- Savannah River Site
The Savannah River Site (SRS) is a nuclear materials processing center in the
United States state ofSouth Carolina , located on land in Aiken, Allendale and Barwnell Counties adjacent to theSavannah River 25 miles fromAugusta, Georgia . It is operated for the U.S. Department of Energy (DOE) by the Washington Savannah River Company (WSRC), which is a wholly owned subsidiary ofWashington Group International . There are several other partner companies on the Savannah River Site including Bechtel Savannah River, Inc. (BSRI), a wholly owned subsidiary ofBechtel , BNG America now Energy Solutions (formerly part ofBNFL ), BWXT Savannah River Company, aBWXT company, and CH2 Savannah River Company, aCH2M Hill subsidiary.The site was built during the 1950s to refine nuclear materials for deployment in
nuclear weapons .Currently none of the reactors on-site are operating (see
list of nuclear reactors ). The site is engaged mainly in clean-up activities related to work done in the past making nuclear weapons. Future plans for the site cover a wide range of options, including host to research reactors, a reactor park for power generation andtritium manufacture, a "Modern Pit Facility" to build triggers for the next generation of US nuclear weapons, including tactical field weapons ("mini-nukes"). DOE and its corporate partners are watched by a loose combination of local, regional and national regulatory agencies and citizen's groups. The base is secured byWackenhut guards, who have the authority to make arrests for criminal security violations.Timeline
1950-1951: The federal government asked E.I. DuPont to build and operate a
plutonium production plant near the Savannah River in South Carolina. The company had expertise inatomic energy , having designed and built the plutonium production complex at theHanford site for theManhattan Project duringWorld War II . A large portion of farmland, the towns of Ellenton and Dunbarton, and several unincorporated communities including Meyers Mill, Leigh, Robins, and Hawthorne were bought undereminent domain and converted to the Savannah River Site managed by the U.S. Atomic Energy Commission. Biologists from the University of Georgia began ecological studies of local plants and animals, and construction began.1952-1954: Production of
heavy water for the site reactors began and reactors R, P, L and K went critical. The first irradiated fuel was discharged. F-Canyon, the world's first operational full-scalePUREX separation plant, beganradioactive operations onNovember 4 ,1954 . PUREX (Plutonium andUranium EXtraction) extracted plutonium and uranium products from materials irradiated in the reactors.1955-1956: C-Reactor went critical. The first plutonium shipment left the site. H-Canyon, a chemical separation facility, began radioactive operations. Construction of the basic plant was completed.
1961:
University of Georgia professorEugene Odum founds the Savannah River Ecology Laboratory to study the effects of radiation upon organisms at the site.1962-1964: The
Heavy Water Components Test Reactor (HWCTR) was tested.1963-1971: The receiving basin for off-site fuels received the first shipment of off-site spent nuclear fuel. L-reactor was shut down for upgrades. R-reactor was shut down. K-reactor became the first reactor to be controlled by computer.
1972: The site was designated as a National Environmental Research Park.
1981-1983: An environmental cleanup program began. M-Area settling basin cleanup began under the
Resource Conservation and Recovery Act (RCRA). The heavy water rework facility was closed. Construction of the defense waste processing facility began.1985-1987: HB-Line began producing plutonium-238 for NASA's deep-space exploration program. L-reactor restarted and C-reactor shut down. A groundwater remediation system is constructed in M-Area. Construction of Saltstone and of the Replacement Tritium Facility began. DuPont notified DOE that it would not continue to operate and manage the site.
1988-1989: K, L, and P-Reactors were shut down. An effluent treatment facility began treating low-level radioactive wastewater from F and H-Area separations facilities. The site was included on the National Priority List and became regulated by the EPA. Westinghouse Savannah River Company assumed management and operation of site facilities.
1990-1993: Construction of a
cooling tower for K-reactor began. Saltstone began operation. The mixed waste management facility was the first site facility to be closed and certified under the provisions of RCRA. L-reactor and M-Area settling basin were shut down. With the end of theCold War , production of nuclear materials for weapons use ceased. Cooling tower connected to the K-reactor and the reactor operated briefly for the last time. The Secretary of Energy announced the phase-out of all uranium processing. Non-radioactive operations began at the replacement tritium facility and at the defense waste processing facility. K-reactor was placed in cold-standby condition. Construction began on the consolidatedincineration facility. The Workforce Transition and Community Assistance began.1994-1997: The Savannah River Site Citizens Advisory Board was established. The Defense Waste Processing Facility (DWPF) introduced radioactive material into the vitrification process. K-reactor was shut down. F-Canyon restarted and began stabilizing nuclear materials. The first high-level radioactive waste tanks were closed.
1998-2000: Savannah River Site was selected as the site of three new plutonium facilities for: a MOX fuel fabrication; pit disassembly and conversion; and plutonium immobilization. The K-reactor building was converted to a storage facility. The WSRC earned the DOE's top safety performance honor of Star Status.
2001: The first shipment of
transuranic waste was sent to the DOE'sWaste Isolation Pilot Plant (WIPP ) Project inNew Mexico . The defense waste processing facility completed production of four million pounds of environmentally acceptable glassified waste.2002: The F-Canyon and FB Line facilities completed their last production run. The Savannah River Technology Center participated in a study of using a nuclear power reactor to produce hydrogen from water.
2003 - In January, Westinghouse Savannah River Company completed transferring the last of F-Canyon’s radioactive material to H Tank Farm. The defense waste processing facility began radioactive operations with its second melter, installed during a shutdown. The last depleted uranium metal was shipped from M-Area for disposition at Envirocare of Utah. The last unit of spent nuclear fuel from the Receiving Basin for Offsite Fuels (RBOF) was shipped across the site to its new location in preparation for RBOF's closure.
