- Stuttgart Hauptbahnhof
Hbf intro|Stuttgart is the
Hauptbahnhof of the city ofStuttgart in southwesternGermany .Located near the city centre, the main line station is a terminus, whilst the subterranean
S-Bahn andStadtbahn stations are through stations. A plan to convert the main line station to a through station, called "Stuttgart 21 ", has been proposed in recent years and was officially approved in 2007. The station is well known for its 12-storey tower with a large, rotating and illuminatedMercedes-Benz star insignia on top.History
The foundations of the modern station (which is the second "central station" to be built in Stuttgart - the first central station stood until 1866 in Bolzstrasse) were set in 1914. Following delays caused by the First World War the original plan to cover the main hall with a glass roof were abandoned. The station was officially opened on
21 October 1922 although construction work was not completed until December 1927. The architect wasPaul Bonatz . [Structurae|id=s0024218|title=Stuttgart Central Station. Retrieved on2007-07-20 ] All 17 platforms were converted to electric power in 1933.During the
Second World War the Hauptbahnhof was severely damaged a number of times by allied bombing.The building's façade bears an illumination featuring a quotation from Stuttgart-born philosopher Hegel (only visible at night) "… daß diese Furcht zu irren schon der Irrtum selbst ist." [… whether this fear of error is not just the error itself.]
Redevelopment
Stuttgart Hauptbahnhof is to be redeveloped to a design by Düsseldorf architect Ingenhoven Overdiek und Partner with
Frei Otto andBuro Happold 's German arm Happold Ingenieurbüro. [http://findarticles.com/p/articles/mi_m3575/is_1274_213/ai_100240969] [http://www.building.co.uk/story.asp?storyCode=4242] [http://www.ingenhovenarchitekten.de/flash/iup_pop.php] The station building redevelopment is part of a rail project calledStuttgart 21 .On19 July 2007 , it was announced by the Federal Government, the State ofBaden-Württemberg andDeutsche Bahn that the project had been officially approved, releasing€ 2.8 billion for the project. Building work is expected to start in 2010. [http://www.swr.de/nachrichten/bw/-/id=1622/nid=1622/did=2387316/pyrcro/index.html "Einigung auf Finanzierung von Stuttgart 21"] , "SWR3 Radio news",19 July 2007 de icon]Operational usage
Stuttgart is a hub in the
InterCityExpress andInterCity network, with long distance trains calling at the main line terminus.RegionalExpress andRegionalBahn services are offered as well. Starting June 2007, the newTGV POS runs between Stuttgart and Paris four times a day. The journey takes 3h 40m reaching speeds of up to 320 km/h. TheStuttgart S-Bahn station is situated under the station building whilst the local light rail network, theStuttgart Stadtbahn has its station under the "Arnulf-Klett-Platz" in front of the station, to which it is linked by a passenger underpass.Notes
References
*de|Stuttgart Hauptbahnhof
Wikimedia Foundation. 2010.