- 2 Marsham Street
2 Marsham Street is the headquarters of the
Home Office branch of theBritish Government as of March 2005. Before this date the Home Office was located at50 Queen Anne's Gate .History
The site was previously occupied by the Departments of the Environment and Transport. The headquarters offices of both departments were located in
Marsham Towers - three 20-floor concrete towers which were nicknamed "the three ugly sisters". Construction was completed in 1971. The towers were demolished in 2003 to make way for the new building into which the Home Office moved into in 2005. Prior to the ugly sisters epoch, from about 1818, the site housed the Chartered Gas Works of the Westminster Gas Light and Coke Company, as well as a laundry yard.Design
Designed by Terry Farrell, the new building was financed through the
Private Finance Initiative model with French construction firmBouygues as contractor. It was completed within 34 months. The cost of £311 million will be spread over 29 years and will be partially met by the issue of bonds. The site is made up of three buildings, designated Seacole, Peel and Fry. They are named after Mary Jane Seacole,Robert Peel andElizabeth Fry , figures who had significant impacts in areas within the Home Office's responsibility. The Marsham Street development also includes a block of residential flats, shops and restaurants.The buildings are connected by a bridge from the 1st to the 4th floors, forming part of a corridor that runs the whole length of the building. Staff call this corridor 'The Street'. During design, the emphasis was on creating a building with a community feel. To that end, the open-plan offices are well lit, situated around three central atria and overlooking turfed 'pocket parks'. The building has also been constructed to be energy efficient and to fall well within government energy-expenditure targets. The approachable effect of the building is enhanced by art-work by
Liam Gillick who used coloured glass to change the feel of the building depending on the light conditions.The site contains 46,500 m² (500,522 sq ft) of office space.
Critical reception
Since its completion in early 2005, 2 Marsham Street has been well received by the architectural community winning an RIBA Award for Architecture, a Leading European Architects Forum and MIPIM 2006 Awards. The contractor's provision of the building within the time-frame required has also been praised. [http://www.hughpearman.com/articles5/homeoffice.html] The
Home Secretary at the time of the building's completion,Charles Clarke , has stated "By moving to a newer, more efficient headquarters, the Home Office will save taxpayers around £95m. This will contribute to the Home Office's programme to save £1.97bn so that we can target more money at front line services like policing and border control." [http://www.publicservice.co.uk/readnews.asp?id=659]External links
* [http://www.emporis.com/en/wm/st/?id=180092 Emporis Page for Marsham Street]
* [http://www.cityoffices.net/properties/2-marsham-street-london.cfm City offices Profile Page]
* [http://www.csemag.com/article/CA509839.html?industryid=42662 Article on the design of 2 Marsham Street]
* [http://www.telegraph.co.uk/arts/main.jhtml?xml=/arts/2005/02/07/bard107.xml Telegraph article reviewing 2 Marsham Street]
* [http://www.nao.org.uk/publications/nao_reports/02-03/0203954.pdf National Audit Office report on 2 Marsham Street]
Wikimedia Foundation. 2010.