- USS S-1 (SS-105)
USS "S-1" (SS-105) was the lead boat of the S class of
submarine s of theUnited States Navy . The Navy had awarded contracts for the first three S-boats under the same general specifications but of different design types. "S-1" was what was known as a "Holland-type," while USS|S-2|SS-106|2 was a "Lake-type" and USS|S-3|SS-107|2 a "Government-type.""S-1"’s prime contactor, the
Electric Boat Company, subcontracted her construction to theFore River Shipbuilding Company of Quincy,Massachusetts . Her keel was laid down on 11 December 1917. She was launched on 26 October 1918 sponsored by Mrs. Emory S. Land, and commissioned on 5 June 1920, with Lieutenant Commander Thomas G. Berrien in command."S-1" began her service operations in July 1920 with a cruise to
Bermuda attached to Submarine Division 2, with subsequent operations out ofNew London, Connecticut , cruising theNew England coast until 1923.On 2 January 1923, she shifted to SubDiv Zero, a division created for experimental work, and conducted winter maneuvers in the
Caribbean Sea . As a single ship division, SubDiv Zero, she returned to New London in the spring to continue experimental duty.As part of a series of studies conducted by the
United States Navy afterWorld War I into the possibility of submarine borne observation and scouting aircraft, "S-1" became the experimental platform for this project late in 1923. She was altered by having a steel capsule mounted abaft the conning tower; a cylindrical pod which could house a small collapsible seaplane, theMartin MS-1 . After surfacing, this plane could be rolled out, quickly assembled, and launched by ballasting the sub until the deck was awash. These experiments were carried out into 1926 using the Martin-built plane, constructed of wood and fabric, and the all-metal Cox-Klemin versions, XS-1 and XS-2. The first full cycle of surfacing, assembly, launching, retrieving, disassembly, and submergence took place on 28 July 1926, on the Thames River at New London.Following the aircraft experiments, "S-1" served as flagship for SubDiv 2 until July 1927, when she was transferred to SubDiv 4. While attached to this division, she made operational cruises to the
Panama Canal Zone in 1928, 1929, and 1930, during the spring months. She visited ports atCristobal, Canal Zone andCoco Solo, Canal Zone ;Cartagena, Colombia ;Kingston, Jamaica ; and Guantanamo Bay,Cuba , during these cruises, and spent the remaining months of those years operating along the New England coast, out of New London.January 1931 found her at
Pearl Harbor . She remained there into 1937; first, attached to SubDiv 7, SubRon 4, then, from July 1932 to July 1933, attached to Rotating Reserve SubDiv 14. She was returned to SubDiv 7 in August 1933 and remained with that division until departing in May 1937 for Philadelphia. "S-1" arrived at Philadelphia on 22 July and commenced overhaul for deactivation. She was decommissioned on 20 October.On 16 October 1940, "S-1" was recommissioned at
Philadelphia, Pennsylvania . She then made two cruises toBermuda , training submariners, and returned to Philadelphia from the second cruise on 7 December 1941. There, she prepared for transfer to theUnited Kingdom under theLend-Lease program. She was decommissioned and turned over to the British on 20 April 1942. Her name was struck from the Navy list on 24 June 1942."S-1" served the
Royal Navy asHMS P.552 as a training vessel for anti-submarine warefare. In poor condition, after arriving in Durban, she was often in repair and she was declared unseaworthy in January.1944 [ [http://uboat.net/allies/warships/ship/3659.html uboat.net - Allied Warships - Submarine HMS P 552 of the S-1 class ] ]She was returned to the
United States Navy 's custody on 16 October 1944, atDurban , Natal,Union of South Africa , where she was stripped of vital parts and machinery, and her hull was sold for local scrapping on 20 July 1945 and she was scrapped there on 14 September of that year.References
*DANFS|http://www.history.navy.mil/danfs/s1/s-1.htm
Wikimedia Foundation. 2010.