Line 6 (Madrid Metro)

Line 6 (Madrid Metro)

Line 6 of the Madrid Metro opened originally between Cuatro Caminos and Pacifico in 1979. This is one of two circular lines in Madrid, but unlike Line 12, it did not open as a full circle. The circle was completed in 1995, taking four stages from its original opening.

First on 7 May 1981, the line was extended from Pacifico to Oporto, then on 1 June 1983, the line was extended from Oporto to Laguna. Thirdly the line was extended from Cuatro Caminos to Ciudad Universitaria serving Madrid's university on 13 January 1987, and lastly the line was extended from Ciudad Universitaria to Laguna on 10 May 1995, completing the circle. Arganzuela-Planetario station opened on 26 January 2007 between Legazpi and Méndez Álvaro. This station serves Madrid's Planetarium and IMAX theatre.

Line 6 is one of the busiest lines on the network, so to ease congestion on the busiest stations, Madrid adopted the "Barcelona method". This means that at some stations there are two side platforms, and an island platform. This was also used on Line S, but only two station preserves the original layout (Campamento and Carabanchel).

Line 6 uses 6-car trains of mostly class 5000, but there are a few class 7000's on this line. In the future, the second batch of class 9000 is projected to run on line 6.


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • Line 8 (Madrid Metro) — Line 8 of the Madrid Metro opened between Mar De Cristal and Campo de las Naciones on 24 June 1998. An extension to Barajas via Madrid Airport was opened in 1999 and in 2002 an extension to Nuevos Ministerios and Colombia opened. Originally this… …   Wikipedia

  • Line 10 (Madrid Metro) — Line 10 of the Madrid Metro is in fact the product of two lines, the former line 8 from Fuencarral to Nuevos Ministerios and the former Suburbano (also known as Line S) from Alonso Martínez to Aluche, this section being named line 10 in the 1980s …   Wikipedia

  • Line 7 (Madrid Metro) — Line 7 of the Madrid Metro originally opened on 17 July 1974 between Pueblo Nuevo and Las Musas. On 17 May 1975, the line was extended from Pueblo Nuevo to Avenida de América and for many years, this remained the length of Line 7. This was a… …   Wikipedia

  • Line 4 (Madrid Metro) — Line 4 of the Madrid Metro was opened on 23 March 1944 between Goya and Argüelles. In 1958, the line took up a branch of line 2 from Goya to Diego de León, which originally opened on 17 September 1932. In the 1970 s, the line was extended in two… …   Wikipedia

  • Line 12 (Madrid Metro) — Line 12, also known as MetroSur, is a line of the Madrid Metro. Opened on 11 April 2003, Line 12 is a circular line that is not in fact in Madrid, but links five suburbial towns and one small village south of Madrid, serving around 1 million… …   Wikipedia

  • Line 11 (Madrid Metro) — Line 11 of the Madrid Metro opened between Plaza Elíptica and Pan Bendito on 16 November 1998. For eight years it had only three stations. In 2006 the line was extended from Pan Bendito to La Peseta with two intermediate stations. Line 11 however …   Wikipedia

  • Line 1 (Madrid Metro) — Line 1 of the Madrid Metro was opened on 17 September 1919 between Cuatro Caminos and Sol. It was extended from Sol to Atocha in 1921, Atocha to Puente de Vallecas in 1923, Cuatro Caminos to Tetuán in 1929, Tetuán to Plaza De Castilla in 1961 and …   Wikipedia

  • Line 2 (Madrid Metro) — Line 2 of the Madrid Metro was opened on 11 June 1924 between Sol and Ventas. It was later extended fron Sol to Quevedo on 27 December 1925 and from Quevedo to Cuatro Caminos on 1 September 1929. In 1932, a branch from Goya to Diego de León was… …   Wikipedia

  • Line 3 (Madrid Metro) — Line 3 of the Madrid Metro was opened in August 1936 between Sol and Embajadores, a few days before the beginning of the Spanish Civil War. In 1941 it was extended from Sol to Argüelles, in 1949 from Embajadores to Delicias, in 1951 from Delicias …   Wikipedia

  • Line 5 (Madrid Metro) — Line 5 of the Madrid Metro originally opened between Callao and Carabanchel on 5 June 1968, the latter sharing station platforms with then called Line S (for Suburbano ) On 2 March 1970, the line was extended from Callao to Ciudad Lineal, however …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”