- Rathole tunnel
Rathole tunnels are railway tunnels where fumes from locomotives make passage through the tunnel unpleasantFact|date=February 2007.
Overview
Rathole tunnels are characterized by being long, steeply graded, narrow bores (often with single tracks). Their locations may also be subject to unfavorable winds that prevent smoke from clearing the tunnel.
Some of these features are caused by the tunnels having to be unusual shapes (such as incorporating an S shaped bend in the middle), or changing gradient in the middle.
Examples of Rathole Tunnels
Australia
*
Ardglen Tunnel inNew South Wales -Garratt locomotives prohibited, because of heat problems in the narrow bore.
*Coalcliff Tunnel in New South Wales - restricted loads for heavy 57 class engines, so that engine need not work at full blast.
* The oldOtford Tunnel ,Otford , New South Wales - notorious for suffocating fumes - at ruling 1 in 40 grade - sea breezes often blew smoke along with train. c1880.
* The oldLapstone Tunnel that replaced theLapstone Zig Zag was built too steep and eventually had to be replaced by a gentler alignment.
* The 10 tunnels atLithgow that replaced theZig Zag Railway were sometimes considered to be rathole tunnels, but the gradients were fairly gentle at 1 in 90 (1.11%), the tunnels were double track, and the gaps between the tunnels allowed for some intermediate ventilation. The western approaches were graded at 1 in 42 and required use ofBank engine helpers only in the open air. This deviation was opened in 1910.
* The 3 tunnels on the Ulan line in New South Wales, in particular the long Bylong tunnel, have tight profiles. TheAustralian Rail Track Corporation have planned timetabling to allow the tunnels time to clear through natural air movement during theheadway between trains but, with the construction of new passing loops on the line, headway will be reduced and investigations began in 2007 for installation of forced ventilation, possibly using shafts that were used during construction. [http://www.artc.com.au/library/news_301107.pdf ARTC Hunter Valley Corridor 2007–2012 Capacity Strategy Consultation Document]
* TheRhyndaston Tunnel inTasmania is 955 m long with a small bore, and is graded at 1 in 40.Germany
*Cochemer Tunnel, 4205 m long double-track, opened 1877; ventilation system 'Saccardo' installed in 1904, ventilation shaft added in 1913, electrification 1976
Italy
*In the
Balvano train disaster of March 3, 1944, over 500 people who stole a ride on a steam-hauled freight train died of carbon monoxide poisoning when the overloaded train stalled in a steeply graded tunnel.New Zealand
*
Lyttelton rail tunnel , originally steam, was electrified, now diesel
*Otira Tunnel , steep grade (1 in 33), originally electrified, now diesel with special ventilation
*Tawa Flat deviation , steep grade, with a long Tawa No 2 tunnel, electrifiedUnited Kingdom
*
Oxendon Tunnel
*Kelmarsh Tunnel
*Woodhead Tunnel Woodhead 1 & 2 (dating from 1845); but Woodhead 3, opened in 1950s was wide-bore twin tracked electrified.
*Combe Down Tunnel on theSomerset & Dorset Joint Railway was a narrow mile long bore with a grade of 1 in 100 on a line with a ruling grade of 1 in 50.
*Dove Holes Tunnel
*Privett Tunnel
*Fowey Branch Tunnel incorporated an internal change in gradient, where a metal gong alerted engine crews to the fact.witzerland
*Ricken-Tunnel, 8604 m long single-track, gradient 15,75 ‰, on October 4, 1926 9 railwaymen died of carbon monoxide poisoning while their train came to a halt in the tunnel, electrified 1927
United States
*The first
Cascade Tunnel was built to replace an unsatisfactory quick-to-build section of line with 8 switchbacks, problems with snow, steep grades, train length limits. Unfortunately, the first tunnel was quite long (4.228 km) and had a steep gradient of 1.7%, and had severe problems with smoke, qualifying it as a rathole tunnel.
*The second longerCascade Tunnel 12.543 km long was built with gradient of 1.565%. It was originally electrified. However when dieselisation came, the fume problem resurfaced, requiring a ventilation system to be installed to clear the air after each train.
*Winston Tunnel on theChicago Great Western main line in northwestIllinois , with approx .95% grade. Despite being less than 1/2 mile long, the poor design of the tunnel meant that fan ventilation was required during the period that steam locomotives operated through it.Rathole Tunnels Without Problems
*
Box Tunnel on theGreat Western Railway , built ca.1838 was never a problem, even though it is quite long at about 2 km, and has a relatively steep gradient of 1 in 100, because:
**It is double track;
**Its dimensions are large compared to the rolling stock gauge of the trains, since the route's conversion fromBroad Gauge in the 1890s (note though that the monumental portals were an act of propaganda when it was built; the tunnel narrows to the proper size inside)
**There are several air vents along the way (though this is normally the case when tunnels are constructed, there was worry of asphyxiation in the tunnel when it opened so excess were provided)
**trains rarely enter tunnel from standing start (due to the closure of Box railway station)
**double headed trains are rare.*While the
Unanderra ,New South Wales toMoss Vale line has steep continuous grades of 1 in 33, the grades ease to 1 in 100 through the tunnels on the line.ee also
*
Rail Transport References
Wikimedia Foundation. 2010.