- Tiwai Point
Tiwai Point lies at the entrance to Bluff Harbour on the southern coast of the
South Island ofNew Zealand . A spit which extends from the western end of theAwarua Plain , it lies between Awarua Bay to the north andFoveaux Strait to the south. It is famous for the Tiwai Point Aluminium Smelter, one of the largest industrial facilities in New Zealand. [ [http://www.teara.govt.nz/NewZealandInBrief/Economy/4/en Secondary production] (fromTe Ara Encyclopedia of New Zealand )]Aluminium smelting
;Process
Tiwai Point is the location of an aluminium smelter which was opened in 1971. It is one of the 20 largest aluminium smelters of the world [ [http://www.mwhglobal.co.nz/Smart-Tools/Feature-Projects/Tiwai-Point-Smelter.asp Smart solutions at aluminium smelter] (from the MWH company website. Accessed 2008-01-17.)] and currently provides NZ$3.65 billion worth of economic benefit to the New Zealand economy. It produces the world's highest purity primary (i.e. directly refined made from alumina ore) aluminium. The ore is mostly imported from Australia, while the finished product mostly goes to Japan. [http://www.comalco.com/localcommunities/295.asp Tiwai Point - Overview] (from the
Rio Tinto Aluminium website. Retrieved 2007-09-29.)];Facility
The smelter currently consists of 3 lines of P69 technology cells, with 208 cells each (i.e. 624 total), and one line of 48 CD200 technology cells. Approximately 800 full time personnel are employed, and up to ~ 130 additional contractors. [http://www.comalco.com/localcommunities/295_514.asp Tiwai Point - Key Data] (from the
Rio Tinto Aluminium website. Retrieved 2007-09-29.)] Current metal production is ~ 330 kilotonnes per annum. The third P69 Line was buit in the early 1980s as part of the Muldoon governmentThink Big project.;Electricity
The smelter uses ~610MW of electricity, which is largely supplied by the
Lake Manapouri power station, which due to its perceived reliability played a major role in the choice of building the aluminium smelter in Southland, with both the power plant and the smelter having been constructed as a joint project. The facility is the largest electricity consumer in New Zealand, and uses approximately 15% of the total power countrywide. The process also emits large amounts ofgreenhouse gas es, though the smelter is hailed as being amongst the Top 5% of all aluminium smelters worldwide in terms of limiting its emissions.;OwnershipThe smelter is currently owned by
Rio Tinto Aluminium (RTA) (79.36%) and the Sumitomo Chemical Company (20.64%)." [http://www.nzherald.co.nz/category/story.cfm?c_id=37&objectid=10467340 Meridian boss hails deal with smelter] " - "The New Zealand Herald ", Wednesday 03 October 2007] Paul Hemburrow is the current General Manager Operations (as of 2007).References
Wikimedia Foundation. 2010.