2004: The site shipped its 10,000th drum of transuranic waste to the Waste Isolation Pilot Plant (WIPP), a DOE facility in New Mexico, 12 years ahead of schedule. In a visit, Secretary of Energy Abraham designated it the
Savannah River National Laboratory (SRNL), one of twelve DOE national laboratories. Two prototype bomb disposal robots developed by the Savannah River National Laboratory were deployed for military use in Iraq.2005: The Tritium Extraction Facility (TEF) was completed and will be used to extract tritium from materials irradiated in the
Tennessee Valley Authority 's commercial nuclear reactors. Savannah River Site's first shipment of neptunium oxide arrived at the Argonne West Laboratory in Idaho. This was the last of the nation's neptunium inventory, and the last of the materials to be stabilized to satisfy commitments for stabilizing nuclear materials. F-Canyon was the first major nuclear facility at the site to be suspended and deactivated. Low-enriched uranium (LEU) from the site was used by a Tennessee Valley Authority nuclear power reactor to generate electricity. The tritium facilities modernization and consolidation project completed start-up and replaced the gas purification and processing that took place in 232-H. WSRC begins multi-stage layoffs of permanent employees.2006:
*Design work took place and is ongoing, for theSalt Waste Processing Facility (SWPF), a facility designed to process radioactive liquid waste stored in underground storage tanks at the site. The SWPF project work is performed by a group anchored byParsons Corporation . Work continues on Design of the Mixed Oxide Fuel (MOX fuel ) Project by a consortium known as DCS (Duke Power ,COGEMA , andStone & Webster ), but currently, funding has become a major issue since the project is tied to a Russian counterpart project.
*A new species ofextremophiles was found inside one of the tanks. It was namedkineococcus radiotolerans . [ [http://chronicle.augusta.com/stories/latest/lat_126668.shtml "Augusta Chronicle"] ]2007: On
August 1 ,2007 , construction officially began on the Mixed Oxide Fuel Fabrication Facility. "The current deadline for the completion of construction is 2014. Following startup testing, the facility would begin operations in 2016 with a disposition rate of up to 3.5 tons of plutonium oxide each year. The mission is supposed to end in 2035, although it could be extended to 2038." [ [http://www.aikenstandard.com/news/289370915910505.php aikenstandard.com] ]Reactors
[ [http://www.fas.org/sgp/othergov/doe/pu50yc.html#ZZ16 fas.org] ]
Contract changes
Management of the Savannah River Site was to be bid in 2006 (similar to the
Los Alamos National Laboratory contract bid in 2005), however the Department of Energy extended the contract with the existing partners, WSRC and BSRI for eighteen months to June 2008. Allegedly, difficult relations between site management and DOE have led to a thorough examination of the path forward.In 2006 DOE decided to split the WSRC Contract into two new separate contracts, i.e. the M&O Contract and the Liquid Waste Contract to be awarded before June 2008. Responding to the DOE RFP, the Savannah River Nuclear Solutions (SRNS), LLC, a Fluor Daniel partnership with
Honeywell ,Northrop Grumman , andLockheed Martin submitted a proposal in June 2007 for the new M&O Contract. The WSRC also submitted a proposal to compete for the M&O Contract. OnJanuary 9 ,2008 it was announced that SRNS LLC had won the new M&O contract, with a 90 day transition period to startJanuary 24 ,2008 . However, the transition was delayed by a protest filed with GAO by WSRC on January 22, 2008. The GAO denied the protest on April 25. DOE-SR then directed SRNS to start transition on May 2 and take over operation on August 1, 2008.Popular culture
In Pat Conroy's book "
The Prince of Tides ", the fictional town of Colleton was purchased, dismantled, and relocated by the federal government in order to create a nuclear site. That series of events is based loosely on the accounts of the towns of Ellenton and Dunbarton, which occurred in real life.A reference to the Savannah River Site was made in the film adaptation of
Tom Clancy 's novel, "The Sum of All Fears". In the film, protagonist Jack Ryan, played byBen Affleck , discovers that thenuclear device that destroyed the city ofBaltimore was derived from an Israeli bomb with plutonium stolen in 1967 from the Savannah River Site.Environmental contamination and worker safety issues at the plant were the subject of "Building Bombs", a 1991 documentary film by Mark Mori and Susan Robinson.
ee also
*
PUFF-PLUME , anatmospheric dispersion model developed for emergency response use at the Savannah River Site.References
External links
* [http://www.srs.gov Official website of the Savannah River Site]
* [http://www.moxproject.com Official website of the MOX (Mixed Oxide) Project]
* [http://srnl.doe.gov Official website of the Savannah River National Laboratory (SRNL)]
* [http://energy.gov/index.htm Official website of the Department of Energy]
* [http://www.savannahrivernuclearsolutions.com/index.html Official website of the Savannah River Nuclear Solutions (SRNS)]
* [http://www.wgint.com Official website of Washington Division of URS Corporation]
* [http://www.parsons.com Official website of Parsons Corporation]
* [http://www.bechtel.com Official website of Bechtel]
* [http://alsos.wlu.edu/qsearch.aspx?browse=places/Savannah+River,+South+Carolina Annotated bibliography for Savannah River from the Alsos Digital Library for Nuclear Issues]
* [http://www.epa.gov/superfund/resources/radiation/pdf/tritium.pdf#search='Tritium' Official EPA Tritium Fact Sheet]
Wikimedia Foundation. 2010.