- Podilsko-Voskresenska Line
The Podilsko-Voskresenska Line ( _uk. Подільсько-Воскресенська лінія) will be the newest addition to
Kiev 's metro system. Presently under construction, when finished, it will contain 16 stations and be approximately 20 kilometers long. This line will serve as an important relief for existing and over-stretched transfer points. The first segment is due to open between 2010 and 2015, with the project being fully completed by 2025.Like most Kiev Metro lines, it will open in a set of stages. The first is planned to be a three-station deep-level segment which will run from the existing "Vokzalna" station of the
Sviatoshynsko-Brovarska Line northwards to Hlybochytska, which will be a transfer to the Lukianivska station on theSyretsko-Pecherska Line . The second segment will then continue eastwards to thePodil region of Kiev, across theDnieper River on a combined automobile bridge throughTrukhaniv Island , and into the northern left-bank districts. Most of the second segment's stations will be shallow-level or elevated. The line is also known as Podolsko-Voskresenskaya ( _ru. Подольско-Воскресенская).Even though the Vokzalna-Hlybochytska segment is planned to open first, it is also likely that the first stage segments described above will open in the opposite order. This is because at present the new bridge, currently under construction, is of top importance to relieve automobile congestion. However, in doing so, the already laiden Kurenivsky radius of the
Kurenivsko-Chervonoarmiyska Line , on which carries the passengers from theObolon district, will now add those travelling to and fromTroyeshchyna . The two districts are largest in Kiev and there are serious concerns about the older line being able to handle the new increase in the passenger load, thus it is more likely that the whole first stage will open simultaneously.The first stage will be followed by two subsequent extensions. The first one will be the Voskresenky radius to the southwest, with five stations. It will continue the line from the Railway station through the
Solomianskyi Raion all the way across toKiev-Zhulyany Airport and the residential districts on the circular highway. The northeastern extension is slightly more complex, as the line will split. The first branch will continue east with two stations to Bratislavska, parallel with the existing Sviatoshynsko-Brovarska Line. The second, northern branch will annex the whole of Kiev fast tram's #2 route, converted it to Metro standards. It is expected that the branch system will be in operation until the futureLivoberezhna Line will take the northern branch off the Podilsko-Voskresenska in mid 2030s. [http://www.urbanrail.net/eu/kie/kyiv-metro-projects.gif]References
ee also
*
List of Kiev Metro stations
Wikimedia Foundation. 2010.