- USS S-3 (SS-107)
USS "S-3" (SS-107) was the prototype of the "Government-type" "S"-class submarines of the
United States Navy . ("S-1" (SS-105) was the "Holland-type" prototype and "S-2" (SS-106) was the "Lake-type".) Her keel was laid down on 29 August 1917 by thePortsmouth Navy Yard . She was launched on 21 December 1918 sponsored by Mrs. William L. Hill, and commissioned on 30 January 1919 with Commander John W. Lewis in command.Following outfitting and trials, "S-3" began her career with training operations along the
New England coast operating out of Portsmouth andNew London, Connecticut . In 1920, she twice visitedHavana, Cuba , first in January, and again in December.In July 1921, she was attached to SubDiv 12 which, along with SubDiv 18, was to rendezvous off Portsmouth for the longest voyage on record, at that time, for American submarines. The two divisions were assigned to the
Asiatic Fleet as SubFlot 3 at theCavite Naval Station in thePhilippine Islands . They sailed via thePanama Canal toPearl Harbor where "S-3" was detached and reassigned to operate on the West Coast fromMare Island, California . The two divisions continued on and successfully completed the voyage, arriving at Cavite on 1 December."S-3" departed Pearl Harbor on 9 November and sailed to the West Coast where she operated until mid-July 1923. On 17 July, she took departure from
San Francisco Bay to retransit the Panama Canal en route to New London.Reaching New London on 5 September, she was attached to SubDiv 2, Atlantic Fleet, and assigned experimental duty at the Submarine School at New London, assuming the duties of "S-1" (SS-105), flagship of SubDiv 2, which was conducting special experiments with aircraft. During the remainder of 1923 and the years following, into 1927, she ranged the East Coast conducting training operations and evaluating new techniques in submarine development.
In July 1927, "S-3" and "S-1" formed SubDiv 4 and began a schedule which included operational cruises to the Panama Canal Zone in the spring months of 1928, 1929, and 1930. The remaining months of those years were spent in operations along the New England coast.
Early in 1931, "S-3" was ordered to
Philadelphia, Pennsylvania , for inactivation. She was decommissioned there on 24 March and laid up. She was struck from theNaval Vessel Register on 25 January 1937 and subsequently scrapped.References
Wikimedia Foundation. 2010.