South Yorkshire Junction Railway

South Yorkshire Junction Railway

The South Yorkshire Junction Railway is a railway which ran from Wrangbrook Junction on the main line of the Hull and Barnsley Railway to near Denaby in South Yorkshire. It was nominally an independent company sponsored by the Denaby and Cadeby Colliery Company but was worked by the Hull and Barnsley.

The S.Y.J.R. received its Act of Parliament on 14 August 1890 opening for goods traffic on 1 September 1894 and for passengers on 1st December the same year. The passenger service lasted less than 9 years, the last trains running on 1 February 1903. Intermediate passenger stations were at Sprotborough and Pickburn and Brodsworth.

Goods traffic lasted some time longer, between Wrangbrook and Steetley Sidings, south of Sprotborough and the branch which served Brodsworth Colliery this finished on 7 August 1967. The line from Steetley Sidings to Lowfield Junction, the connection with the Great Central Railway 's Doncaster to Sheffield line just west of Conisbrough,saw its last main line traffic in July 1975 although it was used by the National Coal Board to transfer traffic between Cadeby Colliery and Denaby Main Colliery, where the N.C.B. had wagon repair facilities.

The Hull and Barnsley Railway was absorbed into the North Eastern Railway in 1921 and then to the London and North Eastern Railway at the Grouping.


Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • South Yorkshire Joint Railway — was a committee formed in 1903, between the Great Central Railway (GCR), the Great Northern Railway (GNR), the Lancashire and Yorkshire Railway (L YR), the Midland Railway (MR) and the North Eastern Railway (NER) to oversee the construction of a… …   Wikipedia

  • The Hull & South Yorkshire Extension Railway — The Hull and South Yorkshire Extension Railway was incorporated on 6 August 1897 and on 25 July 1898 was transferred to the Hull and Barnsley Railway.The bill was deposited by a group of local coal owners representing the Manvers Main Colliery… …   Wikipedia

  • North and South Western Junction Railway — Locale London, England Dates of operation 1853–1871 Successor Joint ownership: London and North Western Railway, Midland Railway, North London Railway Track gauge 4  …   Wikipedia

  • South Yorkshire Railway — For the Preservation Society South Yorkshire Railway Co. Ltd. see Heritage Shunters Trust The South Yorkshire Railway was a railway company which was based in the south of the former West Riding of Yorkshire. Its first section of line opened on… …   Wikipedia

  • Caledonian and Dunbartonshire Junction Railway — [v · d · …   Wikipedia

  • Stratford-upon-Avon and Midland Junction Railway — The Stratford Upon Avon Midland Junction Railway (SMJR) was a small independent railway company which ran a line across the empty, untouched centre of England. It visited the counties of Northamptonshire, Warwickshire, Oxfordshire and a little of …   Wikipedia

  • Cleator and Workington Junction Railway — Cleator Workington Junction Railway Overview Type Rural Line System National Rail Network Status Closed Locale Cumbria …   Wikipedia

  • Maltby, South Yorkshire — This article is about the town of Maltby, South Yorkshire. For other uses, see Maltby. Coordinates: 53°25′34″N 1°12′36″W / 53.426°N 1.210°W …   Wikipedia

  • North Yorkshire Moors Railway — Three LNER Class A4 locomotives at Grosmont loco shed. Locale North Yorkshire …   Wikipedia

  • River Don, South Yorkshire — River Don The River Don as it flows past Hillsborough Stadium. Origin Pennines …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”