- St. Georges Bridge (Delaware)
Infobox_Bridge
bridge_name= St. Georges Bridge
caption=
official_name=
also_known_as=
carries= (4 lanes)
crosses=Chesapeake & Delaware Canal
locale=St. Georges, Delaware
maint=U.S. Army Corps of Engineers
id=
design=Tied arch bridge
mainspan= convert|450|ft|m [http://www.dnrec.state.de.us/DNREC2000/Divisions/AWM/sirb/Proposed_Plans/KLT05019.pdf]length= convert|4209|ft|m
width= approx. convert|28|ft|m
clearance=
below= convert|133|ft|m
traffic=
open= 1942 [ [http://www.nap.usace.army.mil/cenap-pa/nr020815.htm St Georges Bridge resumes normal traffic ] ]
closed=
toll=
map_cue=
map_
map_text=
map_width=
coordinates= coord|39.552568|N|75.651051|W|display=inline,title|name=St. Georges Bridge
lat=
long=The St. Georges Bridge is a steel
truss bridge with a tied arch span that carriesU.S. Route 13 across theChesapeake & Delaware Canal inSt. Georges, Delaware . Built by theU.S. Army Corps of Engineers and opened in 1942 as a high-level crossing, the bridge was the first four-lane, high-level crossing to span the canal. It replaced a previousvertical lift bridge which was damaged when a German merchant ship collided with it.History and near replacement
Prior to the opening of the paralleling Delaware Rt. 1 Turnpike and the
Chesapeake and Delaware Canal Bridge in 1995 (renamed the SenatorWilliam V. Roth, Jr. Bridge), the bridge was the main north-south crossing in Delaware, as such, suffered from a deteriorating concrete deck and support beams that forced both the Delaware Department of Transportation and the Army Corps of Engineers to place a weight restriction and forced all through truck traffic onto the parallelingSummit Bridge (U.S. Route 301 ), seven miles to the west. The late U.S. Senator Bill Roth, who saw the need for a new crossing, was a main proponent in securing federal funding for the new C & D Canal Bridge.After the opening of the paralleling C & D Canal Bridge, the Army Corps of Engineers closed the St. Georges Bridge in anticipation of demolishing the structure. Local opposition arose, especially from residents in St. Georges, whose town spans both sides of the canal; these residents would have had to travel out of their way and pay an additional toll to go from one half of the town to the other. Instead of tearing down the bridge, the Army Corps of Engineers, using data issued from the Delaware Department of Transportation and the
U.S. Census Bureau , rehabilitated the bridge between 1998 and 2001. A new concrete deck was constructed, and deteriorated beams and joints were replaced. The lead based paint on the bridge was removed and replaced with a lead-free primer and salt-resistant enamel (the C & D Canal connects tworia s, having from time to time been inudated with brackish water during dry spells), and the bridge was reopened to local traffic. As a result of the need to maintain quick access to both U.S. 13 and the Del. Rt. 1 Turnpike, both the St. Georges Bridge and the C & D Canal Bridge have no tolls (the Army Corps of Engineers allowed DelDOT to build a South St. Georges interchange to U.S. 13 between the bridge and the Biddles Corner toll facility, with provisions to build another exit north of the bridge if needed). Prior to the mid-1990s, the St. Georges Bridge also served as the crossing forU.S. Route 301 , but this has since been shifted to the Summit Bridge along with Delaware Routes 71 and 896.Current Restrictions
The U.S. Army Corps of Engineers announced that beginning Tuesday, May 27 2008, both outside lanes across the St. Georges Bridge will be closed, limiting traffic to one lane in each direction. Also, traffic will be restricted to vehicles weighing less than 15 tons. Lane restrictions will remain in place as an extra safety measure until repairs can be made to the bridge's substructure and bearings, tentatively by the end of the calendar year. Repairs under the outside lanes will be done first. Once those are complete, the weight restriction will be lifted, the outside lanes will be reopened, and the inside lanes will be closed instead.After all repairs are completed, the bridge will be fully reopened.During a recent inspection, the Corps identified concrete surface cracks and rebar corrosion in numerous bridge piers, along with numerous highly corroded and failing bearings under the bridge deck. None of this represents an immediate danger to the public; the overall bridge structure remains sound.However, these deteriorated conditions have reduced the margin of safety.Lane and weight restrictions address this problem by limiting the load on the bridge, thus allowing time for the Corps to institute daily monitoring, conduct further analysis, and make the appropriate repairs to safely return the bridge to full operation.
ee also
* List of crossings of the Cheasapeake & Delaware Canal
References
External links
* [http://www.wikimapia.org/#y=39552567&x=-75649999&z=17&l=0&m=s&v=2 Aerial photographic image at Wikimapia]
Crossings navbox
structure = Bridges
place =Chesapeake & Delaware Canal
bridge = St. Georges Bridge
bridge signs =
upstream text = West
upstream =Chesapeake & Delaware Canal Bridge
upstream signs =
downstream text = East
downstream =Reedy Point Bridge
downstream signs =
Wikimedia Foundation. 2010.