of the time-division pulse-amplitude modulation
TDM principle, and the third, at Leighton Buzzard, on space-division switching. All three were to be fully transistorised so that they were going be more compact than Highgate Wood (which had about 5000 transistors and 500 valves) and would have needed less power. They were also expected to show a significant improvement in reliability that had been a problem at Highgate Wood. The model of Highgate Wood had worked well in the laboratory but the analogue transmission was too noisy on the long cable runs in an actual exchange. The problem was thought to be the earthing arrangements. TDM exchange operation in the UK did not become possible untilPCM came along, providing a digital transmission solution which led to System X.Exchange Design
One of the JERC's first decisions was to build an electronic exchange using the "Switched Highways" system, which employed time division multiplex techniques (TDM), while at the same time continuing research on alternative solutions to the problem of electronic switching. The "Switched Highways" system was invented by L.R.F Harris at Dollis Hill in 1952. It was also decided that the experimental equipment should provide the full service and maintenance facilities of a comparable electro-mechanical exchange. At the same time the techniques used had to be demonstrably capable of serving the largest existing exchanges. Moreover, the experiment was to be conducted in an exchange giving public service and therefore fully interconnected with the public network. This meant that it would need conversion equipment to enable it to inter-work with the existing system and to use the existing subscribers' apparatus and line plant. For these reasons the Highgate Wood installation was bigger than the small number of lines would have seemed to warrant and about 400,000 electronic components were fitted. Much of the control equipment could have served an exchange of about 7,000 lines. The exchange used both valves and transistors. There were approximately 5000 transistors and 500 valves. The valves were used in the more crucial areas, as the transistors of the day were not up to the required performance.
witching and Trunking
The most novel part of the conception of the exchange design was the use of time division multiplex techniques for the transmission of up to 100 conversations over a common channel, which was well ahead of its time. This technique would eventually be used in
System X and other digital exchanges as technology caught up. Another interesting feature of the installation was the use of time-sharing in the setting-up of the calls and in their control, which was something that all subsequent digital exchange design would follow.At the time in
Strowger exchanges ranks of selectors were interconnected by means of a complex trunking system dictated by the method of setting up the calls and by the need to economise in the total number of switching points. The trunking of the Switched Highways system was simple because each switch could carry 100 simultaneous conversations, the lines were concentrated into large groups before being connected to the switches; and the calls were set up by a high speed common control apparatus operating quickly enough to deal with the calls on a "one at a time" basis.In the trunking of Highgate Wood the system, the lines (subscribers) and junctions were arranged in groups, the size of each group depending on the traffic. There were up to 800 lines in a group. Each group was connected to a "highway" over which 100 multiplexed conversations could be carried, each conversation using a one-microsecond time slot or channel time at a repetition frequency of l0 kHz. The "highways" were fully interconnected by electronic switches or gates and gates also connected the "highways" to the common control. Each line in the electronic system was provided with gates, which enable it to be connected to its "highway".
canning
To set up a call the line gates and the "highway" switch gates were set so that for the duration of the call they would open at the channel time allotted to the conversation. The gates connecting the lines to the "highways" would, of course, be closed at all other times but the inter-highway gates, which might be switching many calls, would operate at the pulse channel times of all the conversations in progress on their "highways". Delay line stores controlled all the gates.
Common Control
The high speeds of electronic equipment allowed the use of a single common control to deal with even the largest and most heavily loaded exchange and made possible the use of the "one at a time" principle in the setting up of connections. The control contained "logical" elements which controlled the sequences, and "memory" elements to store information relating to the switches and calls and permanent and semi-permanent information relating to the lines. These were basic requirements in any type of telephone exchange. In electromechanical exchanges the call memories are spread over the equipment in the form of mechanical spring sets and operated relays while the line information is stored in the form of jumpers on the IDF.
