- Brightman Street Bridge
Infobox Bridge
bridge_name=Brightman Street Bridge
caption=
official_name=
carries=
crosses=Taunton River
locale=Somerset toFall River, Massachusetts
maint=
id=
design=two-leaf bascule bridge
mainspan=98 ft [http://www.srpedd.org/Ch7bridges.pdf]
length=922 ft
width=
height=
load=
clearance=
below=27 ft
traffic=
begin=1906
complete=1908
open=October 10 ,1908
closed=
toll=
map_cue=
map_
map_text=
map_width=
coordinates= coord|41|43|26.26|N|71|09|20.51|W|region:US_type:landmark|display=inline,title
lat=
long=The Brightman Street Bridge is a convert|922|ft|m|sing=on long, four-lane wide drawbridge spanning theTaunton River between the town of Somerset and the city of Fall River,Massachusetts . It was authorized in 1903 by the state legislature, and building took place between 1906 and 1908, when it opened full time on October 10, 1908.At the time of its completion, it was the widest bridge to span the Taunton River, as the
Slade's Ferry Bridge , a steel swingspan bridge built in 1875 less than a quarter mile downriver, was barely a two lane bridge. It now serves as the pathway for Route 6 and Route 138 to cross the river into Fall River. Other than the one-laneBerkley-Dighton Bridge 8 1/2 miles to the north, it is the only non-highway bridge spanning the river between Fall River and Taunton. Along with the Braga Bridge, it is one of the two major crossings of the river. This has led to the bridge having vital importance anytime there is a problem on the Braga; since the northern detour takes approximately twenty miles and the southern detour (over theMount Hope Bridge and theSakonnet River Bridge ) is over twenty-five miles, it immediately becomes the major path for people coming in and out of the city, and vice versa.Replacement and Controversy
With the age of the bridge becoming a problem, as well as the rising costs of necessary upkeep and maintenance, talk began circulating about replacing the bridge as early as the late 1970s and early 1980s. Starting in 1983, [ [http://www.jrcwebexchange.com/shared/frherald/standingproud/html/content/getting/3.htm "New bridge on schedule despite budget cutbacks," Herald News, 18 April 2002] ] plans were put in place to replace the bridge with a new, higher and wider span convert|1500|ft|m upriver, which would span from a proposed flyover intersection with Route 79 on the Fall River side, to a new access road through the former site of Slade's Ferry Park in Somerset. A new "official" name has never been given to this bridge, although there has been a minor campaign by the area's Portuguese community to name the bridge for
Miguel Corte-Real , the Portuguese explorer who many believe explored the area in the early 16th century (as evidenced by one of the theories explaining the markings onDighton Rock upstream). [ [http://www.apol.net/dightonrock/bridgecortereal.htm The Miguel Corte-Real Bridge webpage] ]Plans were put on hold in 1989, when the Coast Guard protested the size of the opening of the bridge. Once details were worked out, work began in the late 1990s, but again with delays. This was due to money being taken away from the project for the well-over budget Big Dig project in Boston. [Ibid. 1] Again the work was delayed until costs could be met. A third problem arose a few years later, when inspectors questioned the quality of the cement used in the main pilings for the bridge. This caused yet more delays as inspections and tests were needed on the piers.
The most recent controversy involving the bridge does not involve the bridge work at all, but rather involves the proposed building of a LNG terminal at Weaver's Cove, just to the north of the new bridge. This project has met with fierce opposition from the surrounding community, as well as federal, state and local leaders, including Representatives
James McGovern andBarney Frank , as well as SenatorsJohn Kerry and Edward Kennedy, all of whom have made appearances at various opposition rallies. The problems are twofold:
*For one, there is the belief that LNG tankers could be targets of terrorism, as an explosion of a tanker, whether on route or in port, could cause catastrophic damage and loss of life in the community.
*There is also the concern about LNG transportation requirements, which would involve the closing of not just the new bridge, but also the Braga Bridge, for several hours at a time, thus cutting off vital trade routes in the area.All of this has led to a rather ironic campaign to keep the original bridge standing after the new one is completed. [ [http://www.boston.com/news/local/massachusetts/articles/2005/08/22/obstacles_keep_hope_alive_for_foes_of_fall_river_lng_facility/ "Obstacles keep hope alive for foes of Fall River LNG facility," Boston Globe, 22 Aug 2005.] ] So far the campaign has been successful in keeping the old bridge standing, but whether or not it stops the LNG terminal from being built is still undetermined.
See also
*
List of crossings of the Taunton River
*Brightman Street Bridge Replacement References
Crossings navbox
structure = Crossings
place =Taunton River
bridge = Brightman Street Bridge
bridge signs =
upstream =Berkley-Dighton Bridge
(Brightman Street Bridge Replacement under construction)
upstream signs =
downstream = Braga Bridge
downstream signs =
Wikimedia Foundation. 2010.