- Kentucky Route 15
Infobox road
state=KY
type=KY
route=15
maint=KYTC
maint_abbrev=KYTC
alternate_name=
length_mi=131.418
length_round=3
length_ref=cite web|url=http://www.planning.kytc.ky.gov/data_reports.asp|title=Kentucky Transportation Cabinet - Division of Planning - Highway Information System Official Milepoint Route Log Extract|accessdate=2007-06-11]
direction_a=South
starting_terminus=
junction=
direction_b=North
ending_terminus=
counties=Letcher, Knott, Perry, Breathitt, Wolfe, Powell, Clark
cities=Whitesburg, Vicco, Hazard, Jackson, Campton, Clay City, Winchester
previous_type=KY
previous_route=14
next_type=KY
next_route=16Kentucky Route 15 begins at a junction of US 119/
Corridor F & Business KY 15 in Whitesburg, and terminates in Winchester at US 60. It is a major route, connecting the coalfields of theCumberland Plateau with Lexington and other cities in theBluegrass region . The segment from Whitesburg to KY 15 at Campton, which in turn connects to theBert T. Combs Mountain Parkway near the town, is also the primary part of Corridor I of theAppalachian Development Highway System .Future
Currently, KY 15 is being relocated onto a new four-lane divided alignment in phases. Construction on section 17 of the relocation project is from KY 205 at Vancleve to Fivemile; construction began on January 6, 2005 at a cost of $36.4 million and is approximately 95% complete. Citation | title = KY-15 Corridor | publisher =
Kentucky Transportation Cabinet | url=http://transportation.ky.gov/progmgmt/precon_project%20_info/special_projects/KY-15/KY-15.html | access-date = 2007-05-17] Work is also progressing on section 16 from Fivemile to Wolverine; construction began on November 2, 2006 with a projected cost of $4.7 million and is approximately 43% complete. There are additional plans to reconstruct the segment from Jackson south to Hazard on new alignment beginning in 2008.References
Wikimedia Foundation. 2010.