The first task of the electronic control was to detect when a new call arrived. For this purpose each subscriber's line termination was examined for a period of 280 microseconds every 224 milliseconds, a process known as scanning. Junctions were scanned at eight times this rate. The scanning was carried out by a
magnetic drum , each track of which is divided into 100 sections or words, one for each line. Parallel tracks were used for each 100 lines, one track providing the permanent (IDF) information (that is, directory number and class of service), another track gave a semi-permanent information (that is, whether the line was already engaged or parked because of PG conditions). Since the tracks are switched in sequence the information relating to each line could be read sequentially as the drum rotated, the angular position of the word together with the track number defining the equipment position that is, the line apparatus number of the line being scanned. The groups of 800 lines (junctions and subscribers) at Highgate Wood were divided into eight sub-groups, one sub-group for each track of the drum. In each sub-group the line units was arranged in ten columns often rows so that any line position could be defined by a ZXY code, Z for the sub-group, X for the column and Y for the rows.To avoid the use of a separate delay line store for every line termination it was convenient to use, in each group of 800 lines, three sets of five stores coded to correspond with the ZXY designation of the line. As the drum rotated it generated waveforms corresponding to the ZXY code of the line whose information was available at that time. These waveforms indicated the appropriate delay lines and if a call was to be set up a selected pulse was injected into the selected delay lines which caused them to open the line gates repeatedly at the selected pulse time, the pulse continuing to circulate until the connection was cleared.
The common control of the system was divided into two parts. The first was the equipment to store and process the information relating to the setting up and the progress of the calls (the stores used in this part of the equipment were 900 microsecond magnetostriction delay lines). The second was the permanent memory containing the translators and so on, which used the magnetic drum store. In addition, various services, such as the waveform generator and the "clock pulse" generator used to time the system, were provided.
During the progress of a call the setting-up apparatus first connected the caller to a register equipment and later connected the caller to their correspondent by way of the "highway" switch, a channel selector choosing a free channel suitable for the call, that was, one available to both subscribers.
The register equipment received the dialled digits and could process and store 100 nine digit numbers. This capacity was not fully exploited at Highgate Wood although the register and most of the control equipment was potentially capable of dealing with the traffic from a large metropolitan exchange.
upervisory
The supervisory equipment monitored the set-up connections and, in addition, controlled the application of tones (for example, dial tone), and applied ringing, metering, and release conditions. It monitored the lines by scanning the "highways" successively, examining each pulse channel for a period of one microsecond. In this period the state of the call was registered and, depending on the stage reached by the call and the class of service of the lines concerned, the logical circuits in the equipment decide on the action to be taken, that was, whether ringing should be applied or cut-off or whether the call should be released. Both the register and the supervisory equipment had "persistence timers" which, in effect, substituted the B and C relays and the S and Z pulses of the Strowger system. These timers were also provided on a common basis.
The system provided for four-wire transmission, within the exchange, it was continuously self-routined and all common equipment was duplicated, the spare equipment being switched-in automatically if the routiners detected faults on the worker. The equipment was experimental and experimental verification of the various equipment practices and maintenance aids was perhaps the most important feature of the field trial.
Interworking
The exchange had been designed to work as a director exchange in the existing director network, and no attempt had been made to introduce new service facilities. This meant that conversion equipment had to be interpolated between the electronic exchange and the outside world and the exchange had to be adapted to suit subscribers' apparatus and designed to work with mechanical equipment.
The Proposed Future
Since 1st September 1962, the exchange had been subjected to a series of traffic trials and had since been intermittently in public service. It was formally handed over on 12 December 1962, and was undergoing maintenance trials under live traffic conditions. Since this was one of the prime objects of the experiment it was to be expected that from time to time the exchange would be taken out of service in order to introduce changes or try further experiments. For these reason the existing electromechanical exchange had been retained.
The development of electronic exchanges was a vital importance to the British telephone industry at the time, which exported almost half of its production output. The success of Highgate Wood and of the second generation of electronic exchanges would influence the reactions of telephone system managements all over the world. Many overseas buyers of exchange equipment at the time followed the lead of the British Post Office and it was hoped that this would continue but is was not to be the case.
As far as is known the exchange was only used as a test bed and never went into long-term public service. It is not known what happened to the equipment but presumably it was scrapped.
References
An article by of unknown origin which was the source of much of this information by Mr. S. W. Broadhurst, it is suspected that it may have come from the Post Office Electrical Engineers Journal from around 1963.
Professor J. E. Flood for further information on Highgate Wood.
To find the source of any picture, double click the actual picture.
Wikimedia Foundation. 2010.