Arab Gas Pipeline is a pipeline that exports
Egypt ian natural gas to theMiddle East and by the possible further extension, toEurope . When completed, it will have a total length of convert|1200|km|mi|-1 at a cost of US$1.2 billion.cite news
url= http://yalibnan.com/site/archives/2008/02/_the_meeting_co.php
title=Lebanon minister in Syria to discuss the Arab Gas Pipeline
publisher=Ya Libnan
date=2008-02-23
accessdate=2008-03-10]Egypt-Jordan connection
The first section of pipeline runs from
Arish in Egypt toAqaba inJordan . It has three segments. The first convert|250|km|mi long overland segment links Al-Arish to Taba on theRed Sea . It also consists of a compressor station in Arish and a metering station in Taba. The second segment is a convert|15|km|mi long subsea segment from Taba to Aqaba. The third segment, which includes also a metering station, is a convert|1|km|mi long onshore connection to theAqaba Thermal Power Station .cite web
publisher= The Arab Fund for Economic and Social Development
url= http://www.arabfund.org/Project/proj427.htm
title = Natural Gas Pipeline (Al-Arish – Aqaba). Project fact sheet
accessdate=2008-08-12]The US$220 million cost Arish-Aqaba section was completed in July
2003 .cite news
publisher= Gulf Oil & Gas
url= http://www.gulfoilandgas.com/webpro1/MAIN/Mainnews.asp?id=357
title = Arab gas pipeline agreement
date = 2004-01-26
accessdate=2007-10-05] The diameter of the pipeline is convert|36|in|mm|-1 and the annual capacity of this section is 1.1 billion cubic meters (bcm). The Egyptian consortium that developed this section includedEGAS , ENPPI,PETROGET andGASCO .Aqaba-El Rehab section
The second section extended the pipeline from Aqaba to
El Rehab in Jordan (24 km from theSyria n boarder). The length of this section is convert|390|km|mi|0 and it cost US$300 million. The second section was commissioned in2005 .Jordan-Syria connection
The third section has a total length of convert|319|km|mi|0 from Jordan to Syria. convert|90|km|mi|0 stretch runs from the Jordan-Syrian border to the
Deir Ali power station. From there the pipeline runs to the Al Rayan gas compressor nearHoms . This sections includes four launching/receiving stations, 12 valve stations and fiscal metering station with capacity of 1.1 bcm, and it supplies Tishreen and Deir Ali power stations. The section was completed in February 2008, and it was built by theSyrian Petroleum Company andStroytransgaz , a subsidiary ofGazprom .cite news
url= http://www.downstreamtoday.com/News/Articles/200802/Syria_Completes_First_Stage_of_Arab_Gas__8761.aspx
title=Syria Completes First Stage of Arab Gas Pipeline
publisher=Downstream Today
date=2008-02-18
accessdate=2008-02-23] cite web
publisher= The Canadian Trade Commissioner Service
url= http://www.infoexport.gc.ca/ie-en/DisplayDocument.jsp?did=60298#6
title = Stroitransgaz wins tender to build the third part of Arab gas pipeline
date = November 2005
accessdate=2008-01-14]Arish-Ashkelon pipeline
The Arish-
Ashkelon pipeline is a convert|100|km|mi|-1 submarine gas pipeline connecting the Arab Gas Pipeline with Israel. It is built and operated by theEast Mediterranean Gas Company , a joint company ofEgyptian General Petroleum Corp. (EGPC - 68.4%), the Israeli companyMerhav (25%) as well asAmpal-American Israel Corp. (6.6%).cite web | publisher= Daily Star Egypt | author=Waleed Khalil Rasromani | url= http://www.dailystaregypt.com/article.aspx?ArticleID=1249 | title = Inching Closer to Europe | date =2006-04-18 | accessdate=2007-10-05] The pipeline became operational in February 2008. Egypt and Israel have agreed to supply of 1.7 bcm natural gas per annum through this pipeline.cite web | publisher= Upstream Online | author=Nassir Shirkani | url= http://www.upstreamonline.com/live/article150348.ece | title = Egyptian gas flows to Israel | date =2008-03-10 | accessdate=2008-03-10]Future extensions
yria-Turkey connection
In March
2006 , Egypt, Syria, Jordan,Turkey ,Lebanon andRomania reached an agreement to build the pipeline's extension through Syria to the Turkish border. From there, the pipeline will be connected to the plannedNabucco Pipeline for the delivery of gas to Europe. Turkey expects to buy 2-4 bcm of gas annually by the Arab Gas Pipeline.cite web | publisher= Alexander's Gas & Oil Connections | url= http://www.gasandoil.com/GOC/news/nte61633.htm | title = Ministers agree to extend Arab gas pipeline to Turkey | date = 2006-03-29 | accessdate=2007-10-05] On4 January 2008 , Turkey and Syria signed an agreement to construct a convert|63|km|mi|0 pipeline betweenAleppo andKilis connecting Arab Gas pipeline with the Turkish grid.cite web | publisher= Downstream Today | url= http://www.downstreamtoday.com/News/Articles/200801/Syria_to_Buy_Iranian_Gas_Via_Turkey_8021.aspx?AspxAutoDetectCookieSupport=1 | title = Syria to Buy Iranian Gas Via Turkey | date = 2008-01-09 | accessdate=2008-01-14] cite web | publisher= Euro-Arab Mashreq Gas Co-operation Centre | url= http://eamgcc.org/archive/docs/File/downloads/EAMGCC%20newsletter%20November%202007.pdf | title = The Euro-Arab Mashreq Gas Market Project – Progress November 2007 | format = PDF |accessdate=2008-01-14] The connection is expected to be ready by 2011.yria-Lebanon connection
It has been planned to extend Arab Gas Pipeline from Syria to Tripoli in
Lebanon and probably further fromBaniyas in Syria toCyprus .cite web | publisher= ArabicNews.com | url= http://www.arabicnews.com/ansub/Daily/Day/040925/2004092520.html | title = Timetable for extending Arab gas pipelines inside Jordan and Syria discussed | date = 2004-09-25 | accessdate=2007-10-05] The pipeline between Syria and Lebanon would be ready by the mid-2008.cite news
url= http://www.kuwaittimes.net/read_news.php?newsid=MzM0NTE0MTM=
title=Egypt to begin exporting gas to Syria next month
publisher=Kuwait Times
date=2008-02-24
accessdate=2008-03-10]Connection with Iraq
In September 2004, Egypt, Jordan, Syria and Lebanon agreed to connect the Arab Gas Pipeline with
Iraq is gas grid to allow Iraqis gas export to Europe. This project planned to be completed by2010 .cite web | publisher= Gulf Oil & Gas | url= http://www.gulfoilandgas.com/webpro1/main/mainnews.asp?id=875 | title = Iraq Joins the Arab Gas Pipeline Project | date = 2004-09-26 | accessdate=2007-10-05]References