- Tseung Kwan O Line
Chinese|t=將軍澳綫|s=将军澳线|p=Jiāngjūn'ào xiàn
j=zoeng1 gwan1 ou3 sin3|y=jeung1 gwan1 ou3 sin3The HK-MTR lines|Tseung Kwan O is one of the eleven lines of the
MTR system inHong Kong . It runs fromHong Kong Island to thenew town ofTseung Kwan O . The line is indicated with the colourpurple . During the morning rush hour, the Tseung Kwan O Line needs 15 trains in service to keep 2.7 minute intervals. It currently travels through 7 stations in 15 minutes along its route.Route map
History
This line was planned to serve the new town of
Tseung Kwan O (literally, "General's Bay"), and after being approved by the Hong Kong Executive Council on20 October 1998 , construction commenced on24 April 1999 . The line opened on18 August 2002 , and took over the train tracks running through theEastern Harbour Tunnel from the HK-MTR lines|Kwun Tong. Subsequently, the Kwun Tong Line was diverted to Tiu Keng Leng station on the new line.This line is the first
MTR line with no track onviaduct s. The portion of the line between Yau Tong and Po Lam has its concourses set on ground level or above, unlike other stations on the MTR network which have concourses underground. Trains at Yau Tong and Po Lam are also at ground level, but are completely covered to minimise noise to the surrounding development. The rest of the line has its tracks below ground level.Not all of the line was newly constructed. Quarry Bay station and the tunnels crossing
Victoria Harbour had been in use for over 10 years by the Kwun Tong Line.Trains
Originally, the
MTR bought a batch of new trains to serve the new line, known as "K-Stock", jointly manufactured by ROTEM consortium (South Korea) and Mitsubishi (Japan). The purpose was for quieter travel and the energy of deceleration can be retransmitted to the train. However at the launch of the line, the original "M-trains" (G-Stock, H-Stock and Q-Stock) ran on the new line, while the new trains were transferred to the HK-MTR lines|Kwun Tong for service.tations
This is a list of all the stations on the Tseung Kwan O Line. The coloured boxes holding the station names represent the unique colour motif for the station.
Future development
A branch of the Tseung Kwan O Line is now under construction. The line will branch from
Tseung Kwan O Station toLOHAS Park Station to serve the new residential estates near the station.According to Rail Projects Under Planning 2000 released by Highways Department; in the North Island Line proposal, the Tseung Kwan O line will extend from
North Point Station westwards toTin Hau Station , and take up the western portion of the HK-MTR lines|Island.References
ee also
*
Transport in Hong Kong
*List of areas of Hong Kong External links
* [http://www.mtr.com.hk/eng/extensions/success_tke_e.htm Success Story - Tseung Kwan O Extension Project, MTRCL, 2005]
Crossings navbox
structure=Tunnel crossings
place=Victoria Harbour
bridge=Eastern Harbour Crossing Tseung Kwan O Line between Yau Tong and Quarry Bay
upstream=Cross-Harbour Tunnel
upstream text=West
downstream=(none)
downstream text=East
Wikimedia Foundation. 2010.